IMEC ENGINEERING SOLUTIONS Pvt. Ltd.

Contact Person Address: Plot no ST 1/11,Sector 15 Near Shan Chowrangi


Mr. Rashid Aziz Cost Engineering Department Korangi Industrial Area, Karachi

IMEC
aspire invent achieve
Customer
Canwin Associates
Quotation
Contact No:
NTN No:
+92215121712-13
4356800-9
Date Email: info@imec-solutions.com.pk
7/9/2021 Quotation # 0019091920-00233

S. No Description Designing Material Machining Assembly Inspection Transport Overhead's Profit Total Qty. Amount

1 55,000 1,774,542 400,000 130,000 45,000 5,000 240,954 397,574 3,048,071 1 3,048,071
Supply of Instrument Panel
Manual Welding Jig Poka Yoke
System SA 1 - 38, 28, 31, 35,
21, 35, (3studs) Parts.

2 35,000 1,513,347 340,000 90,000 35,000 5,000 201,835 333,027 2,553,209 1 2,553,209
Supply of Instrument Panel
Manual Welding Jig Poka Yoke
System SA 2 - 20, 24, 23, 19,
17, 25, Parts.

3 60,000 1,997,323 420,000 136,000 48,000 5,000 266,632 439,943 3,372,899 1 3,372,899
Supply of Instrument Panel
Manual Welding Jig Poka Yoke
System SA 3 - 1, 2, 3, 14, 15,
16, 13, 8, 6, (7 studs) Parts.

4 15,000 1,474,770 350,000 48,000 35,000 5,000 192,777 318,082 2,438,630 1 2,438,630
Supply of Instrument Panel
Manual Welding Jig With Poka
Yoke System SA 4 - 9, 10,
11,37, 36, Parts.

Note: All prices are excluding Tax.


Materials are subjected to Customer demand.
Completion of work should be after 45 days of PO. Grand Total 11,412,808
This quotation is valid for a month.
Cost Engineering Head of Sales
S. Kazim Ali Danish Siddiqui

Plot no ST 1/11,Sector 15 Near Shan Chowrangi Korangi Industrial Area, Karachi


IMEC ENGINEERING SOLUTIONS Pvt. Ltd.
Contact Person Address: Plot no ST 1/11,Sector 15 Near Shan Chowrangi
Mr. Rashid Aziz Cost Engineering Department Korangi Industrial Area, Karachi

IMEC
aspire invent achieve
Customer
Canwin Associates
Quotation
Contact No:
NTN No:
+92215121712-13
4356800-9
Date Email: info@imec-solutions.com.pk
7/9/2021 Quotation # 0019091920-00233

S. No Description Designing Material Machining Assembly Inspection Transport Overhead's Profit Total Qty. Amount

5 Supply of Instrument Panel 75,000 2,126,067 442,000 146,000 55,000 5,000 284,907 470,096 3,604,070 1 3,604,070
Robot Welding Jig With Poka
Yoke System SA1 + SA 2 + SA 3
+ SA 4 + 18, 6, 22, 18, 26, 33,
30, 32 Parts.

6 45,000 484,553 224,000 48,000 28,000 5,000 83,455 137,701 1,055,710 1 1,055,710

Supply of Instrument Panel


Checking Fixture.

Note: All prices are excluding Tax.


Materials are subjected to sheet nature.
Delivery should be after 45 days of PO. Grand Total 4,659,780
This quotation is valid for a month.
Cost Engineering Head of Sales
S. Kazim Ali Danish Siddiqui

Plot no ST 1/11,Sector 15 Near Shan Chowrangi Korangi Industrial Area, Karachi


Supply of Instrument Panel Manual Welding Jig Poka Yoke System SA 1 - 38, 28, 31, 35, 21, 35, (3studs
1
S. No Particulars Sizes
1 Base 1000
2 Post 1
3 Post 2
4 Post 3
5 Post 4
6 Post 5
7 Post 6
8 Consumable
9 Clamp Cylinder
10 Stand + Rotter
11 Solenoid Valve
12 Proxy Sensors
13 DB
14 Fittings + Pipe
15 Paint
16 Hand Valve
17 MS material
18 Miscellaneous

Supply of Instrument Panel Manual Welding Jig Poka Yoke System SA 2 - 20, 24, 23, 19, 17, 25, Parts.
2
S. No Particulars Sizes
1 Base 1000
2 Post 1
3 Post 2
4 Post 3
5 Post 4
6 Post 5
7 Post 6
8 Consumable
9 Clamp Cylinder
10 Stand + Rotter
11 Solenoid Valve
12 Proxy Sensors
13 DB
14 Fittings + Pipe
15 Paint
16 Hand Valve
17 MS material
18 Miscellaneous
Supply of Instrument Panel Manual Welding Jig Poka Yoke System SA 3 - 1, 2, 3, 14, 15, 16, 13, 8, 6, (7 studs) Parts.
3
S. No Particulars Sizes
1 Base 700
2 Post 1
3 Post 2
4 Post 3
5 Post 4
6 Post 5
7 Post 6
8 Consumable
9 Clamp Cylinder
10 Stand + Rotter
11 Solenoid Valve
12 Proxy Sensors
13 DB
14 Fittings + Pipe
15 Paint
16 Hand Valve
17 MS material
18 Miscellaneous

Supply of Instrument Panel Manual Welding Jig With Poka Yoke System SA 4 - 9, 10, 11,37, 36, Parts.
4
S. No Particulars Sizes
1 Base 750
2 Post 1
3 Post 2
4 Post 3
5 Post 4
6 Post 5
7 Post 6
8 Consumable
9 Clamp Cylinder
10 Stand + Rotter
11 Solenoid Valve
12 Proxy Sensors
13 DB
14 Fittings + Pipe
15 Paint
16 Hand Valve
17 MS material
18 Miscellaneous
Supply of Instrument Panel Robot Welding Jig With Poka Yoke System SA1 + SA 2 + SA 3 + SA 4 + 18, 6, 22, 18, 26, 3
5
S. No Particulars Sizes
1 Base 600
2 Post 1
3 Post 2
4 Post 3
5 Post 4
6 Post 5
7 Post 6
8 Consumable
9 Clamp Cylinder
10 Stand + Rotter
11 Solenoid Valve
12 Proxy Sensors
13 DB
14 Fittings + Pipe
15 Paint
16 Hand Valve
17 MS material
18 Miscellaneous
10 Servo Motor With Brake

6
S. No Particulars Sizes
1 Base 1700
2 Post 1
3 Post 2
4 Post 3
5 Post 4
6 Post 5
7 Post 6
8 Hard Ware
9 Toggle
10 Stand
1

Sizes Qty Weight Rate Cost


400 25 1 78.60 250 19,650
9.20 250 2,300
9.80 250 2,450
6.70 250 1,675
8.40 250 2,100
6.40 250 1,600
6.30 250 1,575
45,000
20 24,000 480,000
1 85,000 85,000
10 5,000 50,000
10 4,000 40,000
80,000
80 2,500 200,000
8,000
5 55,000 275,000
200 250 50,000
134,435

1,478,785

Sizes Qty Weight Rate Cost


400 25 1 78.60 250 19,650
19.60 250 4,900
22.20 250 5,550
8.30 250 2,075
16.50 250 4,125
6.40 250 1,600
6.30 250 1,575
45,000
14 24,000 336,000
1 85,000 85,000
10 5,000 50,000
10 4,000 40,000
80,000
56 2,500 140,000
6,000
5 55,000 275,000
200 250 50,000
114,648

1,261,123
1,261,123
, 13, 8, 6, (7 studs) Parts.

Sizes Qty Weight Rate Cost


500 25 1 68.78 250 17,194
11.42 250 2,855
13.10 250 3,275
8.30 250 2,075
6.20 250 1,550
6.40 250 1,600
6.30 250 1,575
45,000
24 24,000 576,000
1 85,000 85,000
12 5,000 60,000
16 4,000 64,000
80,000
96 2,500 240,000
8,000
5 55,000 275,000
200 250 50,000
151,312

1,664,436
1,37, 36, Parts.

Sizes Qty Weight Rate Cost


750 25 1 110.53 250 27,633
14.67 250 3,668
13.50 250 3,375
9.70 250 2,425
6.80 250 1,700
8.20 250 2,050
5.60 250 1,400
45,000
12 24,000 288,000
1 85,000 85,000
12 5,000 60,000
16 4,000 64,000
80,000
48 2,500 120,000
8,000
5 55,000 275,000
200 250 50,000
111,725
1,228,975
SA 4 + 18, 6, 22, 18, 26, 33, 30, 32 Parts.

Sizes Qty Weight Rate Cost


600 25 1 70.74 250 17,685
12.85 250 3,213
11.60 250 2,900
9.87 250 2,468
8.85 250 2,213
8.20 250 2,050
6.70 250 1,675
45,000
24 24,000 576,000
1 85,000 85,000
12 5,000 60,000
16 4,000 64,000
80,000
96 2,500 240,000
8,000
5 55,000 275,000
200 250 50,000
151,520
1 105,000 105,000

1,771,723

Sizes Qty Weight Rate Cost


750 30 1 300.65 250 75,161
19.35 250 4,838
14.60 250 3,650
32.10 250 8,025
16.80 250 4,200
11.50 250 2,875
14.20 250 3,550
8,000
22 9,000 198,000
1 96,000 96,000

404,299
IMEC ENGINEERING SOLUTIONS (Pvt.) Ltd

Page # 01

Address: Plot no ST 1/11,Sector 15 Near Shan Chowrangi


Contact Person: Korangi Industrial Area, Karachi
Mr. Rashid Aziz Contact No: +92215121712-13
Customer Name: NTN No: 7439979-3
Canwin Associates Email: info@imec-solutions.com.pk
Date Ref. # 0019091920-00233

7/9/2021
S.No Work Scope Price / Unit Qty. Amount

Supply of Instrument Panel Manual Welding Jig Poka


Yoke System SA 1 - 38, 28, 31, 35, 21, 35, (3studs)
1
Parts. 3,048,071 1 3,048,071

Supply of Instrument Panel Manual Welding Jig Poka


Yoke System SA 2 - 20, 24, 23, 19, 17, 25, Parts.
2 2,553,209 1 2,553,209

Supply of Instrument Panel Manual Welding Jig Poka


Yoke System SA 3 - 1, 2, 3, 14, 15, 16, 13, 8, 6, (7
3
studs) Parts. 3,372,899 1 3,372,899

Supply of Instrument Panel Manual Welding Jig With


Poka Yoke System SA 4 - 9, 10, 11,37, 36, Parts.
4 2,438,630 1 2,438,630

Supply of Instrument Panel Robot Welding Jig With


Poka Yoke System SA1 + SA 2 + SA 3 + SA 4 + 18, 6,
5
22, 18, 26, 33, 30, 32 Parts. 3,604,070 1 3,604,070

Supply of Instrument Panel Checking Fixture.


6 1,055,710 1 1,055,710

Total Amount 16,072,588

Terms & Conditions.

(1) All prices are excluding Tax.

(2) Materials are mild steel & H.C.S.

(3) Delivery should be after 15 days of PO.

(4) This quotation is valid for a month.

Prepared By:
Syed Kazim Ali

Estimation Manager
IMEC ENGINEERING SOLUTIONS (Pvt.) Ltd

Page # 01

Address: Plot no ST 1/11,Sector 15 Near Shan Chowrangi


Contact Person: Korangi Industrial Area, Karachi
Mr. Rashid Aziz Contact No: +92215121712-13
Customer Name: NTN No: 7439979-3
Canwin Associates Email: info@imec-solutions.com.pk
Date Ref. # 0019091920-00233

7/9/2021
S.No Work Scope Price / Unit Qty. Amount

Supply of Instrument Panel Robot Welding Jig SA


1 - 38, 28, Parts.
1 1,016,158 1 1,016,158

Supply of Instrument Panel Robot Welding Jig SA


2 (SA 1), 33, 30, 32, 35, 35, 31, 21, (3studs),
2
Parts. 2,027,884 1 2,027,884

Supply of Instrument Panel Robot Welding Jig SA 3


- 20, 24, 23, 19, 17, 25, Parts.
3 1,628,327 1 1,628,327

Supply of Instrument Panel Robot Welding Jig SA 4


- 1, 2, 3, 14, 15, 16, Parts.
4 1,600,605 1 1,600,605

Supply of Instrument Panel Robot Welding Jig SA


5- 9, 10, 11,37, 36, Parts.
5 1,487,526 1 1,487,526

Supply of Instrument Panel Robot Welding Jig SA6


- (SA 4 ), 13, 8, 6, (7 studs), Parts.
6 1,369,661 1 1,369,661

Supply of Instrument Panel Robot Welding Jig SA2


+ SA 3 + SA 5 + SA 6 + 18, 6, 22, 18, 26, Parts.
7 - 1 -

0
8 - 1 -

Total Amount 9,130,160

Terms & Conditions.

(1) All prices are excluding Tax.

(2) Materials are mild steel & H.C.S.

(3) Delivery should be after 15 days of PO.

(4) This quotation is valid for a month.

Prepared By:
Syed Kazim Ali

Estimation Manager