PTW - Electrical Permit
PTW - Electrical Permit
PTW - Electrical Permit
Part 1: APPLICATION
Company Names of Workers Involved Date / Time
Name of Contractor’s
Authorized Person:
Location
Description of Work:
Part 2: ENDORSEMENT
Contractor’s Authorized Person Confirmation of Lock-out Practices Tick
1. I have referred to the electrical 1. All electrical points had been isolated and earthed.
installation layout plan. 2. All isolated points have been securely lock-out by Main Contractor &
2. I have identified the electrical points Contractors authorized person.
to be isolated, locked-out and tag-out. 3. All isolated points had been displayed with Danger! Do not Operate!
3. I have briefed all personnel involved MEP Contractors authorized person.
in the work on the Lock-out Procedure. 4. All locks are in good working conditions.
Name 5. All workmen worn required PPEs.
Designation 6. I have briefed all the workmen.
Signature Date 7. Other Safety checks / instructions.
Page 1 of 2
HSEBox.com
Section Health, Safety and Security
Status Controlled Copy
Electrical Work Permit Reference
Revision
Sheet
The keys to all locks shall only be held by the main contractor’s authorized person and works / repairs / inspection / cleaning / maintenance
performing MEP contractor’s authorized person.
The lock out method by authorized persons shall be in such a manner that no other person can energize the electrical equipment / system /
machinery / plant unless the lock is removed.
In case of casualty:
Do not touch victim unless you are sure that you will not be electrocuted.
Perform CPR if you are trained and it is safe to do so.
Keep victim attended at all times.
Report to the supervisor in-charge or through emergency intercom if he is not present immediately.
Clear all obstructions for effective emergency team access.
Barricade incident area.