Mahadev
Mahadev
Date: 9/2/2022
Working Time: 9 AM TO 7 PM
Details Remarks
etails
Sealing samples received from geethambika
1.5 IP54 test setup preparation with Pratik. No solid part observed inside after t
1.6 Pull out strength test of jumper cable.
2 Documentation
2.1 IP5X test report preparation.
2.2 Pull out strength test report pf plug body.
2.3
2.4
3 Timeline Entries/Related work
3.1
3.2
4 Communications/Meetings
4.4
Date: 3/9/2022
Working Time: 9 AM TO 7 PM
Details Remarks
etails
gainst Solid particles) test trial of Jumple cable
ction report.
p samples
Daily Individual Repo
Name: Mahadev Jaybhay
Designation: New Product Development Engineer
Sr. No. Work Details
1 Shopfloor/Lab/All Inspection & Testing Details
1.1 FOI & Tensile test of FCCT-200X7.4
1.2 INPROCESS INSPECTION-H1-DG-8X25 BODY MOULD
1.3 INPROCESS INSPECTION-H3-FCCTN-300X4.8 NAT REG
1.4 INPROCESS INSPECTION-H8-FCCT-200X4.8 BLUE REG
1.5 INPROCESS INSPECTION-H11-FCWUWG TYPE BODY
1.6 INPROCESS INSPECTION-H12-DG-10X30 BODY MOULD
1.7 INPROCESS INSPECTION-V3-CHOK BOX WIRE HOLDER
1.8
1.9
1.10
2 Documentation
2.1 First Piece Inspection report of FCCT-200X7.4
2.2 Tensile Report Of FCCT-200X7.4
Inprocess Inspection Report of 300X4.8 NAT REG,DG-8X25 BODY, CH
2.3
HOLDER
EVERY THREE HOUR
2.4 FINAL INSPECTION
REPORT
DAILY ONLINE CHECK
2.5
SHEET
2.6 DAILY PRODUCTIVITY REPORT
2.7
2.8
3 Timeline Entries/Related work
3.1
3.2
4 Communications/Meetings
4.1
4.2
4.3
4.4
Date: 5/9/2022
Working Time: 9 PM TO 7 AM
Details Remarks
etails
MOULD
NAT REG
BLUE REG
PE BODY
DY MOULD
RE HOLDER
4.1
4.2
4.3
4.4
Date: 6/9/2022
Working Time: 9 PM TO 7 AM
Details Remarks
etails
Not ok(M/C stops)
LK REG
EPORT
Daily Individual Repo
Name: Mahadev Jaybhay
Designation: New Product Development Engineer
Sr. No. Work Details
1 Shopfloor/Lab/All Inspection & Testing Details
Complete the assembly of Jumper Cable with New Sealing samples receive
1.1
Rubber
1.2 Visit to ELCA lab.
1.3 Vitness IP54 test dust protection test.
Neoprene Sealing Rubber specimen FR-UL-94-V0 test conducted with Pra
1.4
current test setup material comply with the standard.
1.5 Receptacle Hex sample inspection.
2 Documentation
2.1
2.2
2.3
2.4
3 Timeline Entries/Related work
3.1
3.2
4 Communications/Meetings
Date: 9/14/2022
Working Time: 9 AM TO 7 PM
Details Remarks
etails
Sealing samples received from geethambika
1.2 Conduct 500N Pull out test of plug assembly with Pratik.
1.3 Check UC sample Data & shared Feedback to Chetan Sir
Neoprene Sealing Rubber specimen FR-UL-94-V0 test conducted with Pra
1.4
current test setup material comply with the standard.
1.5
2 Documentation
2.1 Compression Test Report (500N)
2.2 Flammability test Report UL-94-V0
2.3
2.4
3 Timeline Entries/Related work
3.1
3.2
4 Communications/Meetings
4.2 Communicate with MR. Pravin From Geethambika Rubber regarding samp
Communiacte with Ashok sir regarding Tube clamp EPDM rubber FR test
4.3
them of FR test.
4.4 Attend daily CFT meeting
Date: 9/15/2022
Working Time: 9 AM TO 7 PM
Details Remarks
etails
Cable (500N) test woth Dhiren & Pratik. Completed
Pratik. Test Pass
tan Sir Completed
0 test conducted with Pratik.Initially with our
d.
Completed
Completed
Completed
4.1 Meeting with Mr. Ajinkya from Elca Lan Regarding Jumper cable Testing
4.3 Communicate with Mrs.Harshali regarding material test quotation & drop m
4.4 Attend daily CFT meeting
Date: 9/16/2022
Working Time: 9 AM TO 7 PM
Details Remarks
etails
e water Ingress test. -
-
New Mumbai. Test Pass
est coducted for three samples. Test Pass
am samples FR test Test Fail.
prene 100%)
prene 60:40)
4.2 Communicate with Mrs.Harshali regarding material test quotation & drop m
Discussed the Spiral Glands Fitness problem with Toolroom & Finalize the
4.3
overcome the fitment problem.
4.4
5 Pending Work Details
5.1 Jumper Cable Flammability test.(UL94-V0)
ndividual Report QAQC/FR/17
Date: 9/17/2022
Working Time: 9 AM TO 7 PM
Details Remarks
etails
Fitment pronlem found
Fitment pronlem found
ok
ok
(WIP)
1.3 Rubber sanple specimen checked before further send to test lab & gives Ap
1.4
1.5
2 Documentation
2.1 Process Failure Mode And Effect Analysis (PFMEA) of M12 cable Gland B
2.2 Process Failure Mode And Effect Analysis (PFMEA) of PG 7 cable Gland
2.3 UC 14-C trial Inspection report.
2.4 IP54 Drafted test report checked, send correction input ti ELCA lab.
3 Timeline Entries/Related work
3.1
3.2
4 Communications/Meetings
Date: 9/19/2022
Working Time: 9 AM TO 7 PM
Details Remarks
etails
Cond. Ok
Cond. Ok
nd to test lab & gives Approval fot the same. Completed
.
ail test.