Description Unit Original BOQ VO Quantity Total Quantity

QTY
Structural Works
Formworks
Mat Footing sqm. 87.06 0 87.06
Shearwall
Mat Foundation for GF Shear Walls sqm. 26.62 0 26.62
GF Shear Walls sqm. 71.62 0 71.62
2F Shear Walls sqm. 58.14 0 58.14
3F Shear Walls sqm. 56.52 0 56.52
4F Shear Walls sqm. 56.52 0 56.52
5F Shear Walls sqm. 53.43 0 53.43
6F Shear Walls sqm. 53.43 0 53.43
7F Shear Walls sqm. 59.67 0 59.67
Columns
Mat Foundation to GF Columns sqm. 94.17 10.87 105.04
GF Columns sqm. 262.24 0 262.24
2F Columns sqm. 214.56 11.16 225.72
3F Columns sqm. 200.88 16.25 217.13
4F Columns sqm. 212.4 0 212.4
5F Columns sqm. 123.12 0 123.12
6F Columns sqm. 116.28 0 116.28
7F Columns sqm. 112 4.28 116.28
Suspended Beams
Footing Tie Beams sqm. 269.56 215.39 484.95
2F Beams sqm. 432.19 2.14 434.33
3F Beams sqm. 434.46 39.9 474.36
4F Beams sqm. 434.85 65.25 500.1
5F Beams sqm. 447.54 47.12 494.66
6F Beams sqm. 317.57 50.72 368.29
7F Beams sqm. 203.81 97.81 301.62
Roof Beams sqm. 53.68 111.02 164.7
Slab on Grade sqm. 45.15 0 45.15
(Suspended Slabs (Shoring Only)
(Supply and Installation of Metal
Deck is by Others)
2F Slab sqm. 473.47 0 473.47
3F Slab sqm. 473.47 0 473.47
4F Slab sqm. 473.47 0 473.47
5F Slab sqm. 505.27 0 505.27
6F Slab sqm. 351.88 0 351.88
7F Slab sqm. 159.9 0 159.9
Roof Slab sqm. 41.67 49.01 90.68
Ledge sqm. 157.8 0 157.8
Ramp
GF Ramp sqm. 10.85 0 10.85
Stairs
Stair 1 sqm. 65.05 0 65.05
Tanks
Fire Storage Tank sqm. 269.42 0 269.42
Rain Water Tank sqm. 54.41 0 54.41
Sump Pit sqm. exluded
Elevator Pit Wall sqm. Included
Grease Trap Tank / Oil Interceptor Tank sqm.Excluded, no detail
Trench drain / Catch Basins sqm. Excluded
D. Rebar Works
Mat Footing kgs 38026.4 0 38026.4
Shear Wall kgs 12792.37 2821.5 15613.87
Columns kgs 77799.66 15904.66 93704.32
Suspended Beams
Footing Tie Beams kgs 21976.31 0 21976.31
2F Beams kgs 11658.42 5595.4 17253.82
3F Beams kgs 11658.42 5497.3 17155.72
4F Beams kgs 11658.42 5821.88 17480.3
5F Beams kgs 12415.62 4936.33 17351.95
6F Beams kgs 9301.76 5039.03 14340.79
7F Beams kgs 9287.95 378.48 9666.43
Roof deck Beams kgs 1165.59 3416.13 4581.72
Slab on Grade kgs 4001.83 0 4001.83
Suspended slabs
2F Slab kgs 5592.8 344.27 5937.07
3F Slab kgs 5592.8 375.66 5968.46
4F Slab kgs 5592.8 371.81 5964.61
5F Slab kgs 5062.93 778.9 5841.83
6F Slab kgs 2443.71 1935.11 4378.82
7F Slab kgs 1261.14 1182.57 2443.71
Roof Deck Slab kgs 258.35 0 258.35
Ramp
GF Ramp kgs
Stairs kgs 0 0
Fire Exit Stair 1 kgs 4280.78 0 4280.78
Tanks kgs 0 0
Fire Storage Tank kgs 6629.01 0 6629.01
Rain Water Tank kgs 745.08 0 745.08
Sump Pit kgs
Elevator Pit Wall kgs
Grease Trap Tank / Oil Interceptor Tank kgs
Trench drain / Catch Basins kgs
E. Concerete Works
Mat Footing cu.m 361.24 0 361.24
Shear Wall
Mat Shear Wall cu.m 4.66 2.07 6.73
GF Shear Wall cu.m 12.28 0.62 12.9
2F Shear Wall cu.m 9.92 0.51 10.43
3F Shear Wall cu.m 8.29 2.14 10.43
4F Shear Wall cu.m 8.29 2.14 10.43
5F Shear Wall cu.m 5.26 5.17 10.43
6F Shear Wall cu.m 5.26 5.17 10.43
7F Shear Wall cu.m 5.88 5.79 11.67
Columns
Pile Cap to GF Columns cu.m 12.11 1.52 13.63
GF Columns cu.m 33.73 0.65 34.38
2F Columns cu.m 27.59 3.72 31.31
3F Columns cu.m 24.7 0.3 25
4F Columns cu.m 25.78 0 25.78
5F Columns cu.m 14.58 0 14.58
6F Columns cu.m 13.77 0 13.77
7F Columns cu.m 12.24 1.53 13.77
Suspended Beams
Footing Tie Beams cu.m 35.94 0 35.94
2F Beams cu.m 47.61 17.64 65.25
3F Beams cu.m 47.88 17.13 65.01
4F Beams cu.m 47.92 19.72 67.64
5F Beams cu.m 47.12 19.93 67.05
6F Beams cu.m 31.51 23.67 55.18
7F Beams cu.m 22.95 22.97 45.92
Roof Beams cu.m 5.33 0 5.33
Slab on Grade cu.m 104.62 0 104.62
Suspended Slabs
2F Slab cu.m 53.35 0.66 54.01
3F Slab cu.m 53.35 1.13 54.48
4F Slab cu.m 53.35 14.38 67.73
5F Slab cu.m 50.53 14.8 65.33
6F Slab cu.m 35.19 11.22 46.41
7F Slab cu.m 15.99 15.89 31.88
Roof Slab cu.m 4.17 18.71 22.88
Ramp
GF Ramp cu.m 0.82 0 0.82
Stairs
Stair 1 cu.m 23.69 0 23.69
Tanks 0 0
Fire Storage Tank cu.m 35.39 0 35.39
Rain Water Tank cu.m 6.07 0 6.07
Sump Pit cu.m
Elevator Pit Wall cu.m
Grease Trap Tank / Oil Interceptor Tank cu.m

Concreting cu.m 0 0 0
Wall Footing cu.m 11.95 0 11.95
Formworks cu.m 0 0 0
Wall Footing cu.m 107.58 0 107.58
Rebar Works cu.m 0 0 0
Wall Footing cu.m 450.53 0 450.53
Wiremesh 6mm Diameter, 150mm x 150mm cu.m 2636.93 0 2636.93
Remaining Quantity / Total Activity Completion / Possible VO Activity Completion /
Base on original BOQ Total Previous Billed Billing 8 and Below

82.92 4.14 - 4.14

0 26.62 - 26.62
0 71.62 - 71.62
0 58.14 - 58.14
0 56.52 - 56.52
0 56.52 - 56.52
0 53.43 - 0
0 53.43 - 0
0 59.67 - 0

10.87 94.17 - 94.17


0 262.24 - 262.24
11.16 214.56 - 214.56
16.25 200.88 - 200.88
0 212.4 - 212.4
0 123.12 - 0
0 116.28 - 0
4.28 112 - 0

215.39 269.56 - 269.56


0 432.19 - 432.19
0.00999999999999091 434.45 - 426.43
0 434.85 - 434.85
0 447.54 - 447.54
0 317.57 - 0
0 203.81 - 0
0 53.68 - 0
45.15 0 - 0

36 437.47 - 437.47
0 473.47 - 434.84
0 473.47 - 473.47
0 505.27 - 454.01
0 351.88 - 0
0 159.9 - 0
0 41.67 - 0
0 157.8 - 0

10.85 0 - 0

0 65.05 - 0

269.42 0 -
54.41 0 -
0
0
0
0

18337.35 19689.05 - 19689.05


0 12792.37 - 12792.37
17511.12 60288.54 - 60288.54

0 21976.31 - 21976.31
0 11658.42 - 11658.42
0 11658.42 - 11658.42
0 11658.42 - 11658.42
0 12415.62 - 12415.62
0 9301.76 - 0
0 9287.95 - 0
1165.59 0 - 0
4001.83 0 - 0
0
0 5592.8 - 5592.8
0 5592.8 - 5592.8
0 5592.8 - 5592.8
0 5062.93 - 5062.93
0 2443.71 - 0
0 1261.14 - 0
258.35 0 - 0

0 0 -
3287.4 993.38 - 0
0 0 -
6629.01 0 - 0
745.08 0 - 0
-
-
-
-

172.24 189 - 189

-7 11.66 4.93 11.66


0 12.28 - 12.28
0 9.92 - 9.92
0 8.29 - 8.29
0 8.29 - 8.29
-5.26 10.52 0.09 5.26
-5.26 10.52 0.09 5.26
0 5.88 - 0

0 12.11 - 12.11
0 33.73 - 33.73
0 27.59 - 27.59
0 24.7 - 24.7
0 25.78 - 25.78
0 14.58 - 0
0 13.77 - 0
0 12.24 - 0

0 35.94 - 35.94
0 47.61 - 47.61
0 47.88 - 47.88
0 47.92 - 47.92
0 47.12 - 47.12
19.27 12.24 - 0
10.71 12.24 - 0
0 5.33 - 0
0 0 - 0

0 53.35 - 53.35
0 53.35 - 53.35
0 53.35 - 53.35
0 50.53 - 50.53
3.68 31.51 - 0
-6.96 22.95 - 0
4.17 0 - 0

0.82 0 - 0

3 20.69 - 0
0 0 - 0
35.39 0 - 0
6.07 0 -

-11.95 11.95 11.95


11.95 0 - 0
0 0 -
107.58 0 -
0 0 -
450.53 0 -
1772.93 864 - 864
Activity Completion / Activity Completion / Activity Completion / Activity Completion /
Biling 9 Biling 10 Biling 11 Biling 12

53.43
53.43
0 59.67

116.24 6.88
116.28
0 112

0
0
8.02
0
0
317.57
203.81
0 53.68
0

0
38.63
0
51.26
351.88
159.9
0 41.67
46 111.8

0 65.05
9301.76
9287.95
0
0

0
0
0
0
2443.71
1261.14
0

993.38

0
0

0
0
0
0
0
5.26
5.26
0 5.88

0
0
0
0
0
12.24 2.34
12.24 1.53
0 12.24

0
0
0
0
0
12.24
12.24
0 5.33
0

31.51
22.95
0

4 16.69
0
0

11.95
0

0
Activity Completion / Activity Completion / Activity Completion / Activity Completion /
Biling 13 Biling 14 Biling 15 Biling 16
Activity Completion / Activity Completion / Activity Completion / Activity Completion /
Biling 17 Biling 18 Biling 19 Biling 20
Description Unit Original BOQ VO Quantity Total quantity
QTY
Architectural Works
A. Masonry Formworks
150mm Thick Exterior Wall Partitions Using
CFMI Formblocks
GF sqm. 524.35 524.35
2F sqm. 214.46 214.46
3F sqm. 214.46 214.46
4F sqm. 304.74 304.74
5F sqm. 167.34 167.34
6F sqm. 133.06 133.06
7F sqm. 99.83 99.83

100mm Thick Interior Wall Partitions Using


CFMI Form Tiles
GF sqm. 229.08 229.08
2F sqm. 79.97 79.97
3F sqm. 79.97 79.97
4F sqm. 83.09 83.09
5F sqm. 39.69 39.69
6F sqm. 12.62 12.62
7F sqm. 16.54 16.54

100mm Thick drywall-12mm thk Gypsum


Board on Meal Furing without insulation
GF sqm. 183.09 183.09
2F sqm. 318.15 318.15
3F sqm. 318.15 318.15
4F sqm. 33.04 33.04
5F sqm. 19.08 19.08

Pipechase Cladding using mm Ficerm


Board on Metal Studs

Zocallo - 150mmH x 100mmW


GF sqm. 89.76 89.76
2F sqm. 32.3 32.3
3F sqm. 32.3 32.3
4F sqm. 32.3 32.3
5F sqm. 40.3 40.3
6F sqm. 40.3 40.3
7F sqm. 9.8 9.8

Interior Plastering (Using Konstruct Permaplast


K201High-Performance Acrylic Skimcoat
GF
Service Stairs to GF sqm. 3.12 3.12
Main Lobby sqm. 120.56 120.56
Common Area sqm. 170.97 170.97
Locker Room sqm. 32.25 32.25
CCTV Room sqm. 20.21 20.21
Male Toilet sqm. 74.82 74.82
Female Toilet sqm. 91.29 91.29
Rentable Units 101,102,103,104,105,106 sqm. 586.04 586.04
Stairs to 2F sqm. 2.68 2.68
Pump Room sqm. 38.05 38.05
0
2F
Hallway sqm. 188.27 188.27
Utility Area sqm. 44.99 44.99
MaleToilet sqm. 53.36 53.36
Female Toilet sqm. 56.54 56.54
Rentable Units 201,202,203,204,205,206 sqm. 196.08 196.08
Stairs to 3F sqm. 2.02 2.02

3F
Hallway sqm. 188.27 188.27
Utility Area sqm. 44.99 44.99
MaleToilet sqm. 53.36 53.36
Female Toilet sqm. 56.54 56.54
Rentable Units 201,202,203,204,205,206 sqm. 196.08 196.08
Stairs to 3F sqm. 2.02 2.02

4F
Common Area sqm. 77.22 77.22
Elevator Lobby sqm. 44.99 44.99
MaleToilet sqm. 53.36 53.36
Female Toilet sqm. 56.54 56.54
Stairs to 5F sqm. 2.02 2.02

5F
Common Area sqm. 43.59 43.59
Elevator Lobby sqm. 28.53 28.53
Utility Area sqm. 44.49 44.49
Male Toilet sqm. 46.02 46.02
Female Toilet sqm. 47.47 47.47
Rentable Units 201,202,203,204,205,206 sqm. 23.03 23.03
Stairs to 6F sqm. 34.62 34.62

6F
Elevator Lobby sqm. 48.13 48.13
Utility Area sqm. 46.93 46.93
Male Toilet sqm. 46.02 46.02
Female Toilet sqm. 47.17 47.17

7F
Elevator Lobby sqm. 26.08 26.08
Utility Area sqm. 59.52 59.52
Powder Room sqm. 31.47 31.47
Elevator Shaft sqm. 168.64 168.64

Exterior Plastering (Using Konstrukt Permaplast


K201High-Performance Acrylic Skimcoat)
GF sqm. 672.52 672.52
2F sqm. 265.97 265.97
3F sqm. 265.97 265.97
4F sqm. 363.31 363.31
5F sqm. 199.06 199.06
6F sqm. 106.3 106.3
7F sqm. 105.3 105.3

50mm Thick floor Topping without wiremesh


ready to receive finish
GF
Stairs to Office Lobby sqm. 11.84 11.84
Exterior Corridor sqm. 277.4 277.4
Main lobby sqm. 128.13 128.13
Office Lobby sqm. 11.84 11.84
Service Vestibule sqm. 3.55 3.55
Locker Room sqm. 10.08 10.08
CCTV Room sqm. 7.2 7.2
Male Toilet sqm. 16.8 16.8
Female Toilet sqm. 24.59 24.59
Rentable Unit 101,102,103,104,105,106 sqm. 338.97 338.97

2F
Utility Area sqm. 6.55 6.55
Rentable Unit 201,202,203,204,205,206, sqm. 374.05 374.05

3F
Utility Area sqm. 6.55 6.55
Rentable Unit 301,302,303,304,305,306, sqm. 374.05 374.05

4F
Utility Area sqm. 6.55 6.55

5F
Elevator Lobby sqm. 8.96 8.96
Utility Area sqm. 6.55 6.55
Supplies Room sqm. 5.41 5.41
Server Room sqm. 7.34 7.34

6F
Elevator Lobby sqm. 21.53 21.53
Utility Area sqm. 6.55 6.55

7F
Elevator Lobby sqm. 12.2 12.2
Utility Area sqm. 6.55 6.55

50mm Thick Floor Topping with wiremeshto areas


with waterproofing
2F
Male Toilet sqm. 15.38 15.38
Female Toilet sqm. 17.78 17.78

3F
Male Toilet sqm. 15.38 15.38
Female Toilet sqm. 17.78 17.78

4F
Male Toilet sqm. 15.38 15.38
Female Toilet sqm. 17.78 17.78

5F
Male Toilet sqm. 11.71 11.71
Female Toilet sqm. 13.19 13.19
Roof Deck sqm. 180.8 180.8
Powder Room sqm. 3.12 3.12

6F
Male Toilet sqm. 11.71 11.71
Female Toilet sqm. 13.19 13.19
Powder Room sqm. 3.12 3.12

7F
Powder Room sqm. 5.66 5.66
Utility Deck sqm. 86.96 86.96

B. Floor Finishes
Sealed Concrete, Assumed Industrial Type
Finish to common Areas
GF
Service Stairs to GF sqm. 7.77 7.77
Ramp toGF sqm. 32.33 32.33
Common Area sqm. 137.73 137.73
Stairs to 2F sqm. 14.28 14.28
Pump Room sqm. 0

2F
Hallway sqm. 123.23 123.23
Stairs to 3rd Floor sqm. 11.88 11.88

3F
Hallway sqm. 123.23 123.23
Stairs to 3rd Floor sqm. 11.88 11.88

4F
Common Area sqm. 31.35 31.35
Stairs to Fifth sqm. 11.88 11.88

5F
Common Area sqm. 16.02 16.02
Stairs to Sixth sqm. 11.88 11.88

600mmX600mm homogeneous tiles to Toilet Areas


Except Rentable units
GF
Service Vestibule sqm. 3.55 3.55
Locker Room sqm. 10.08 10.08
CCTV Room sqm. 7.2 7.2
Male Toilet sqm. 16.8 16.8
Female Toilet sqm. 24.59 24.59

2F
Utility Area sqm. 6.55 6.55
Male Toilet sqm. 15.38 15.38
Female Toilet sqm. 17.78 17.78

3F
Utility Area sqm. 6.55 6.55
Male Toilet sqm. 15.38 15.38
Female Toilet sqm. 17.78 17.78

4F
Utility Area sqm. 6.55 6.55
Male Toilet sqm. 15.38 15.38
Female Toilet sqm. 17.78 17.78

5F
Utility Area sqm. 6.55 6.55

6F
Utility Area sqm. 6.55 6.55

7F
Utility Area sqm. 10.17 10.17

C. Ceiling Works
Smooth Formed Concrete-Rubbed Finish
GF
Rentable Units 101,102,103,104,105,106 sqm. 166.65 166.65
CCTV sqm. 3.55 3.55
Locker Room sqm. 3.91 3.91
Service Vestibule sqm. 1.27 1.27
Common Area sqm. 66.86 66.86
Pump Room sqm. 15.78 15.78
Main Lobby sqm. 128.13 128.13
Exterior Corridor sqm. 203.49 203.49
Office Lobby sqm. 15.78 15.78
Stairs sqm. 10.8 10.8
0
2F 0
Rentable Units 201,202,203,204,205,206 sqm. 211.77 211.77
Utility Area sqm. 1.81 1.81
Stairs sqm. 10.8 10.8
0
3F 0
Rentable Units 201,202,203,204,205,206 sqm. 211.77 211.77
Utility Area sqm. 1.81 1.81
Stairs sqm. 10.8 10.8
0
4F 0
Utility Area sqm. 1.81 1.81
Stairs sqm. 9 9
0
5F 0
Utility Area sqm. 1.81 1.81
Stairs sqm. 9 9
0
6F 0
Utility Area sqm. 1.81 1.81
Stairs sqm. 9 9
0
7F 0
Utility Area sqm. 4.46 4.46
0
Ordinary Gypsum Ceiling Board 12.7mm thk 0
4F 0
Common Area sqm. 31.35 31.35
0
5F 0
Common Area sqm. 16.02 16.02
0
MR Gypsum Board, For Wet Surfaces 12. sqm. 0
GF 0
Male Toilet sqm. 16.8 16.8
Female Toilet sqm. 24.59 24.59
0
2F 0
Hallway sqm. 123.23 123.23
Male Toilet sqm. 1538 1538
Female Toilet sqm. 17.78 17.78
0
3F 0
Hallway sqm. 123.23 123.23
Male Toilet sqm. 15.38 15.38
Female Toilet sqm. 17.78 17.78
0
4F 0
Male Toilet sqm. 15.38 15.38
Female Toilet sqm. 17.78 17.78
0
VARIATION ORDER #8 0
A. Ceiling Shadow Line (50mmx50mm) 0
Secong floor Hallway lm 0 122.57 122.57
Third Floor Hallway lm 0 122.57 122.57
Fourth Floor Hallway at common area lm 0 105.17 105.17
0
A. Ceiling Cove Light (50mmx50mm) 0
Ground floor Hallway lm 0 7.18 7.18
Second Floor Hallway lm 0 40.12 40.12
Third Floor Hallway lm 0 40.12 40.12
Fourth Floor Hallway at common area lm 0 17.28 17.28
Fifth Floor Hallway at common area lm 0 18.05 18.05
Sixth Floor Hallway at common area lm 0 18.05 18.05
Seventh Floor Hallway at common area lm 0 4.83 4.83
0
D. Waterproofing Works 0
Integral Waterproofing 0
Fire Tank sqm. 35.9 35.9
Rainwater Tank sqm. 6.08 6.08
Roofdeck Slab and Beams sqm. 105.78 105.78
0
Waterproofing to T&B sqm. 214.08 214.08
Waterproofing to Roof Slabs sqm. 434.17 434.17
Waterproofing to Ledge sqm. 190.5 190.5
Waterproofing to Tanks sqm. 255.1 255.1
Waterproofing to Elevator Pit sqm. 11.06 11.06
0
E. Painting Works 0
Painting to exposed Beams 0
GF 0
CCTV sqm. 3.55 3.55
Locker Room sqm. 3.91 3.91
Service Vestibule sqm. 1.27 1.27
Common Area sqm. 66.86 66.86
Pump Room sqm. 15.78 15.78
Main Lobby sqm. 128.13 128.13
Exterior Corridor sqm. 203.49 203.49
Office Lobby sqm. 15.78 15.78
Stairs sqm. 10.8 10.8
0
2F 0
Utility Area sqm. 1.81 1.81
Stair sqm. 10.8 10.8
0
3F 0
Utility Area sqm. 1.81 1.81
Stair sqm. 10.8 10.8
0
4F sqm. 0
Utility Area sqm. 1.81 1.81
Stair sqm. 10.8 10.8
0
5F 0
Utility Area sqm. 1.81 1.81
Stair sqm. 9 9
0
6F 0
Utility Area sqm. 1.81 1.81
Stair sqm. 9 9
0
7F 0
Utility Area sqm. 4.46 4.46
0
Painting to Exposed Steel Deck Exclu- 0
ding Rentable Units - Enamel Paint 0
GF 0
CCTV sqm. 6.73 6.73
Locker Room sqm. 9.72 9.72
Service Vestibule sqm. 3.55 3.55
Common Area sqm. 129.98 129.98
0
2F 0
Utility Area sqm. 6.25 6.25
0
3F 0
Utility Area sqm. 6.25 6.25
0
4F 0
Utility Area sqm. 6.25 6.25
0
5F 0
Utility Area sqm. 6.25 6.25
0
6F 0
Utility Area sqm. 6.25 6.25
0
7F 0
Utility Area sqm. 9.25 9.25
0
Painting to Gypsum Ceiling, Semi-gloss 0
Latex Paint 0
GF sqm. 41.39 41.39
2F sqm. 156.39 156.39
3F sqm. 156.39 156.39
4F sqm. 64.51 64.51
5F sqm. 16.02 16.02
0
Interior Wall Paint (semi-gloss) 0
GF 0
Service Stairs to GF sqm. 3.12 3.12
Main Lobby sqm. 120.56 120.56
Office Lobby sqm. 15.07 15.07
Common Area sqm. 217.11 217.11
Locker Room sqm. 64.5 64.5
CCTV Room sqm. 47.73 47.73
Male Toilet sqm. 69.23 69.23
Female Toilet sqm. 88.28 88.28
Stairs to 2F sqm. 2.68 2.68
Pum Room sqm. 38.05 38.05
0
2F 0
Hallway sqm. 311.77 311.77
Utility Area sqm. 120.56 120.56
Male Toilet sqm. 15.07 15.07
Female Toilet sqm. 217.11 217.11
Stair to 3F sqm. 64.5 64.5
0
3F 0
Hallway sqm. 311.77 311.77
Utility Area sqm. 44.99 44.99
Male Toilet sqm. 53.36 53.36
Female Toilet sqm. 56.54 56.54
Stair to 4F sqm. 2.02 2.02
0
4F 0
Common Area sqm. 110.26 110.26
Utility Area sqm. 44.99 44.99
Male Toilet sqm. 53.36 53.36
Female Toilet sqm. 56.54 56.54
Stair to 5F sqm. 2.02 2.02
0
5F 0
Common Area sqm. 68.62 68.62
Utility Area sqm. 44.99 44.99
Stair to 5F sqm. 2.02 2.02
0
6F 0
Utility Area sqm. 46.93 46.93
0
7F 0
Utility Area sqm. 59.52 59.52
0
Exterior Wall Paint (Semi-gloss) 0
GF sqm. 672.52 672.52
2F sqm. 265.97 265.97
3F sqm. 265.97 265.97
4F sqm. 363.31 363.31
5F sqm. 199.06 199.06
6F sqm. 106.3 106.3
7F sqm. 105.3 105.3
0
F. Door, Jambs and Accessories 0
DO1 Double Glass Swing Door 0
Powder Coated Aluminum Frame set/s 0
3.65x1.9 6 6
DO2 Wood Panel Door 0
Paint Finish set/s 0
2.15x1 13 13
DO3 Panel Door 0
Paint Finish set/s 0
2.15x1 10 10
DO4 Steel Door 0
Paint Finish set/s 0
2.15x1 2 2
DO5 Roll-up Door 0
Aluminum Finish set/s 0
2.7x1.9 1 1
DO6 Wood Panel Door 0
Aluminum Finish set/s 0
2.15x.8 7 7
DO7 Panel Door with viewing Panel 0
Paint Finish set/s 0
set/s
2.15x1 22 22
DO8 Steel Door 0
Paint Finish set/s 0
2.15x.9 3 3
DO9 Double swing wood door with viewing 0
Paint Finish set/s 0
2.15x2 1 1
W01 Awning and Fixed Windows 0
Powder Coated Aluminum Frame set/s 0
3.65x1.84 6 6
W02 Awning and Fixed Windows 0
Powder Coated Aluminum Frame set/s 0
3.65x1.615 4 4
W03 Awning Windows 0
Powder Coated Aluminum Frame set/s 0
.7x.4 25 25
W04 Awning and Fixed Windows 0
Powder Coated Aluminum Frame set/s 0
3x5.13 31 31
W05 Awning and Fixed Windows 0
set/s
3x2.27 3 3
W06 Awning and Fixed Windows 0
Powder Coated Aluminum Frame set/s 0
3x5.75 1 1
W07 Awning and Fixed Windows 0
Powder Coated Aluminum Frame set/s 0
3x10.5 1 1
Remaining Quantity / Total Activity Completion / Possible VO Activity Completion /
Base on original BOQ Total Previous Billed Billing 8 and Below

524.35 0 - 0
24.06 190.4 - 57.89
24.06 190.4 - 57.89
106.26 198.48 - 65.97
126.18 41.16 - 41.16
133.06 0 - 0
99.83 0 - 0

229.08 0 - 0
0 79.97 - 79.97
0 79.97 - 79.97
0 83.09 - 0
39.69 0 - 0
12.62 0 - 0
16.54 0 - 0

183.09 0 - 0
164.82 153.33 - 137.05
163.62 154.53 - 48.51
33.04 0 - 0
19.08 0 - 0

-
-

89.76 0 - 0
0 32.3 - 28.85
0 32.3 - 28.85
0 32.3 - 28.85
0 40.3 - 40.3
40.3 0 - 0
9.8 0 - 0

3.12 0 - 0
120.56 0 - 0
170.97 0 - 0
32.25 0 - 0
20.21 0 - 0
74.82 0 - 0
91.29 0 - 0
586.04 0 - 0
2.68 0 - 0
38.05 0 - 0
0 0 -

0 188.27 - 188.27
0 44.99 - 0
0 53.36 - 0
0 56.54 - 0
27.24 168.84 - 114.59
2.02 0 - 0

50.74 137.53 - 137.53


44.99 0 - 0
53.36 0 - 0
56.54 0 - 0
26.93 169.15 - 114.9
2.02 0 - 0

0 77.22 - 77.22
24.38 20.61 - 20.61
53.36 0 - 0
56.54 0 - 0
2.02 0 - 0

-1.2 44.79 1.2 44.79


28.53 0 - 0
44.49 0 - 0
46.02 0 - 0
47.47 0 - 0
23.03 0 - 0
34.62 0 - 0

48.13 0 - 0
46.93 0 - 0
46.02 0 - 0
47.17 0 - 0

26.08 0 - 0
59.52 0 - 0
31.47 0 - 0
168.64 0 - 0

672.52 0 - 0
153.55 112.42 - 86.52
164.46 101.51 - 77.94
306.48 56.83 - 56.83
199.06 0 - 0
106.3 0 - 0
105.3 0 - 0

11.84 0 - 0
277.4 0 - 0
128.13 0 - 0
11.84 0 - 0
3.55 0 - 0
10.08 0 - 0
7.2 0 - 0
16.8 0 - 0
24.59 0 - 0
338.97 0 - 0

6.55 0 - 0
17.5 356.55 - 177

6.55 0 - 0
237.05 137 - 137

6.55 0 - 0

8.96 0 - 0
6.55 0 - 0
5.41 0 - 0
7.34 0 - 0

21.53 0 - 0
6.55 0 - 0

12.2 0 - 0
6.55 0 - 0

0.0300000000000011 15.35 - 0
0 17.78 - 0
15.38 0 - 0
17.78 0 - 0

15.38 0 - 0
17.78 0 - 0

11.71 0 - 0
13.19 0 - 0
14.8 166 - 166
3.12 0 - 0

11.71 0 - 0
13.19 0 - 0
3.12 0 - 0

5.66 0 - 0
86.96 0 - 0

7.77 0 - 0
32.33 0 - 0
137.73 0 - 0
14.28 0 - 0
0 0 -

123.23 0 - 0
11.88 0 - 0

123.23 0 - 0
11.88 0 - 0

31.35 0 - 0
11.88 0 - 0

16.02 0 - 0
11.88 0 - 0

3.55 0 - 0
10.08 0 - 0
7.2 0 - 0
16.8 0 - 0
24.59 0 - 0

6.55 0 - 0
15.38 0 - 0
17.78 0 - 0

6.55 0 - 0
15.38 0 - 0
17.78 0 - 0

6.55 0 - 0
15.38 0 - 0
17.78 0 - 0

6.55 0 - 0

6.55 0 - 0

10.17 0 - 0

166.65 0 -
3.55 0 -
3.91 0 -
1.27 0 -
66.86 0 -
15.78 0 -
128.13 0 -
203.49 0 -
15.78 0 -
10.8 0 -
0 0 -
0 0 -
211.77 0 -
1.81 0 -
0 10.8 -
0 0 -
0 0 -
211.77 0 -
0 1.81 -
0 10.8 -
0 0 -
0 0 -
1.81 0 -
9 0 -
0 0 -
0 0 -
1.81 0 -
9 0 -
0 0 -
0 0 -
1.81 0 -
9 0 -
0 0 -
0 0 -
4.46 0 -
0 0 -
0 0 -
0 0 -
31.35 0 -
0 0 -
0 0 -
16.02 0 -
0 0 -
0 0 -
0 0 -
16.8 0 -
24.59 0 -
0 0 -
0 0 -
123.23 0 -
1538 0 -
17.78 0 -
0 0 -
0 0 -
21 102.23 -
0 15.38 -
0 17.78 -
0 0 -
0 0 -
15.38 0 -
17.78 0 -
0 0 -
0 0 -
0 0 -
122.57 0 -
122.57 0 -
105.17 0 -
0 0 -
0 0 -
7.18 0 -
40.12 0 -
40.12 0 -
17.28 0 -
18.05 0 -
18.05 0 -
4.83 0 -
0 0 -
0 0 -
0 0 -
35.9 0 -
6.08 0 -
105.78 0 -
0 0 -
147.76 66.32 -
434.17 0 -
190.5 0 -
255.1 0 -
11.06 0 -
0 0 -
0 0 -
0 0 -
0 0 -
3.55 0 -
3.91 0 -
1.27 0 -
66.86 0 -
15.78 0 -
128.13 0 -
203.49 0 -
15.78 0 -
10.8 0 -
0 0 -
0 0 -
1.81 0 -
10.8 0 -
0 0 -
0 0 -
1.81 0 -
10.8 0 -
0 0 -
0 0 -
1.81 0 -
10.8 0 -
0 0 -
0 0 -
1.81 0 -
9 0 -
0 0 -
0 0 -
1.81 0 -
9 0 -
0 0 -
0 0 -
4.46 0 -
0 0 -
0 0 -
0 0 -
0 0 -
6.73 0 -
9.72 0 -
3.55 0 -
129.98 0 -
0 0 -
0 0 -
6.25 0 -
0 0 -
0 0 -
6.25 0 -
0 0 -
0 0 -
6.25 0 -
0 0 -
0 0 -
6.25 0 -
0 0 -
0 0 -
6.25 0 -
0 0 -
0 0 -
9.25 0 -
0 0 -
0 0 -
0 0 -
41.39 0 -
156.39 0 -
156.39 0 -
64.51 0 -
16.02 0 -
0 0 -
0 0 -
0 0 -
3.12 0 -
120.56 0 -
15.07 0 -
217.11 0 -
64.5 0 -
47.73 0 -
69.23 0 -
88.28 0 -
2.68 0 -
38.05 0 -
0 0 -
0 0 -
311.77 0 -
120.56 0 -
15.07 0 -
217.11 0 -
64.5 0 -
0 0 -
0 0 -
311.77 0 -
44.99 0 -
53.36 0 -
56.54 0 -
2.02 0 -
0 0 -
0 0 -
110.26 0 -
44.99 0 -
53.36 0 -
56.54 0 -
2.02 0 -
0 0 -
0 0 -
68.62 0 -
44.99 0 -
2.02 0 -
0 0 -
0 0 -
46.93 0 -
0 0 -
0 0 -
59.52 0 -
0 0 -
0 0 -
672.52 0 -
219.17 46.8 -
219.17 46.8 -
363.31 0 -
199.06 0 -
106.3 0 -
105.3 0 -
0 0 -
0 0 -
0 0 -
0 0 -
6 0 -
0 0 -
0 0 -
13 0 -
0 0 -
0 0 -
10 0 -
0 0 -
0 0 -
2 0 -
0 0 -
0 0 -
1 0 -
0 0 -
0 0 -
7 0 -
0 0 -
0 0 -
22 0 -
0 0 -
0 0 -
3 0 -
0 0 -
0 0 -
1 0 -
0 0 -
0 0 -
6 0 -
0 0 -
0 0 -
4 0 -
0 0 -
0 0 -
25 0 -
0 0 -
0 0 -
31 0 -
0 0 -
3 0 -
0 0 -
0 0 -
1 0 -
0 0 -
0 0 -
1 0 -
Activity Completion / Activity Completion / Activity Completion / Activity Completion /
Biling 9 Biling 10 Biling 11 Biling 12

0
132.51
132.51
0 132.51
0
0
0

83.09

0
16.28
106.02
0
0

3.45
3.45
3.45
0
0
0

0
0
0
0
0
0
0
0
0
0

0
44.99
53.36
0 56.54
54.25

0
0
0
0
54.25
0

0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0

0
0
0
0

0
25.9
23.57
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
179.55

0
0

0
0
0
0

0
0

0
0

0 15.35
0 17.78
0
0

0
0

0
0
0
0

0
0
0

0
0

0
0
0
0

0
0

0
0

0
0

0
0

0
0
0
0
0

0
0
0

0
0
0

0
0
0

10.8

1.81
10.8
102.23
15.38
17.78
66.32
46.8
46.8
Activity Completion / Activity Completion / Activity Completion / Activity Completion /
Biling 13 Biling 14 Biling 15 Biling 16
Activity Completion / Activity Completion / Activity Completion / Activity Completion /
Biling 17 Biling 18 Biling 19 Biling 20

You might also like