This document contains a table summarizing excavation, embankment, and other volume calculations for various sections of a proposed roundabout intersection project in Tuzla, Bosnia and Herzegovina. The table includes calculations for excavation, embankment, stripping of topsoil, replacing topsoil, and establishing the road base for multiple branches and sections of the roundabout. The total volumes calculated include 1352 cubic meters of excavation for Branch A, 827 cubic meters for Branch B, and totals for other branches and sections of the roundabout.
This document contains a table summarizing excavation, embankment, and other volume calculations for various sections of a proposed roundabout intersection project in Tuzla, Bosnia and Herzegovina. The table includes calculations for excavation, embankment, stripping of topsoil, replacing topsoil, and establishing the road base for multiple branches and sections of the roundabout. The total volumes calculated include 1352 cubic meters of excavation for Branch A, 827 cubic meters for Branch B, and totals for other branches and sections of the roundabout.
This document contains a table summarizing excavation, embankment, and other volume calculations for various sections of a proposed roundabout intersection project in Tuzla, Bosnia and Herzegovina. The table includes calculations for excavation, embankment, stripping of topsoil, replacing topsoil, and establishing the road base for multiple branches and sections of the roundabout. The total volumes calculated include 1352 cubic meters of excavation for Branch A, 827 cubic meters for Branch B, and totals for other branches and sections of the roundabout.