STAIRS (0623)
WEEKLY POURING SCHEDULE
WEEKLY POURING SCHEDULE
BLDG 4.
FOUNDATION
PILE CAP
GL. AC-AD/47-48
BLDG 3.
FOUNDATION
PILE CAP
GL. I-K/35-36
BLDG 2.
BSMT1-UGF
STAIR/SHEARWALL
GL. D-E/17-18
BLDG 3. BSMT 2.
AREA 5
PRESSURE SLAB
GL. U-W/29-35
GL. L'-W/22-23
BLDG 3.
BLDG 2. BSMT 1 FOUNDATION
AREA 4 PILE CAP
COLUMNS (1STLIFT) GL. P-T/35-36
GL. B’-H’/22-24
WEEKLY POURING SCHEDULE
BLDG 1. UGF
AREA 8 BLDG 4.
SLAB
G.L. A"-B’/11’-15’ FOUNDATION
PILE CAP
GL. AA-AD/44-47