Professional Documents
Culture Documents
Return Wall (3 M Cushionl) - r2
Return Wall (3 M Cushionl) - r2
Return Wall (3 M Cushionl) - r2
LIMITED
(A GOVERNMENT OF INDIA
ENTERPRISE)
CALCULATION SHEET
BEIRA RAILWAY PROJECT,
Project
MOZAMBIQUE
DESIGN OF RETURN WALL, 3.0 M EARTH
Subject
CUSHION
Designed by
AM/Design
Checked by
DGM/DESIGN
Date
21/Jul/11
0.550
0.175
26.570
C8
0.3
0.0
E1
E3
C2
E2
E4
1.2
2.4
C1
C3
0
0.35
2.7
0.10
E5
E7
G.L.
0.75
A
0.15
C4
0.75
C5
E8
C6
0.00
1.2
0.15
C7
1.80
Heel
0.30
Toe
Formation width =
5.5 m
Distance of heel from c/l of track for earthfill =
1.5 m
Fill ht. =
0m
Sleeper Lengh =
2.06 m
Width for surcharge distribution =
7.457 m
Distance of heel from c/l of track for surcharge distribution =
2.479 m
Overlap of width
Ht./width of overlap from heel point =
0.979 m
Ht. for surcharge pressure =
0.625 m
H3 =
0.792 m
Soil Parameters
=
35
0.61087
cos^2 (phi-alpha) =
0.95677
I=
26.57
0.46373
cos^2(alpha)*cos(alpha+delta) =
0.69691
alpha=
23.00
0.40143
sin(phi+delta)*cos(phi-i) =
0.10663
delta=
11.67
0.20362
cos(alpha+delta)*cos(alpha-i) =
0.82088
0
0.00000
seismic factors imp_factor =
beta =
0
0.00000
Ka =
0.7418
o=
0
0.00000
submerged=
n
Concrete Mix M =
permissble bending stress of conc.
permissble stress of conc. In tension
Unit Weight of c. conc. =
Unit Weight of earth =
Surcharge Load =
Analysis per m length of face/return wall
Item
Conc-1 (C1)
Conc-2 (C2)
Conc-3 (C3)
Conc-4 (C4)
Conc-5 (C5)
Conc-6 (C6)
Conc-7 (C7)
Conc-8 (C8)
EW1 (E1)
V. Load
H. Load
t
0.462
0.792
0.132
0.990
1.980
0.000
1.188
0.000
0.378
25 N/mm2
8.5 N/mm2
0.85 N/mm2
2.2
1.8
2.35
L..A.from
heel
m
1.133
1.400
1.583
0.650
1.275
1.650
0.900
1.400
1.017
t/m3
t/m3
t/m2
Moment
about
heel
tm
0.524
1.109
0.209
0.644
2.525
0.000
1.069
0.000
0.384
850 t/m2
85 t/m2
Ka =
0.7418
tm
0.308
0.317
0.029
1.139
1.040
0.000
1.069
0.000
0.296
EW2 (E2)
EW3 (E3)
0.000
1.620
0.900
0.525
0.000
0.851
0.900
1.275
0.000
2.066
EW4 (E4)
EW5 (E5)
EW6 (E6)
EW7 (E7)
EW8 (E8)
EP2-active-Vert
EP2-Hor.
EP1-active-Vert
EP1-Hor.
Total
0.648
0.810
0.703
0.000
0.324
6.198
8.962
0.972
1.406
17.197
0.075
0.400
0.417
1.650
1.725
0.000
1.108
0.979
0.489
0.049
0.324
0.293
0.000
0.559
0.000
9.933
0.951
0.688
10.368
1.725
1.400
1.383
0.150
0.075
1.800
1.108
0.822
0.489
1.118
1.134
0.973
0.000
0.024
11.156
-9.933
0.799
-0.688
20.110
10.845
20.11/ 17.197 =
1.169 m
0.900 m
0.269 m
c.g. is away from fill
1.169-1.8/2 =
1.8x1.0 =
1.0x1.8^2/6 =
Max pressure =
Min pressure =
0.631
1.8 m2
0.540 m3
18.133 t/m2
0.975 t/m2
0.31+0.32+0.03+1.14+1.04+0+0.3+0+2.07+1.12+1.13+0.97+0+11.16
21.466
t-m
9.933+0.688
10.621 t-m
2.021 o.k.
30
0.00
0.00
10.00
0.45 m
0.52360
0.00000
0.00000
0.17453
cos^2 (phi+alpha) =
cos^2(alpha)*cos(alpha-delta) =
sin(phi+delta)*cos(phi+i) =
cos(alpha-delta)*cos(alpha-i) =
Kp =
4.1433
1.95 m
14.18 t
4.73 t
1.524 o.k.
3.349
2.212
1.501
0.7418
0.078 m
0.702 m
la from
toe
m
0.517
0.250
0.067
0.250
0.633
0.633
0.750
0.400
0.672
0.039
moment
about toe
tm
0.239
0.198
0.009
0.000
0.239
0.035
1.089
-0.840
0.052
-0.004
1.017
0.75000
0.98481
0.32139
0.98481
0.304 m
0.38 m
-0.071 m
c.g is away from fill
0.750 m2
0.094 m3
Max stress =
Min stress =
V
t
0.462
0.792
0.132
0.990
1.980
0.000
0.000
0.378
0.000
1.620
0.810
0.545
0.000
4.038
0.823
Max stress =
Min stress =
4.503 t/m2
11.159 t/m2
O.K.
O.K.
0.829 m
0.327 m
la from
moment
toe
t
m
tm
0.517
0.239
0.250
0.198
0.067
0.009
1.000
0.990
0.375
0.743
0.000
0.000
0.250
0.000
0.633
0.239
0.75
0.000
1.125
1.823
1.250
1.013
1.133
0.617
0.000
0.000
1.500
6.058
5.840
0.800
-4.672
0.972
0.800
1.190
0.414
-0.493
7.562
stresses
O.K.
O.K.
11.747
1.917 t/m2
7.013 t/m2
0.644 m
0.75 m
-0.106 m
c.g. is away fill
1.5 m2
0.375 m3