Professional Documents
Culture Documents
ERP Manuf C2C ENG
ERP Manuf C2C ENG
Manufacturing Game
Last Update: July 14, 2021
- Main processes (operational) are processes within a process that deliver the output.
- Supporting processes are processes that are necessary to ensure the main process is given
everything it needs to meet the purpose for which it is designed, deployed and operated.
• The cycle begins with planning, where you will forecast how much of one finished product you expect to sell in
the period. Later from this forecast, you will generate two plans:
– A plan to produce the forecasted amount of products
– A plan to purchase the raw materials needed for the production plan
• After executing the planning process, you will complete the procurement process, where you will order,
receive and pay for the raw materials.
• Once the raw materials have been received and paid for, you will complete the production process, by turning
these raw materials into finished goods.
• Finally, you will complete the sales process, where you enter an order from a customer to sell some of those
goods, ship the sold goods, send an invoice to the customer, and ultimately receive payment from the customer.
ME59N
MD01 MIGO CO41
Create
MRP Run Post Goods Movement Convert Planned Orders
Purchase Orders
each process.
F-28
Post Incoming
Payments
Password: ERPSIM
• You will sell just one product, 1kg Original Muesli (material code ###-F15)
• You will produce only 24 000 units of this product
• You will sell 1 000 units of this product to customer 80105 from distribution
channel 10
TAKE NOTE: REFER TO YOUR NOTES:
This icon means you have to take note of some This icon means you have to refer back to the
information since you will be needing it for a future information previously noted.
transaction.
MD61
MD01
Create Planned
MRP Run
Independent Requirements
Independent Purchase
Requirement Requisition
Planned
Order
Create Planned Indep. Req. (MD61) MRP Run (MD01) Create Purchase Orders (ME59N) Post Goods M
1
Select Product group and enter Enter Purcha
1 your company code* followed
by a dash and product group F: 1
Press Enter or click
1
<company code> - F
Press Enter a
2 the Close De
2
icon if open
!
Ignore orange warnings
2 Press two more times on Enter Purchase orders are created
3 Check all th
OK column
MD61
MD01
Create Planned
MRP Run
Independent Requirements
Planned
Order
2
icon if open
Ignore orange warnings
2 Press two more times on Enter ! 3 Press Enter 3 Under Bank Data, in Amount,
Purchase orders are created
3 Check all the boxes of the
OK column In Amount, enter the same
enter the amount to pay
4
Under Open Item Selection, in
4 Enter 88 in SLoc
amount as the one in
3 Enter your forecast quantities
in the 2nd date column
4 Account, enter the vendor #
1 1
Enter your Production Order Order Type : OR In Shipping Point enter Select today’s date
1 1 1 17
number Distribution Channel: DC # your <company code>*
Lab 1 Division : 00
2
Serious games to learn
© ERPsim Lab, HEC Montréal Under Bank Data, in
2
enterprise systems and
business analytics
If no planned order: Planned 2 Account, enter
3 enter the amount to pay
Create Forecast:
he
In Amount, enter the same
4 amount as the one in Under Open Item Selection, in
4 Account, enter V04
Impact
5 on Stock/Requirements (MD07)
Note the amount and press
Enter
5 Press Enter
4
GUI step
!
Stock levels, requirements,
and other documents are 3 FIORI step
displayed
*Sales
To find your companyReports
code, refer to 1/1
transaction ZORG (Organizational Structure)
. (MD61) MRP Run (MD01) Create Purchase Orders (ME59N) Post Goods Movement (MIGO) Enter Incoming Invoice (MIRO) Post Outgoing Payments (F-53)
nd enter
1 Enter Purchase Order number 1 Select today’s date in
1 Select today’s date
llowed
group F: 1
Press Enter or click
1 Under Bank Data, in
Press Enter and click on 2 Enter the PO Doc number in
2 Account, enter
2 the Close Detail Data
icon if open
Purchase Order
4
Under Open Item Selection, in
4 Enter 88 in SLoc
amount as the one in
antities
n
4 Account, enter the vendor #
TION CONFIRM PRODUCTION RECEIVE SALES ORDER SHIP ORDER POST BILL RECEIVE PAYMENT
(CO41) Enter Prod Ord Confirmation (CO15) Create Sales Order (VA01) Create Outbound Delivery (VL01N) Create Billing Documents (VF01) Post Incoming Payments (F-28)
1 1
Enter your Production Order Order Type : OR In Shipping Point enter Select today’s date
number 1 Distribution Channel: DC # your <company code>*
1
1 Division : 00
anned
Lab 2 Montréal
Serious games to learn
© ERPsim
enterprise Lab,and
systems HEC
2
2
Under Bank Data, in
Account, enter 20
ted
Press Enter
business analytics
Sold-to-party: Customer # 3
MRP Run:
Impact on Stock/Requirements (MD07)
1kg Original Muesli (###-F15) 1kg Original Muesli (###-F15)
Procurement
Purchase Purchase
Requisition Order
MIGO
Inventory Management Post Goods Movement
Accounting
Document
F-53
MIRO
Post Outgoing
Enter Incoming Invoice
Payments
Accounting
Accounting
Document Payment
Debit: Accounts Payable
Invoice Credit: Cash
Manufacturing
Procurement Process in SAP
© ERPsim Lab, HEC Montréal
Last Update: June 21, 2021
Run (MD01) Create Purchase Orders (ME59N) Post Goods Movement (MIGO) Enter Incoming Invoice (MIRO) Post Outgoing Payments (F-53)
ange warnings
! 3 Press Enter 3 Under Bank Data, in Amount,
more times on Enter
Purchase orders are created
3 Check all the boxes of the
OK column In Amount, enter the same
enter the amount to pay
4
Under Open Item Selection, in
4 Enter 88 in SLoc
amount as the one in
4 Account, enter the vendor #
M PRODUCTION RECEIVE SALES ORDER SHIP ORDER POST BILL RECEIVE PAYMENT
Purchase Purchase
Requisition Order
Manufacturing Game Integrated Business Processes - Procurement
Accounting
to purchase orders (formal contracts with
vendors).
Document
F-53
cannot be reverted.
Accounting
Accounting
Document Payment
Debit: Accounts Payable
Invoice Credit: Cash
Create
nufacturing Purchase Orders © ERPsim Lab, HEC Montréal
Last Update: June 21, 2021
MENTS ORDER MATERIALS RECEIVE MATERIALS POST INVOICE POST PAYMENT TAKE NOTE:
Create Purchase Orders (ME59N) Post Goods Movement (MIGO) Enter Incoming Invoice (MIRO) Post Outgoing Payments (F-53)
TION RECEIVE SALES ORDER SHIP ORDER POST BILL RECEIVE PAYMENT
n (CO15) Create Sales Order (VA01) Create Outbound Delivery (VL01N) Create Billing Documents (VF01) Post Incoming Payments (F-28)
1 1
rder Order Type : OR In Shipping Point enter Select today’s date
1 1
26
Distribution Channel: DC # your <company code>*
Division : 00
2
Lab 2Montréal
Serious games to learn
© ERPsim Lab, HEC
Under Bank Data, in
2
enterprise systems and
business analytics Account, enter
Purchase Orders Creation:
Impact on Stock/Requirements (MD07)
1kg Original Muesli (###-F15) 1kg Original Muesli (###-F15)
Purchase Purchase
Requisition Order
Manufacturing Game Integrated Business Processes - Procurement
ME59N
Create
Purchase Orders
F-53
MIRO
Post Outgoing
Enter Incoming Invoice
Payments
Accounting
Accounting
Document Payment
Debit: Accounts Payable
Invoice Credit: Cash
4
Under Open Item Selection, in
4 Enter 88 in SLoc
amount as the one in
4 Account, enter the vendor #
2
29
Under Bank Data, in
Lab
2 Account, enter
BEFORE AFTER
Purchase Purchase
Requisition Order
Manufacturing Game Integrated Business Processes - Procurement
ME59N
Create
Purchase Orders
MIRO
F-53
Post Outgoing
vendor is paid.
Enter Incoming Invoice
Payments
Accounting
Accounting
Document Payment
Debit: Accounts Payable
Invoice Credit: Cash
nhập hoáInitial
đơn password: ERPSIM
BEFORE AFTER
Purchase Purchase
Requisition Order
Manufacturing Game Integrated Business Processes - Procurement
ME59N
Create
Purchase Orders
F-53
MIRO
Post Outgoing
Enter Incoming Invoice
Payments
Accounting
Accounting
Document Payment
Debit: Accounts Payable
Invoice Credit: Cash
E POST PAYMENT
REFER TO
(MIRO) Post Outgoing Payments (F-53)
YOUR NOTES:
1
1 Select today’s date
In step 3, enter the invoice
Under Bank Data, in amount you wrote down
2
ber in Account, enter
earlier.
2
3 Under Bank Data, in Amount,
enter the amount to pay 3
same Under Open Item Selection, in
4 Account, enter the vendor #
press
5 Press Enter 4
k on 6
RECEIVE PAYMENT
3
Under Bank Data, in
Lab
Amount, enter the Serious games to learn
amount to pay © ERPsim
enterprise Lab,and
systems
business analytics
HEC Montréal
36
Under Open Item Selection,
Outgoing Payments:
Impact on Financial Statements (F.01)
BEFORE AFTER
ME59N
Create
time for the second supplier.
(V02-Continental Printing Co.)
Purchase Orders
REFER TO
Accounting
Document
MIRO
F-53
YOUR NOTES:
Post Outgoing
Enter Incoming Invoice
Payments
Accounting
Document Payment
down earlier. It should now be
the second of the two - the one
Debit: Accounts Payable
Invoice Credit: Cash
BEFORE AFTER
Production
Raw Material
Order
Consumption
Accounting
Document
Factory Output
Production
Accounting
Document
5
3 !
In the pop-up window, click If no open requisitions:
No suitable requisitions found
4 ! The goods movement
completed
Convert Planned Orders (CO41) Enter Prod Ord Confirmation (CO15) Create Sales Order (VA01) Create Outbound Deliver
1
Enter your Production Order Order Type : OR In Shipping Point ente
1 number 1 Distribution Channel: DC # your <company code
1 Division : 00
2 2
! If no planned order: Planned
3
2 Press Enter
order could not be selected Sold-to-party: Customer #
Ship-to-party: Customer #
2
Select all the orders or just
select the ones you want to 3 Cust. Ref. date: Today’s date
Cust. Reference: Your Name 4
convert 3 Select Material: Material Code
Order Quantity: Qty
5 Press Enter
3 4 4 Press Enter
6
5
! If conversion fails, a
will appear ! The production is confirmed
! The sales order is created ! The delivery order is c
CO41 CO15
Convert Planned Orders Confirm Production
Accounting
Document
5 In the pop-up window, click If no open requisitions: 5 Note the amount and press
Enter
5 Press Enter
No suitable requisitions found
4 ! The goods movement is
completed 6 If balance is zero, click on 6
RELEASE PRODUCTION CONFIRM PRODUCTION RECEIVE SALES ORDER SHIP ORDER POST BILL RECEIVE PAYMENT
Convert Planned Orders (CO41) Enter Prod Ord Confirmation (CO15) Create Sales Order (VA01) Create Outbound Delivery (VL01N) Create Billing Documents (VF01) Post Incoming Payments (F-28)
1 1
Enter your Production Order Order Type : OR In Shipping Point enter Select today’s date
1 number 1 Distribution Channel: DC # your <company code>*
1
1 Division : 00
6
5 5 Press Enter
! If conversion fails, a
! ! ! The invoice is created
will appear The production is confirmed
! The sales order is created The delivery order is created
6
*To find your company code, refer to transaction ZORG (Organizational Structure) Planning Procurement Production Sales 1/1
1
5 In the pop-up window, click If no open requisitions: 5 Note the amount and press
Enter
5 Press Enter
No suitable requisitions found
4 ! The goods movement is
completed 6 If balance is zero, click on 6
RELEASE PRODUCTION CONFIRM PRODUCTION RECEIVE SALES ORDER SHIP ORDER POST BILL
Create one production
RECEIVE PAYMENT
Convert Planned Orders (CO41) Enter Prod Ord Confirmation (CO15) Create Sales Order (VA01) Create Outbound Delivery (VL01N)
run for Post
Create Billing Documents (VF01)
###-F15.
Incoming Payments (F-28)
1
Enter your Production Order
1
Order Type : OR
1 In Shipping Point enter
(1kg Original
1 Muesli)
Select today’s date
1
number Distribution Channel: DC # your <company code>*
1 2 Division : 00
6
5 5TAKE NOTE:
!
Press Enter
! If conversion fails, a
! ! The sales order is created !
The invoice is created
will appear The production is confirmed The delivery order is created
6
At the end, write down the
*To find your company code, refer to transaction ZORG (Organizational Structure) Planning Procurement Production Production Order number1/1
Sales
generated by the system. You
3 will need it later.
CO41 CO15
Convert Planned Orders Confirm Production
Accounting
Document
produced and to bring them into inventory.
Factory Output
Production
Accounting
Document
TION CONFIRM PRODUCTION RECEIVE SALES ORDER SHIP ORDER POST BILL RECEIVE PAYMENT REFER TO
(CO41) Enter Prod Ord Confirmation (CO15) Create Sales Order (VA01) Create Outbound Delivery (VL01N) Create Billing Documents (VF01) Post Incoming Payments (F-28) YOUR NOTES:
1 1 Select today’s date In
step 1, use the Production
Enter your Production Order Order Type : OR In Shipping Point enter
number 1 Distribution Channel: DC # 1 your <company code>*
1
1 Division : 00 Order number you wrote down
2 2 earlier.
Under Bank Data, in
anned 2 Account, enter
ted
2
Sold-to-party: Customer # 3
Press Enter
Ship-to-party: Customer # 2 Under Bank Data, in
or just
3 Cust. Ref. date: Today’s date
Cust. Reference: Your Name 4 3 Amount, enter the
amount to pay
nt to
3 Select Material: Material Code
Under Open Item Selection,
Order Quantity: Qty
5 Press Enter 3 4 in Account, enter the
6
5 5 Press Enter
! ! ! The invoice is created
The production is confirmed
! The sales order is created The delivery order is created
6
efer to transaction ZORG (Organizational Structure) Planning Procurement Production Sales 1/1
TION CONFIRM PRODUCTION RECEIVE SALES ORDER SHIP ORDER POST BILL RECEIVE PAYMENT
Complete the production
(CO41) Enter Prod Ord Confirmation (CO15) Create Sales Order (VA01) Create Outbound Delivery (VL01N) Create Billing Documents (VF01)
run for ###-F15.
Post Incoming Payments (F-28)
Enter your Production Order
1
Order Type : OR
1 In Shipping Point enter
1 Select today’s date
(1kg Original Muesli)
1
number Distribution Channel: DC # your <company code>*
1 Division : 00
ted
2
Sold-to-party: Customer # 3
Press Enter
Ship-to-party: Customer # 2 Under Bank Data, in
or just
3 Cust. Ref. date: Today’s date
Cust. Reference: Your Name 4 3 Amount, enter the
amount to pay
nt to
3 Select Material: Material Code
Under Open Item Selection,
Order Quantity: Qty
5 Press Enter 3 4 in Account, enter the
6
5 5 Press Enter
! ! ! The invoice is created
The production is confirmed
! The sales order is created The delivery order is created
6
refer to transaction ZORG (Organizational Structure) Planning Procurement Production Sales 1/1
BEFORE AFTER
Sales
Accounting
Document
VL01N
Sales Picking
Create
Order Goods Issue
Outbound Delivery
VF01
Create Debit: Accounts Receivable
Billing Documents Credit: Revenues
Accounting
Document
Accounting
F-28
Post Incoming
Payments
Invoice
Debit: Cash
Credit: Accounts Receivable
Accounting
Document
M PRODUCTION RECEIVE SALES ORDER SHIP ORDER POST BILL RECEIVE PAYMENT
d Confirmation (CO15) Create Sales Order (VA01) Create Outbound Delivery (VL01N) Create Billing Documents (VF01) Post Incoming Payments (F-28)
1 1
ur Production Order Order Type : OR In Shipping Point enter Select today’s date
1 Distribution Channel: DC #
Division : 00
your <company code>*
1
2 2 Under Bank Data, in
2 Account, enter
Sold-to-party: Customer # 3
er
Ship-to-party: Customer # 2 Under Bank Data, in
3 Cust. Ref. date: Today’s date
Cust. Reference: Your Name 4 3 Amount, enter the
amount to pay
Material: Material Code
Under Open Item Selection,
Order Quantity: Qty
5 Press Enter 3 4 in Account, enter the
4 Press Enter customer number
6
5 5 Press Enter
! ! The invoice is created
uction is confirmed
! The sales order is created The delivery order is created
6
* To find your company code, refer to transaction ZORG (Org. Structure)
anizational Structure) Planning Procurement Production Sales 1/1
Lab Serious games to learn
© ERPsim
enterprise Lab,and
systems
business analytics
HEC Montréal
54
Create Sales Order
Sales
Accounting
Document
VL01N
Sales Picking
Accounting
transaction VA01.
F-28
Post Incoming
Payments
Invoice
Debit: Cash
Credit: Accounts Receivable
Accounting
Document
!
click If no open requisitions: Enter Press Enter
No suitable requisitions found
! The goods movement is
completed 6 If balance is zero, click on 6
TION RECEIVE SALES ORDER SHIP ORDER POST BILL RECEIVE PAYMENT
n (CO15) Create Sales Order (VA01) Create Outbound Delivery (VL01N) Create Billing Documents (VF01) Post Incoming Payments (F-28)
One of the hypermarket
customers (80105 in DC 10)
1 1
rder Order Type : OR
calls to place an order.
In Shipping Point enter Select today’s date
1 Distribution Channel: DC #
Division : 00
your <company code>*
1 1
6
5 5 Press Enter
! ! The invoice is created
med
! The sales order is created The delivery order is created
6
ucture) Planning Procurement Production Sales 1/1
!
click If no open requisitions: Enter Press Enter
No suitable requisitions found
! The goods movement is
completed 6 If balance is zero, click on 6
TION RECEIVE SALES ORDER SHIP ORDER POST BILL RECEIVE PAYMENT TAKE NOTE:
n (CO15) Create Sales Order (VA01) Create Outbound Delivery (VL01N) Create Billing Documents (VF01) Post Incoming Payments (F-28)
1 1
rder Order Type : OR In Shipping Point enter Select today’s date
1 Distribution Channel: DC # your <company code>*
1 Write down the Sales
Division : 00
3 Order number generated
2 2 Under Bank Data, in
by the system. You will
2 Account, enter
need it later.
Sold-to-party: Customer # 3
Ship-to-party: Customer # 2 Under Bank Data, in
3 Cust. Ref. date: Today’s date
Cust. Reference: Your Name 4 3 Amount, enter the
amount to pay
Material: Material Code
Under Open Item Selection,
Order Quantity: Qty
5 Press Enter 3 4 in Account, enter the
4 Press Enter customer number
6
5 5 3
!
Press Enter
The invoice is created
rmed
! The sales order is created ! The delivery order is created
6
ucture) Planning Procurement Production Sales 1/1
Sales
Accounting
Document
VL01N
Sales Picking
Create
Order Goods Issue
Outbound Delivery
F-28
Post Incoming
Payments
Invoice
Debit: Cash
Credit: Accounts Receivable
Accounting
Document
5 5 5
Note the amount and press
Enter Press Enter
found
! The goods movement is
completed 6 If balance is zero, click on 6
6
! The invoice is created 5 Press Enter
d ! The delivery order is created
6
Planning * To find your company code, refer
Procurement to
Production Sales 1/1
transaction ZORG (Organizational Structure)
3
5 5 5
Note the amount and press
Enter Press Enter
found
! The goods movement is
completed 6 If balance is zero, click on 6
6
! The invoice is created 5 Press Enter
d ! The delivery order is created
6
You may need to scroll
to the right to find the
SLoc entry point.
Planning Procurement Production Sales 1/1
* To find your company code, refer to
transaction ZORG (Organizational Structure)
BEFORE AFTER
Sales
Accounting
Document
VL01N
Sales Picking
Create
Order Goods Issue
Outbound Delivery
F-28
Post Incoming
Payments
Invoice
Debit: Cash
Credit: Accounts Receivable
Accounting
Document
>*
1 1 Select today’s date
Write down the net value
of the invoice.You will need
it later.
Under Bank Data, in
2 Account, enter
BEFORE AFTER
Sales
Accounting
Document
VL01N
Sales Picking
Create
Order Goods Issue
F-28
Post Incoming
full business cycle.
Payments
Invoice
Debit: Cash
Credit: Accounts Receivable
Accounting
Document
press
5 Press Enter
on 6
5 Press Enter
6
Sales 1/1
BEFORE AFTER
x VA01
MD01
MRP Run
ME59N
Create
Purchase Orders
MIGO
Post Goods Movement
CO41
Convert Planned Orders the business transactions, playing the roles
of vendors, customers and different staff
members (warehouse, production and
x MIRO
Enter Incoming Invoice
CO15
Confirm Production
accounting).
x F-53
Post Outgoing
Payments
xVL01N
Create
Outbound Delivery
F-28
Post Incoming
Payments