QUY TRÌNH PHỐI HỢP DỰ ÁN SOGEC- NMT

TRƯỚC KHI KÝ KẾT HỢP ĐỒNG

XÁC ĐỊNH:

+ CÔNG SUẤT, NHU CẦU ÁP SUẤT SỬ


DỤNG KHÍ CỦA KHÁCH HÀNG.
+ THỜI GIAN BẮT ĐẦU DÙNG KHÍ CUSTOMER +
+ VỊ TRÍ, KÍCH THƯỚC TRẠM KHÍ SOGEC CUNG
+ QUY HOẠCH TUYẾN ỐNG CẤP CHO NMT

+ KHẢO SÁT
+ THỐNG NHẤT BẢN VẼ P&ID CHO
TUYẾN ỐNG, TRẠM GAS NMT+ SOGEC +
+ THIẾT KẾ BẢN VẼ THI CÔNG TBPM

THỐNG NHẤT MTO:


+ KHỐI LƯỢNG
+ CHỦNG LOẠI THIẾT BỊ
+ CHI PHÍ NMT+ SOGEC

LẬP KẾ HOẠCH THI CÔNG :


+ TUYẾN ỐNG NMT+ SOGEC
+ TRẠM KHÍ

HỢP ĐỒNG EPC SOGEC+ NMT


T

CUSTOMER +
SOGEC CUNG
CẤP CHO NMT

NMT+ SOGEC +
TBPM

NMT+ SOGEC

NMT+ SOGEC

SOGEC+ NMT
QUI TRÌNH XIN CẤP PHÉP & THI CÔNG CÔNG TRÌNH TẠI PM3

HỢP ĐỒNG EPC SOEC+ NMT

ĐẶT HÀNG
(PIPE, EQUIPMENT, SOEC+ NMT
ELECTRIC...)

CHẤP THUẬN HƯỚNG TBPM: 7-10 NGÀY SAU KHI TBPM ĐỒNG Ý =>
TUYẾN: BIZA: 7-10 NGÀY MỚI CHUYỂN ĐẾN BIZA
DỰ KIẾN: 14-20 NGÀY

THẨM DUYỆT THIẾT KẾ PCCC CS PCCC: 14-20 NGÀY KHI


CHO ĐƯỜNG ỐNG, TRẠM NHẬN ĐỦ HS
SOGEC - NMT-CUSTOMER-
PCCC

THẨM ĐỊNH THIẾT KẾ SỞ 15


T CÔNG THƯƠNG BRVT:
+ BÁO CÁO KINH TẾ KỸ
THUẬT CHO VỐN ĐẦU TƯ
DƯỚI 15 TỶ ĐỒNG. SỞ CÔNG THƯƠNG: 14-20
+ TRƯỜNG HỢP VỐN LỚN NGÀY. KỂ TỪ LÚC NHẬN ĐỦ
HƠN 15 TỶ: HỒ SƠ
BÁO CÁO KTKT & THẨM SOGEC-NMT-SCT
ĐỊNH THIẾT KẾ BV THI CÔNG

THẨM DUYỆT PCCC & PHÊ


BIZA: 14-20 NGÀY. KỂ TỪ DUYỆT TKCS CỦA SỞ CÔNG
LÚC NHẬN ĐỦ HỒ SƠ: THƯƠNG
GIẤY PHÉP XÂY DỰNG SOGEC-NMT-BIZA

THÔNG BÁO KHỞI CÔNG- BIZA: SOGEC GỬI CÔNG


ĐẾN BIZA VĂN TRƯỚC KHI THI CÔNG

BẮT ĐẦU THI CÔNG NMT

KẾT THÚC THI CÔNG NGHIỆM THU NỘI BỘ TƯ VẤN GIÁM SÁT
SOGEC-NMT (OPTION)

NGHIỆM THU PCCC PCCC BRVT: TRONG VÒNG 7-


10 NGÀY. KỂ TỪ LÚC XUỐNG
KIỂM TRA NGHIỆM THU

NGHIỆM THU HOÀN THÀNH ĐỘI NGHIỆM THU LIÊN


VỚI CƠ QUAN BAN NGÀNH. NGÀNH: SCT, SỞ XD, BIZA
+ BB KIỂM TRA CÔNG TRÌNH TRONG VÒNG 7-10 NGÀY. KỂ
+ CV ĐỒNG Ý ĐƯA CÔNG TỪ LÚC XUỐNG KIỂM TRA
TRÌNH VÀO SỬ DỤNG
TIẾN ĐỘ CẤP KHÍ TRẠM NITORI : 10/8/2020

1 ĐẶT HÀNG THIẾT BỊ 90-100 NGÀY

2 XÂY DỰNG HÀNG RÀO 45 NGÀY

3 GIA CÔNG SPOOL, SKID, CONTAINER ĐIỆN 30 NGÀY

4 LẮP ĐẶT THIẾT BỊ TẠI XƯỞNG 7 NGÀY

5 LẮP ĐẶT TẠI SITE 7 NGÀY

6 NGHIỆM THU PCCC 10 NGÀY

7 HOÀN CÔNG SCT, BIZA 15 NGÀY


8" Sở

10" Bộ