A-NX15, NX18.Factory (CD) - 221005

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 37

ARCHITECTURAL DRAWING LIST

ITEM : FACTORY NX15,NX18

NAM TAI READY BUILT FACTORY

ARCHITECTURE
Insecticide spraying before concrete work

Insecticide spraying before concrete work


Insecticide spraying before concrete work

1 1
1 1 2
2 1
2 2 3 3
4
3 3 4 2
4 4 5 3
5 5 6 5
6 7

F1.1 F1.2 F1.3 F1.4 F1.5


FACTORY FLOOR (FIRST FLOOR) OFFICE FLOOR (FIRST FLOOR) WC FLOOR (FIRST FLOOR) ENTRANCE FLOOR CONCRETE FLOOR

GREY STONE Granite

G.75 CEMENT MORTAR 30mm THK.

SOLID BRICK STEPS

RC SLAB (REFER STRUCTURAL DWG)

EMULSION PAINT (3 LAYERS)

1
1 2
1
2 3

3 4 2
3
5

F2.1 F.st F.r


OFFICE FLOOR (SECOND FLOOR) OFFICE STAIRCASE RAMP FLOOR

OUTSIDE INSIDE OUTSIDE WC


OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE GAIN BOX

12 3 45
ng M.75
1 3 5 ng M.75 1 3 5 ng M.75 1 3
2 4 2 4 2

ng M.75

EW.1 EW.2 EW.3 EW.4 EW.5


EXTERNAL BRICK WALL EXTERNAL METAL SHEET WALL EXTERNAL WALL / WC EXTERNAL BRICK WALL EXTERNAL BRICK WALL - TECHNICAL BOX

WC WC
INSIDE WC
INSIDE INSIDE INSIDE Elevator

NAM TAI READY BUILT FACTORY

12 3 45 12 3 45 12 3 45 ng M.75
ng M.75 ng M.75

12 3 ng M.75
ARCHITECTURE

IW.1 IW.2 IW.3 IW.4


INSIDE WALL INSIDE WALL - WC INSIDE WALL - WC TECHNICAL WALL
SUMO Anti-Fading, G550

1 1

2 2
3 3

Steel Rafter (Refer structural drawing)


- Finished by ALKYD paint 80mirco THK.(01 primer layer+01 finishing layer)
- R90 fireproof paint for Rafters
i=%
1
i%
1 2
2
3
3
4

R.1 R.2 C.1 C.2


FACTORY ROOF CANOPY GYPSUM BOARD - EXPOSED CEILING

WC WC

i=%

P.1 OV.1
WC PARTITION R.C OVERHANG

25 25
PLATE-PL10

ROLLING DOOR / ELEVATOR

PLATE DETAIL

STEEL PIPE D114x4MM


PAINTED COLOR BLACK & YELLOW
STEEL GUARD POST

PLATE-PL10

ROLLING DOOR / ELEVATOR

DETAIL OF GUARD FOR CORNER OF COLUMN & WALL


IN MOVING FORKLIFT AREA STEEL GUARD POST- PLAN STEEL GUARD POST- ELEVATION NAM TAI READY BUILT FACTORY

STEEL GUARD POST DETAIL FOR ROLLING DOOR / ELEVATOR

ARCHITECTURE
S3
31 01

ST-4 F1.5
EW.1 F1.5 41 04
EW.1 EW.1

FL-0.200 FL-0.200

ST-5
41 04
AW.4 AW.6 AW.6 AW.6 AW.6 AW.6 AW.6 AW.4
Y11 Y11
ED.1
ED.1
ED.1
F1.5 FL-0.300

RD.1

FL-0.200
F.r AW.5

EW.1 EW.1
Y10 Y10

S2
31 01

RD.1 AW.4

FL-0.150
FL-0.300

ED.1
Y9 F1.5 Y9

AW.4 AW.4

EW.1 EW.1
FACTORY AREA
Y8 Y8
F1.1

ST-1 AW.5
41 01 EW.3
FL-0.300
AW.4
LV.1 AW.3 AW.2 AW.3
UTILITY
Y7a
AD.3 AD.2
7

5
AD.3
AW.1
Y7 3
AD.3
Y7
AD.2
AD.3 IW.2
1

S1
31 01 FD.1
F1.5 IW.2
EW.4 AW.4
AD.1 OFFICE AREA
FL-0.200
AW.1 IW.1
F1.2
Y6a
ED.1

Y6 F1.5
ED.1
IW.1
OFFICE Y6
42 01
FL-0.300 AW.1 EW.1
OFFICE AREA
FL-0.250 AD.1
EW.4 IW.1 AW.4
F1.2
IW.2
F1.5
FD.1
1
AD.3
AD.2 AD.3
Y5 AW.1
5
3
Y5
AD.3
7

AD.3 AD.2
FL-0.300
UTILITY
Y4a LV.1 AW.3 AW.2 AW.3

AW.4
ST-1 EW.3
41 01 AW.5

FACTORY AREA
EW.1
Y4 Y4
EW.1 F1.1

AW.4 AW.4

FL-0.300 F1.5
Y3 Y3
ED.1

F.r

AW.4
RD.1
FL-0.150

Y2 Y2
EW.1 EW.1

AW.5 ST-5
41 04
RD.1
NAM TAI READY BUILT FACTORY

FL-0.300
F1.5
ED.1
ED.1
ED.1
Y1 AW.4 AW.4
Y1
AW.6 AW.6 AW.6 AW.6 AW.6 AW.6 FL-0.200
ARCHITECTURE
F1.5
FL-0.200
EW.1 EW.1 EW.1

X1 X1a X2 X3 X4 X5 X6 X7 X8 X9 X10
Tl: 1/200
FIRST FLOOR PLAN Sc: 1/200
S3
31 01

ST-4
EW.2 41 04 EW.2 EW.2
GW.1

ST-5
41 04
AW.4 AW.4
Y11 Y11

5%
AW.4

AW.5

EW.2
Y10 Y10
EW.2

S2
31 01
AW.4
5%

Y9 Y9

AW.4
5%

Y8 Y8
EW.2

EW.1 AW.5
ST-1
41 01

Y7a
LV.1 AW.8 AW.8 AW.8 Y7a
25 25

27 23

29 21

Y7 31 19

AD.2
Y7
33

FD.1
IW.1

S1 OFFICE AREA
31 01 FL+5.000
AW.7
F2.1

GW.2
IW.1
EW.5 IW.1 Y6a
Y6

EW.2
Y6
IW.1
OFFICE AREA
FL+5.000 OFFICE
F2.1 42 01
AW.7

FD.1 IW.1
33
AD.2
Y5 31

29
19

21
Y5
27 23
IW.1
25 25

Y4a Y4a
LV.1 AW.8 AW.8 AW.8

ST-1
41 01
AW.5
EW.1 EW.1

EW.2
Y4 Y4

5%

AW.4

Y3 Y3

5%
AW.4

EW.2
Y2 Y2
EW.2

AW.5 ST-5
41 04
NAM TAI READY BUILT FACTORY
5%AW.4

Y1 AW.4 AW.4
Y1
EW.2 EW.2 ARCHITECTURE
EW.2
GW.1

X1 X1a X2 X3 X4 X5 X6 X7 X8 X9 X10

Tl: 1/200
SECOND FLOOR PLAN Sc: 1/200
S3
31 01

ST-4
CA-1 41 04
43 01
ST-5
41 04

Y11

5%

5% 5%
Y10

S2
31 01

5%

R.2

R.1 R.1
Y9

5%

5% 5%
Y8

Y7a

Y7
5%

S1
31 01

Y6a 5% 5%

R.1 R.1 R.1


Y6

5%

Y5

Y4a

5% 5%
Y4

5%

Y3

5%

R.2 R.1 R.1

5% 5%
Y2

ST-5
41 04
NAM TAI READY BUILT FACTORY
5%

Y1
ARCHITECTURE
CA-1
43 01

X1 X1a X2 X3 X4 X5 X6 X7 X8 X9 X10

Tl: 1/200
ROOF PLAN Sc: 1/200
CA-1
43 01
ST-4
41 04 CA-1
R.1 EW.2 EW.1 R.1 EW.1 EW.2 R.1
FL+12.480 43 01 FL+12.480

FL+9.000 FL+9.000
AW.4 AW.4 AW.4 AW.5 AW.5 AW.4 AW.4 AW.4
AW.7 AW.7

FL+5.000 FL+5.000

RD.1 RD.1 AW.4 AW.5 AW.5 AW.4 RD.1 RD.1


AW.1 AW.1 AW.1 AW.1
ED.1 ED.1 ED.1 ED.1

FL-0.300 FL-0.300
EW.1 EW.1

Y11 Y10 Y9 Y8 Y7a Y6 Y4a Y4 Y3 Y2 Y1

Tl: 1/200
ELEVATION Y10-Y1 Sc: 1/200

GW.2
ST-5 ST-5
41 04 R.1 EW.2 R.1 EW.2 EW.2 R.1 41 04
FL+12.480 FL+12.480

FL+9.000 FL+9.000
AW.5 GW.2 AW.5

FL+5.000 FL+5.000

AW.5 AW.4 AW.4 AW.4 AW.4 AW.4 AW.4 AW.4 AW.4 AW.5

ED.1 ED.1 ED.1 ED.1

FL-0.300 FL-0.300
EW.1 EW.1 EW.1

Y1 Y2 Y3 Y4 Y5 Y6 Y6a Y7 Y8 Y9 Y10 Y11

Tl: 1/200
ELEVATION Y1-Y11 Sc: 1/200

ST-5
FL+12.480 EW.2 41 04
FL+12.480
EW.2 EW.2 EW.2

FL+9.000 GW.1
FL+9.000
AW.4 AW.4

LV.1 AW.8 AW.8 AW.8

FL+5.000 FL+5.000

AW.4 AW.6 AW.6 AW.6 AW.6 AW.6 AW.6 AW.4


LV.1
AW.3 AW.2 AW.3
ED.1

FL-0.300 FL-0.300
EW.3 EW.1 EW.1 EW.1

X1 X1a X2 X3 X4 X5 X6 X7 X8 X9 X10

Tl: 1/200
ELEVATION X1-X10 Sc: 1/200

ST-5
41 04 EW.2 EW.2 EW.2 EW.2
FL+12.480 FL+12.480
ST-5
41 04

FL+9.000 GW.1
FL+9.000
AW.4 AW.4
NAM TAI READY BUILT FACTORY
AW.8 AW.8 AW.8 LV.1

FL+5.000 FL+5.000

AW.4 AW.6 AW.6 AW.6 AW.6 AW.6 AW.6 AW.4


LV.1
AW.3 AW.2 AW.3
ED.1 ARCHITECTURE

FL-0.300 FL-0.300
EW.1 EW.1 EW.1 EW.3

X10 X9 X8 X7 X6 X5 X4 X3 X2 X1a X1

Tl: 1/200
ELEVATION X10-X1 Sc: 1/200
R.1 R.1
FL+12.480 FL+12.480

FL+9.000 FL+9.000

F2.2
FL+5.000 FL+5.000

F1.1 F1.1
F1.2

FL-0.300 FL-0.300

X1 X1a X2 X3 X4 X5 X6 X7 X8 X9 X10

Tl: 1/200
SECTION S1 Sc: 1/200

R.1

FL+9.000

R.2

FL+5.000

Steel Rafter (Refer structural drawing)


- Finished by ALKYD paint 80mirco THK.(01 primer layer+01 finishing layer)
- R90 fireproof paint for Rafters

F1.1 Steel Column (Refer structural drawing)


- Finished by ALKYD paint 80mirco THK.(01 primer layer + 01 finishing layer)
- R90 fireproof paint for Columns

FL-0.300

X2
Tl: 1/100
SECTION S2 Sc: 1/100

R.1 R.1
FL+12.480 FL+12.480

FL+9.000 FL+9.000

FL+5.000 FL+5.000

F1.1 F1.1

NAM TAI READY BUILT FACTORY


FL-0.300 FL-0.300

ARCHITECTURE
Y11 Y10 Y9 Y8 Y7 Y6a Y6 Y5 Y4 Y3 Y2 Y1

Tl: 1/200
SECTION S3 Sc: 1/200
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
NAM TAI READY BUILT FACTORY

ARCHITECTURE
OUTSIDE Steel box, powder coated
INSIDE

S1 Door closer
S1

Hinge Inox 304


Rail U powder coated
Inox handle
Tempered clear glass t=6mm
Steel frame t=1.5mm, powder coated OUTSIDE Steel panel, 2 sides, t=0.9mm, powder coated
Steel t=0.9mm, powder coated
Inox handle Inox handle Control box
Panic bar

Panic bar
Steel panel, 2 sides, t=0.9mm, powder coated
INSIDE

Steel frame t=1.5mm, powder coated FFL


Finishing Level

Tl: 1/25
INSIDE
PLAN Sc: 1/25 Tl: 1/25
SECTION Sc: 1/25
ED.1 RD.1

Tl: 1/25
Single open door-Steel exit door. Steel frame t=1.5mm, steel panel 2 side t=0.9mm, powder coated. Steel rolling door - operate by motor with uninterruptible power supplier (ups); Powder coating steel laminate 0.9mm thickness
Tempered clear glass t=6mm. Full Inox 304 accessories ELEVATIONSc: 1/25 * Note: style, color & accessories will be approved by the investor

01 01 04 01 01 01
LOCK HANDLE HINGE LOCK HANDLE HINGE MOTOR

Steel box, powder coated

2
2 Door closer Door closer

Inox handle Hinge Inox 304


Rail U powder coated

Anti smoke rubber seal Tempered clear glass t=6mm

Steel t=0.9mm, powder coated


Inox handle Inox handle Control box
Panic bar

Panic bar
Doorsill Inox 304

Layers of insulating &fire resistant boards

Steel frame t=1.5mm, powder coated FFL


Finishing Level
Tl: 1/25
PLAN Sc: 1/25
Layers of insulating & fire resistant boards

FFL

FD.1 RD.2

/ Fireproof door - Rated EI60 Tl: 1/25 Tl: 1/25


.
Steel rolling door - operate by motor with uninterruptible power supplier (ups); Powder coating steel laminate 0.9mm thickness
Single open door. Fireproof steel door, powder coated. Steel frame t=1.5mm,
Steel panel both side, t=0.9mm with fire resistant board. Tempered clear glass t=6mm. Full Inox 304 accessories
ELEVATIONSc: 1/25 SECTION Sc: 1/25 * Note: FIRE FIGHTING RATED EI60; style, color & accessories will be approved by the investor

01 01 04 01 01 01
LOCK HANDLE HINGE LOCK HANDLE HINGE MOTOR

NAM TAI READY BUILT FACTORY

Finishing Level FFL FFL FFL FFL

ARCHITECTURE

AD.1 AD.2 AD.3 LV1

.
Wood grain steel double door.
Matt stainless steel 304 handle . Full stainless steel 304 accessories

01 01 08 02 01 01 03 01 01 01 03 01
LOCK HANDLE HINGE LOCK HANDLE HINGE LOCK HANDLE HINGE LOCK HANDLE HINGE
Fixed Fixed

Fixed Fixed

Fixed

Fixed Fixed Fixed Fixed

Finishing Level

AW.1 AW.2 AW.3 AW.5 AW.8

Aluminium window. Frame system 1000, powder coating finished. Awning window. Frame system 700, powder coating finished. 2 leaves awning window. Frame system 700, powder coating finished. Aluminium window. Frame system 1000, powder coating finished. Awning window system. Frame system 700, powder coating finished.
Tempered clear glass t=8mm. Tempered clear glass t=6mm. Full stainless steel 304 accessories Tempered clear glass t=6mm. Full stainless steel 304 accessories Tempered clear glass t=6mm. Tempered clear glass t=6mm. Full stainless steel 304 accessories

01 01 02 02 02 04 01 01 02
LOCK HANDLE HINGE LOCK HANDLE HINGE LOCK HANDLE HINGE LOCK HANDLE HINGE LOCK HANDLE HINGE

Fixed Fixed Fixed Fixed Fixed

Finishing Level

AW.4 AW.6 AW.7

Aluminium window. Frame system 1000, powder coating finished. Aluminium window. Frame system 1000, powder coating finished. Aluminium window. Frame system 1000, powder coating finished.
Tempered clear glass t=6mm. Tempered clear glass t=6mm. Tempered clear glass t=8mm.

LOCK HANDLE HINGE LOCK HANDLE HINGE LOCK HANDLE HINGE

X~ X~ Y~ Y~

NAM TAI READY BUILT FACTORY

Finishing Level

ARCHITECTURE

GW.1 GW.2

Aluminium window. Frame system 1000, powder coating finished. Aluminium window. Frame system 1000, powder coating finished.
Tempered clear glass t=6mm. Tempered clear glass t=6mm.

LOCK HANDLE HINGE LOCK HANDLE HINGE

You might also like