Introduction

PRODUCTION EQUIPMENT
WELL COMPLETION EQUIPMENT

• 1.1 Introd. to Surface&DH


Equip. and Well Completion
 a. Surface & DH
Equipment
 b. Well Completion
• 1.2 Basic of Slick Line
Operation
• 1.3 Basic of Electric Line
Operation
WELL HEAD & DOWN HOLE EQUIP.

Well Head :
Associated Well equipment on surface

Down Hole Equip. :


Associated Well equipment set down hole

1.1a Surface & Down Hole Equipment 3


WELL HEAD

Well Head :

Xmast Tree

Casing Head &


Tubing Head

1.1a Surface & Down Hole Equipment 4


WELL HEAD - Single Composite XmasTree

Kill valve

1.1a Surface & Down Hole Equipment 5


WELL HEAD

Well Head :
Solid Block Single

1.1a Surface & Down Hole Equipment 6


WELL HEAD

Well Head :

Solid Block Single

1.1a Surface & Down Hole Equipment 7


WELL HEAD

Compact
Well Head:

1.1a Surface & Down Hole Equipment 8


WELL HEAD

Well Head:

1.1a Surface & Down Hole Equipment 9


WELL HEAD Dual Solid Block XmasTree

Dual Xmastree BKP/HDL

1.1a Surface & Down Hole Equipment 10


WELL HEAD

1.1a Surface & Down Hole Equipment 11


SURFACE & DOWN HOLE EQUIP.

Surface Equipment:

Well Head :
Casing Head
Tubing Head

Xmast Tree

1.1a Surface & Down Hole Equipment 12


WELL HEAD

To be remembered
Tree Cap/Adaptor
Swab Valve ~ SWV
Upper Master Vv(Act) ~ UMV W/ or W/out Wire Cut
Lower Master Valve ~ LMV
Wing Valve (Act) ~ FWV  SSV
Kill Line Valve ~ KWV
Choke Valve ~ CHV
Flow Line Valve ~ FLV
Casing Valve “0” ~ Annulus 0
Casing Valve “1” ~ Annulus 1

1.1a Surface & Down Hole Equipment 13


WELL HEAD

FWV
SWV
CHV
KWV
FLV
UMV
LWV

Ann 0 Ann 0
Ann 1 Ann 1

1.1a Surface & Down Hole Equipment 14


WELL HEAD

Well
Head :

1.1a Surface & Down Hole Equipment 15


WELL HEAD Single Horizontal Xmastree

1.1a Surface & Down Hole Equipment 16


WELL HEAD Dual Xmastree

1.1a Surface & Down Hole Equipment 17


WELL HEAD

Well Head :
(Splitter)

In one 30”


Conductor there are 2x
9 5/8” Prod Casing
Consist of 2
different wells with its
different
direction&trajectory

1.1a Surface & Down Hole Equipment 18


WELL HEAD

Well Head :
(Splitter)

1.1a Surface & Down Hole Equipment 19


WELL HEAD Splitter Well Head

Well Head :

Syafruddin Zubaer

1.1a Surface & Down Hole Equipment 20


WELL HEAD

Well Integrity

To ensure the Safe status of Well Head and DHSV


(….and other DH Equipments if required)
Integrity Test
 Ref. CR – FP422 (Barrier for Completed Well)
 Xmastree Vlv’s,gaskets,Flange etc.
 Casing Valves
 Closing time response of any actuated
equipment (DHSV,Actuator etc)

1.1a Surface & Down Hole Equipment 21


WELL HEAD

Well Integrity

Time period
 Integrity Test every 6 months for XTree & DHSV
 Replacement 12 months for DHSV

Acceptable Leak Rate


 15 SCFM for Gas leak
 25 Ltr/Hour for Liquid Leak

1.1a Surface & Down Hole Equipment 22


DOWN HOLE EQUIP.

Down Hole Equip.


WLEG (Wire Line Entry Guide)
Landing Nipples( Top NoGo,Bottom NoGo)
Packer (Single/Dual, Mech/Hydraulic/Electric,
Permanent/ Retrievable)
Circulating Device (SSD,SPM,Port Nipple etc)
Tubing
Special Joint(Blast /Perforated/Expansion/ Protection /
Flow Coupling)
DHSV (WRSV/TRSV)
Tubing Hanger

1.1a Surface & Down Hole Equipment 23


DOWN HOLE EQUIP.

Completed well

1.1a Surface & Down Hole Equipment 24


DOWN HOLE EQUIP.

Wire Line Entry Guide

1.1a Surface & Down Hole Equipment 25


DOWN HOLE EQUIP.

Landing
Nipple

1.1a Surface & Down Hole Equipment 26


DOWN HOLE EQUIP.

PACKER

1.1a Surface & Down Hole Equipment 27


DOWN HOLE EQUIP.

 PACKER
Setting:
Wire Line,Hydraulic
Mechanical
Retrievability:
Retrievable,Permanent
Tubing String:
Single
Dual

1.1a Surface & Down Hole Equipment 28


DOWN HOLE EQUIP.

Sliding Side Door

1.1a Surface & Down Hole Equipment 29


DOWN HOLE EQUIP.

SPM (Side
Pocket
Mandrel)

1.1a Surface & Down Hole Equipment 30


DOWN HOLE EQUIP. F.Coupling/P.Tube

1.1a Surface & Down Hole Equipment 31


DOWN HOLE EQUIP.

Safety Valve
Surface Safety Valve (SSV)

Sub Surface Safety Valve (DHSV)


DHSV  Fail Save

Sub Surface Controlled SV (SSCSV)


Surface Controlled Sub Surface SV (SCSSV)

1.1a Surface & Down Hole Equipment 32


DOWN HOLE EQUIP.
Control Line (To Surface)

SCSSV Type Lock Mandrel

TRSV (Tbg Retrv)


WRSV(WL Retrv)
Hydraulic Landing Nipple

SSCSV Type
Press Diff SV
Ambient SV ( “K” valve)
Wireline Installed Surface Controlled
Sub-Surface Safety Valve

1.1a Surface & Down Hole Equipment 33


DOWN HOLE EQUIP.
Control Line (To Surface)

SV
DHSV  SSSV (Fail Save)
Sub Surface Controlled SV Lock Mandrel

Surface Controlled Sub Surface

Valve Closure
Ball Type Hydraulic Landing Nipple

Flapper Type

Equalizing system
Equalizing Type Wireline Installed Surface Controlled
Sub-Surface Safety Valve

Non Equalizing Type

1.1a Surface & Down Hole Equipment 34


DOWN HOLE EQUIP.
C o n t r o l L i n e (To S u r f a c e )

Lock Mandrel

Hydraulic Landing Nipple

Wireline Installed S u rfa ce Controlled


S u b - Su rfa ce S a fe ty Valve

1.1a Surface & Down Hole Equipment 35


DOWN HOLE EQUIP.

1.1a Surface & Down Hole Equipment 36


DOWN HOLE EQUIP.
Guideline for Hold Open Pressure

Opening Pressure
The pressure required to fully open the SV in
atmospheric condition

Hold Open Pressure


The pressure required to maintain the SV in open
conditions during well production

Recommended Hold Open Pressure


Opening Pressure+Tubing Pressure+(500 to 1000) psi

1.1a Surface & Down Hole Equipment 37


DOWN HOLE EQUIP : WR SCSSV

Hydraulic
Supply pressure
supply
usually 4000 psi

Sleeve
Packing
WR SCSSV
Spring
Open position
Pressure
equalising
line

di Flapper

1.1a Surface & Down Hole Equipment 38


DOWN HOLE EQUIP : TR SCSSV

Hydraulic
Supply pressure
supply
usually 4000 psi

Sleeve
Packing
TR SCSSV
Spring
Open position

di Flapper

1.1a Surface & Down Hole Equipment 39


DOWN HOLE EQUIP:Macaroni DBSV (Diamond Board SV)

Hydraulic Supply pressure


Packing
supply usually 4000 psi

Tubing
Sleeve Tubing sleeve

Spring

Coil Tubing
sleeve
di Flapper

1.1a Surface & Down Hole Equipment 40


DOWN HOLE EQUIP. DHSafety Valve

1.1a Surface & Down Hole Equipment 41


DOWN HOLE EQUIP. DHSafety Valve

1.1a Surface & Down Hole Equipment 42


DOWN HOLE EQUIP. Self-Equalizing Flapper

• When the valve is closed, the


equalizing mechanism’s port
is protected from debris

• The Flow Tube depresses


the plunger to open an
equalizing path prior to the
valve opening

• The Flapper swings


completely out of the flow
path, protecting the Flapper
and seat from wireline tool
damage. The equalizing
feature returns to the closed
position when the valve is
fully open

1.1a Surface & Down Hole Equipment 43


DOWN HOLE EQUIP.

Production Tubing
• Size : 2” – 2 3/8” , 2 1/2” – 2 7/8”, 3” – 3 ½” ,
4” – 4 ½” , 5” - 5 ½”
• Length : R1 ( 7,5 - 8,5 m)
R2 ( 8,5 – 9,5 m)
R3 ( 9,5 - 10,5 m)
• Thread Type :
VAM , Atlas Breadford, Upset,Non Upset,CS
Hydrill etc

1.1a Surface & Down Hole Equipment 44


DOWN HOLE EQUIP.

Tubing Hanger

1.1a Surface & Down Hole Equipment 45


WELL HEAD

CASING HEAD TUBING HEAD

1.1a Surface & Down Hole Equipment 46


DOWN HOLE EQUIP.

Tubing Hanger Plug


Wire Line Set
Mechanical Set

1.1a Surface & Down Hole Equipment 47


DOWN HOLE EQUIP.

Tbg Hanger Plug ( Mechanical set)

1.1a Surface & Down Hole Equipment 48


DOWN HOLE EQUIP.

1.1a Surface & Down Hole Equipment 49


DOWN HOLE EQUIP.

Well Flow
NATURAL FLOW

ARTIFICIAL LIFT
–Pumping Method
- Sucker Rod : Beam Pumping,PCP
- ESP (Electric Submergible Pump)
- Hydraulic Jet
–Gas Lift Method
- Continous Injection : SPM,GLM,GLPO
- Intermittent Injection

1.1a Surface & Down Hole Equipment 50


DOWN HOLE EQUIP.

ARTIFICIAL LIFT
Pumping
Sucker Rod Pump
Beam Pump
Rotary “Moyno”
Rodemip ~> PCP
Centrifugal - ESP
Hydraulic Jet
Pump
Plunger Lift

1.1a Surface & Down Hole Equipment 51


DOWN HOLE EQUIP.

ARTIFICIAL LIFT

Gas Lift
Continous
Intermittent
GL Macarony

1.1a Surface & Down Hole Equipment 52