Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MS RAILLING 1000 HIGH

2
3

EL 1949.58 EL 1949.58
TOP EL 1949.58 POWER PIPE 900MM
Spill water level=1948.80m
M:20
Spill water level=1948.80m
Maximum water level=1948.58m
FLOW TO FOREBAY
1947.53
Flow

1800
FLOW
FLOW
Slope 1in 300 FLOW
Hopper level=1946.78m
M:25
BED level=1945.63m

750
M:20 BED level=1945.29m
SCOUR PIPE
flushing pipe 600 Dia
INLET TRANSITION 2 BAFFLE WALL
Silt Flushing channel (0 at strat and 750at end) 3
OUTLET TRANSITION
4000 28000 2000
M/S Affinity Engineering & works kullu H.P

REV 02
DATE 11/11/22 DESIGN BY-ER RAJESH KUMAR
CHECKED BY-ER RAJESH THAKUR

M/S Gunal Hydro Power Pvt Ltd

M/S Affinity Engineering & works kullu H.P


SHEEL SMALL HYDRO POWER PROJECT 2.00MW

DESILTING TANK L SECTION

SHEP/SHEEL/DESEND DRAWN BY-ER NITIN SHARMA


PLAN-1-3

You might also like