OPERATION MANUAL
1
Welcome you to purchase!
Congratulations on your purchase of SBTZ Series Different Diameter Cylinder Conditioner. This
type of Conditioner is characterized by long conditioning time, uniform liquid addition, high throughput,
low noise, convenient operation and maintenance. When general feedstuffs are conditioned with this
conditioner, their gelatinizing degree can reach 45~50%. Prior to use, please read through the operation
manual and well know the safety points, different performances, requirements to installation and
operation etc. of this type of UMT Pellet Mill, so that you can expertly operate and use this machine, and
Important Explanations
Documents
This Operation Manual shall be provided to your working personnel in charge of operating and
managing the equipment manufactured by Jiangsu Muyang Group. Therefore, it is very important to
If the contents of this Operation Manual and the specifications of product are to be modified, we
would not notify of them further. Jiangsu Muyang Group reserves the right to modify the specifications of
destination. If it is sure there is any damage caused during transport, a necessary claim procedure must
be taken according to the supply contract. The repair expense shall be borne by relevant risk undertaker.
The equipment, which cannot be installed in predetermined place immediately, must be stored in a
weatherproof place with facilities against external infringement in original packages. Any loss arising
Storage
The equipment, which cannot be installed in predetermined place immediately, must be stored in a
weatherproof place with facilities against external infringement in original packages. Any loss arising
2
Installation
The equipment and parts manufactured by Jiangsu Muyang Group shall be installed only by the
trained technical personnel based on installation specifications provided together with the equipment.
Structure
If several structures are introduced in the documents provided, only the structures specified in
Supply Contract shall be effective. We reserve the right of improvement before delivery.
instructions and operation regulations in provided documents before startup. Lubricating oil shall be filled
prior to first startup, such as oil for variable speed devices. Prior to first startup, check the machine
whether the lubricating oil (grease) such as oil for variable speed devices has been filled and the belts
Accident prevention
The accident prevention rules in related documents must be well known and strictly obeyed. Jiangsu
Muyang Group devotes to manufacturing machinery equipment according to the latest National Safety
Standards. Customers shall tell us the local safety rules before manufacturing. Additional expenses
Maintenance/cleaning
Only professional persons can carry out maintenance and shall well know relevant stipulations in
the documents provided by us. These stipulations are helpful for keeping the equipment in good
condition, reducing wear and prolonging the service life. Cleaning shall be done according to relevant
Copyright
We reserve the copyright of this document and related contents. The receiver of this Manual shall
admit the copyright and shall not provide the document wholly or partially to the third party without our
authorization in writing beforehand, and shall not use it for other purpose.
Quality guarantee
We are responsible for the quality guarantee specified in the Contract, but the precondition is: the
real spare parts manufactured by Jiangsu Muyang Group shall be certainly used. Any losses caused by
using the spare parts from other manufacturers shall not be borne by our Group. Any losses caused by
3
improper operation or disobeying our operation regulations or wrong operation by untrained personnel
Education duty
The leaders of an enterprise owning the equipment from Jiangsu Muyang Group shall have the duty
to allow the operators to know the operating instructions, and shall point out where the especial dangers
Foreword
This Operation Manual is a technical document for SBTZ Series Different Diameter Cylinder
Conditioner.
This Operating Manual should be provided to the personnel in charge of operation and
management of this equipment for reading and use.
The operators of this machine should be qualified and specially trained.
The contents of this Operating Manual include the knowledge about installation,
operation and maintenance of this machine, which the operators of this machine must well
understand.
The contents unrelated to specialized knowledge are not included in this Manual.
The maintenance work beyond the general maintenance scope is also not included in
this Manual.
This type machine is manufactured according to generally accepted technical
specifications. However, dangers can still be resulted from improper use.
The knowledge about the safety for the extruder is summarized in Chapter 1 of this
Operation Manual and is showed in other chapters by following symbol:
Statement:
* This document is the Operation Manual for SBTZ Series Different Diameter Cylinder
Conditioner. The right to interpret this Operation Manual belongs to Jiangsu Muyang Group.
Any legal persons and individuals may not copy and duplicate this document for
4
commercial use!
Contents
Safety …………………………………………4 I n s ta l l a t i o n o f e q u i p m e n t … … … … … … … 9
5
Personal protection: Countermeasures against Accidents
1 All the mechanical equipments manufactured by Jiangsu Muyang Group are equipped with safety
devices, which are consistent with modern technical level and universally effective safety rules prior
to ex works, so that the customers can use the machines in accordance with the regulations.
2 The enterprises are obligated to execute following regulations to guarantee operators' safety.
3 The shield cap for coupling must be mounted and closed at any moment. It is very dangerous to
personal safety, if they are open or disassembled. This point is also applicable for the preventive
device of manipulator.
4 The safety limit switches should always be kept in good order. The safety limit switches may not be
overlapped or discarded.
5 The cover plate grating, grid bar or guard grating are usually installed and delivered together with
the machine. They can only be disassembled with tools. And the machines with such kind of
devices can never put into work until the above-said devices have been properly installed.
6 The driving motor must be switched off completely when carrying out inspection, commissioning,
repair and maintenance. This can be realized through a full-phase separating and lockable switch
installed near the machine or on the operation desk and control panel on the site. It is not enough
7 If the machine needs other energy like pneumatic, hydraulic, steam and hot water energy, it is
necessary to cut off their energy supply or turn off the switch, and eliminate the pressure in the
8 As for handling heated or cooled parts and components of the machine, especial care should still
9 If you have pressed the emergency stop switch to stop the machine and you want to reset the
switch, so it is not permissible to only re-press this button to restart the machine. And the machine
10 If some machines are equipped with a local shutdown system, especial care should be taken. Read
the instruction manuals attached with the machine carefully. In such machines with a local
shutdown system, temperature will rise because pressure or vacuum will occur after they have
6
Personal protection:Countermeasures against Accidents
11 If the operators employed cannot read or write, the owner has the duty to explain to them clearly
where dangers exist and warn them that special attention should be paid.
12 The cleaning, lubricating and oiling of the machine or its parts and components may be carried out
only when the machine is stopped. If you must climb on or enter the machine to do such work, the
mandatory provisions shall be made without exception: the power supply of motors must be cut off
completely and the switch must be locked! Attention must be paid to safety measures for climbing.
13 Be careful, sampling from inside the machine can never be carried out unless there is not any
danger. Usually, the samples can be taken from the pipe under the machine instead of inside
machine.
14 Clear off the deposited dust, dirties and materials frequently. Keeping the machine clean can
enhance production safety and the cleaning level of workshop, and is also beneficial to dust
explosion prevention.
15 If oil (grease) leakage occurs, clean it immediately and seal well the place where leakage occurs,
for oil or grease leaked on the floor will easily bring about hazards to the operators.
16 In production operation, the machine must be equipped with safety devices, which may be neither
removed and abandoned nor reduced in functions. Otherwise, we are not responsible for any
accidents resulted here from, and reserve the right to ascertain where the responsibility lies.
17 Please execute the special regulations on accidents prevention in the operation manual provided
by us.
18 Only the trained professionals are allowed to operate the machine and equipment manufactured by
our Company.
If you decide not to use the machine any longer after it is used for a certain number of years, the
measures for environmental protection and reutilization should be taken: drain the liquids inside the
machine (like motor oil, gearbox oil, brake oil and coolant etc.) into special containers and send them to
the preparation workshop. The plastic parts shall be picked out for reutilization. The metal parts shall be
7
Explosion protection: Countermeasures against Dust Explosion and Fire
Hazard
(3) In order to reduce dust emission to surrounding areas, all conveying devices, cyclone separators and
dust collectors should be kept in good condition. Especially, the unsealing phenomena of pipes or
(4) In order to reduce dust explosion hazard, dust everywhere must be cleaned out frequently and
effectively.
(2) Check and clean all the magnetic separators, stoners regularly, at least once a day.
(3) In order to avoid heat generation, it is necessary to regularly check the functions of all main shafts
and bearings, at least once a week, and to regularly fill up lubricating oil.
Electric apparatus
Regularly check the electric apparatus and articles, and special attention should be paid to
(1) It is forbidden to use any flashlights and other lamps without shielding or explosion-proof glass.
(3) It is necessary to immediately repair or replace the electric apparatus and equipment if any failure
occurs.
(4) The cables without conduits are not allowed to be installed on the floor.
(5) Cut off the power supply of the machine when going off work.
(6) An electrician should be assigned to check the insulation of all the lines of electric network according
8
Explosion protection: Countermeasures against Dust Explosion and Fire Hazard
(1) Smoking is forbidden, which is applicable to all workers and staff of the enterprise as well as guests,
(2) If the tools such as welding machine or soldering lamp (flame soldering lamp) etc. are required for
repair or installation, do as best as possible to arrange the work in a special workshop or on a special
site.
(3) If it is necessary to carry out welding or the like directly in production area or storehouse once in a
while, written applications must be submitted to a related supervisor in advance for written approval.
The above mentioned operations can be carried out only when special safety measures have been
taken, such as laying pieces of water soaked canvas or canvas special for covering on the
surrounding area and preparing fire extinguishers. After completion of the operation, the welding site
and the surrounding area are to be monitored at least for 10h. The gas cutting sparks are very
dangerous, for people can't see where they will fly on earth. They can cross through the narrow
clearance of walls and drop downstairs or to the next rooms, or even fly off 10 m away in distance. If
the sparks drop in dusts, fire accidents may occur at any time.
(4) Welding is prohibited on a running conveyor. If the welding work is necessary, shut down the machine
first, and then make a thorough cleaning and isolate both sides of the welding site tightly with
materials like mineral wool to avoid connecting with other conveying devices, silos or tanks. If the
work is to be done on the chutes or conveying pipes, it is necessary to disassemble them or divert
their lower ends and seal them to avoid welding sparks entering the conveying pipes or silos.
9
Safety
Safety devices, such as safety limit switch of access door must be kept in good function all the time.
It is necessary to completely disconnect all the phases (electric conductor) and completely cut off the
power supply of driving motor to shut down it during repair, commissioning, inspection and maintenance.
If the operators employed cannot read or write, the owner has the duty to explain to them clearly
where dangers exist and warn them that special attention should be paid.
The cleaning, lubricating and oiling of the machine or its parts and components must be carried out
only when the machine is shut down. If it is required to climb on or enter the machine to do such work,
the mandatory provisions shall be made without exception: the power supply of motors must be cut off
Explosion Proof
Countermeasures against dust explosion and fire hazard
Electric apparatus
Regularly check the electric apparatus and articles, and special attention should be paid to the
following points:
It is forbidden to use any flashlights and other lamps without shielding or explosion-proof glass.
If it is necessary to carry out welding or the like directly in production area or storehouse once in a
while, special safety measures must be taken, such as laying pieces of water soaked canvas or canvas
special for covering, and preparing fire extinguishers on the working site.
10
Safety
Grounding
In order to prevent static spark, the machine must be grounded and the leakage resistance of all
components in the machine to the ground shall be less than 106Ω.
Cleaning
Regularly clean away the deposited dust, dirt or materials. Keep the equipment clean to improve its
● Check whether the working voltage and frequency of the machine comply with the data shown on the
● All power sources of the control system must be connected according to the wiring diagrams, so as
to actually switch on and off the phase conductors when using single-phase power supply.
Safety program
z This series equipment shall be operated only by trained and designated personnel.
z All rotating components are equipped with guard shields to prevent from touching at will. The
protecting devices shall be dismounted only by using spanner.
z An air switch is installed on the access door of each conditioner. The requirement to the electric
control system is to ensure that the machine cannot be started up when any access door is open.
● Wear protective gloves and safety helmets etc. dung repair and maintenance.
Application
This Series Conditioner is specially designed to aim at conditioning of feed processing. Generally, it is
11
Application
General
SBTZ series Different Diameter Cylinder Conditioner is a patented product of Jiangsu Muyang
SBTZ Series Conditioner is characterized by long conditioning time, uniform liquid feeding, high
When the general feedstuffs are conditioned by this series equipment, the gelatinization degree of
This series equipment has different specifications; customers can select and use as required at will
or consult the technical personnel of Muyang for selecting, so as to obtain the best technical and
economic benefit.
This series equipment services the function of adding steam into materials and synchronously
Sort of product
Conditioner
Different diameters and different speeds
Twin shaft
Technical parameters
Power of main Material inlet Material outlet Conditioning
Model Driving type
machine (kW) dimension (mm) dimension (mm) time (sec)
12
Application
For outside view sketch of SBTZ10, SBTZ20 and SBTZ28 type conditioners, see Fig.1.
These three conditioners are driven by gear engagement . Its external structure is mainly composed
of a sealed fixing device, a wallboard, an access door, a reinforcement bar, a platform, a housing, a
liquid adding interface, a material inlet, a gear wheel, a coupling, a motor, a motor base, a stander, a
The outside view sketch of SBTZ33A, SBTZ39 and SBTZ45 type conditioners refers to Fig. 2.
The driving of these two conditioners is realized by reduction gearboxes. Its external structure is
mainly composed of a sealed fixing device, a wallboard, a housing, a liquid adding interface, a
reinforcement bar, a material inlet, a coupling, a reducing gearbox, a motor, a motor base, a stander, a
13
Application
Mainly inside components: bearing, seal ring, long paddle, slow shaft, short paddle, fast shaft etc.
1. Shaft 2. Seal ring 3. Long paddle 4. Slow shaft 5. Short paddle 6. Fast shaft
Fig. 3 Schematic diagram for inside structure and usual rotating direction of conditioner
1. Bearing 2. Seal ring 3. Long paddle 4. Slow shaft 5. Short paddle 6. Fast shaft
14
Transportation and installation
Requirement to transportation
SBTZ45, SBTZ39, SBTZ33A and SBTZ28 type conditioners must be unloaded and handled with a
In order to hoist and transport the equipment safely, it is necessary to use proper steel wire suitable
Requirement to storage
If the conditioner or its accessory components cannot be assembled immediately on site after
transportation, they should be stored at a safe place without vibration, and covered properly to prevent
dust and moisture from entering the machines. If the machines are stored in the open air, it is necessary
to lay them on the wood and cover them with rainproof and dustproof canvas.
Installation of equipment
Important points of equipment installation
1. The ground and frame construction for installing the conditioner shall have sufficient stability
15
and supportability to bear the full load of running machine.
2. There must be sufficient space around the conditioner convenient for operation, repair and
maintenance.
3. Put the conditioner at the required position during installation. Insert the fixing bolts into the
mounting holes in conditioner, and fix the conditioner tightly to other equipment or floor.
4. If other equipment is mounted in the conditioner as per the technological requirements, its
weight shall not exceed the weight of the conditioner, and it shall be mounted stably and tightly.
! Prior to the first startup of main motor of the conditioner and the first startup of main
motor after dissembling the coupling, please read the following text carefully:
The relative position of rotating direction of two main shafts shall be selected properly during
mounting the coupling. The correct mounting position is shown in Fig.4 (please pay attention to the
1. Confirm the power cables of main motor are not switched on, and then disassemble them to
2. Randomly select any paddle of one main shaft (shaft A), make it turn and close to the horizontal
3.Turn the main shaft B, make the included angle be about 30° in radial direction between the
paddle on B shaft and the paddle selected on the main shaft A, and then fix the relative position of two
paddles;
5. Manually rotate the main shaft or the belt of the main motor to ensure the two shafts cannot
collide each other when they are rotating. If any collision occurs , return to step 2 and repeat.
16
Transportation and installation
17
Transportation and installation
! Carefully read the following text and pictures prior to correct installation of the steam
pipeline.
Note: This part of steam pipeline is designed for this series conditioners matched with pellet mills. If
this series conditioners matched with other equipment (such as extruder), please contact technical
personnel of Muyang.
The connection of steam pipeline shall be carried out by customer in accordance with the local laws
and regulations.
The steam pipeline should be connected by customers according to local laws and regulations.
Design of steam pipeline is one of the significant factors greatly effecting the conditioning result of
material.
1. It is necessary to ensure a stable and continuous steam source with a pressure over 0.7MPa;
2. Prior to entering the conditioner, steam shall run through a steam distributing pocket;
3. Prior to entering the conditioner, steam shall run through a steam-water separator;
4. Stop valves shall be mounted both before and after the steam distributing pocket;
5. A safety valve and a manometer shall be mounted in the steam distributing pocket;
7. The length of pipeline between steam distributing pocket and the conditioner shall not exceed
10m;
8. A pressure reducing valve shall be mounted in the pipeline coming out of the steam distributing
pocket;
9. A draining valve and a stop valve shall be mounted in the pipeline entering the conditioner (closed
to the conditioner);
10. Considering all the important points above, it is suggested to design of pipeline as per Fig. 6;
11. If the requirement to material conditioning is much higher or some high quality material is to be
18
12. If “quantification” is required to the whole conditioning system, namely the feeding material,
steam and liquid adding shall be quantified and controlled accurately, or the whole conditioning system
13. The customers who need to redesign the pipeline system should contact Muyang technical
personnel.
In addition, it is necessary to lay a thermal insolating layer on the steam inlet and outlet pipes for the
purpose of improving the service efficiency of energy source, avoiding scald to the operators and heat
Check the pipelines for tightness after they have been connected. It is necessary to flush the
pipeline thoroughly, so as to clear away all the dirt from the pipes.
Electric connection
Weak and Heavy current cabinets must be connected in accordance with national standards and
local stipulations.
!
Lay the power cables and mount the circuit protection breakers according to supply voltage, motor
Be sure to connect all the earth wires well and check them.
The power cables in the electrical cabinets shall be laid on the equipment installing site.
Pay attention to the interlocking between the air switches on all access doors and main motor when
19
No. Designation No. Designation
1 Stop valve 6 Filter
2 Safety valve 7 Steam distributing pocket
3 Manometer 8 Steam-water separator
4 Check valve 9 Pressure reducing valve
5 Draining valve 10 Reducing pipe
20
Operation of conditioner
For the inside structure and usual rotating direction of conditioner, see Fig. 3, which shows the
When two main shafts are rotating in opposite direction, the residue in the conditioner is less and the
21
Malfunction and troubleshooting
The conditioning The steam added is little. Increase the steam supply.
temperature is The pipeline system is out of order. Inspect and repair the pipeline
2
not sufficient, or The steam pressure is not sufficient. system.
The conditioning Water content in steam is too much. Discharge water from each draining
content.
Frictional noise Guard shield is improperly mounted. Adjust the position of guard shield.
5 at guard shield Guard shield is deformed due to Adjust the deformed position of the
Abnormal noise
Lubricating grease is dry. Fill lubricating grease.
6 in sealed fixing
Fixing bolt is loose. Fix the fixing bolt.
device.
22
Repair and maintenance
Proper repair and maintenance is the key of keeping the conditioner in the best function and can
Cleaning
The cleanness of all the driving components is very important, so it is necessary to regularly clean
Material outlet Clear away the material at the outlet before startup each time
Inside chamber and paddles of Open the access door of conditioner to check and clean them
conditioner housing once a month
Guard shield of belt pulley (33, 39 Clear away dust or material deposited on the guard shield
and 45 type) once a week
Belt (33, 39 and 45 type) Clear away dust or material deposited on the belt once a week
Clear away dust or material deposited on the outer housing of
Motor
motor once a week
Lubricating
Selection of lubricating grease
Lubricating grease selected shall be fit for working of the equipment. Oil cups for lubricating grease
are equipped at each position with relative motion and friction prior to ex works of the conditioner. Fill
Selection of lubricating oil for reducing gearbox and its replacing period ( for SBTZ33A, SBTZ39
Lubricating oil for reducing gearbox of conditioner recommended by Muyang Group are shown as
23
follows:
Lubricating oil for reducing gearbox of conditioner shall be replaced once every half a year.
Lubricating oil for a new equipment shall be replaced after first use for two months.
When it is close to but not reach this value, the paddles shall be replaced.
1. Cut off the power supply and dismount the guard shield of belt pulley and belt, and ensure the safety
of repairmen;
2. Dismount the coupling (gear wheel) and other components, dismount the sealed fixing device on
3. Dismount the wallboard on one end of the conditioner and take out the main shaft;
4. Pay attention to the original installing angle of paddles and the installing depth of thread on the
6. Check whether the space between paddle and housing is normal or not, if there is friction between
24
List of wearing parts
25
List of wearing parts
26
List of wearing parts
27