Professional Documents
Culture Documents
Sheel Change
Sheel Change
2
3
EL 1949.58 EL 1949.58
TOP EL 1949.58 POWER PIPE 900MM
Spill water level=1948.80m
M:20
Spill water level=1948.80m
Maximum water level=1948.58m
FLOW TO FOREBAY
1947.53
Flow
1800
FLOW
FLOW
Slope 1in 300 FLOW
Hopper level=1946.78m
M:25
BED level=1945.63m
750
M:20 BED level=1945.29m
SCOUR PIPE
flushing pipe 600 Dia
INLET TRANSITION 2 BAFFLE WALL
Silt Flushing channel (0 at strat and 750at end) 3
OUTLET TRANSITION
4000 28000 2000
M/S Affinity Engineering & works kullu H.P
REV 02
DATE 11/11/22 DESIGN BY-ER RAJESH KUMAR
CHECKED BY-ER RAJESH THAKUR