Building Estimate Durganagar
Building Estimate Durganagar
GROUND FLOOR
SL
DESCRIPTION OF ITEM QUANTITY RATE AMOUNT
NO
1 Page- 1 , Item No. 2-a]
Earth work in excavation of foundation trenches or drains,
……………. out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm.
40.50 Cum @ Rs. 12047.00 / % Cum Rs. 4879 .00
2 Page- 33 , Item No. 1
Single brick flat soling of picked jhama bricks including
ramming and dressing bed to proper level and filling joints
with powdered earth or local sand.
Ground Floor 46.00 Sqm @ Rs. 342.00 / Sqm Rs. 15732 .00
3 Page- 33 , Item No. 4 (a)
Cement concrete with graded jhama khoa(30 mm.size)
excluding shuttering.
(a) 6:3:1 proportion
Ground Floor 4.75 Cum @ Rs. 5137.00 / Cum Rs. 24401 .00
4 Page- 69 , Item No. 22(a)
Brick work with 1st class bricks in cement mortar (6:1)
(a) In foundation and plinth 5.62 Cum @ Rs. 5254.00 / Cum Rs. 29527 .00
5 Page- 136 , Item No. 11
25mm. thick damp proof course with cement concrete with
stone chips (4:2:1) …………………………... double
chequered complete as directed (cost of water proofing
compound & polymer based paint to be paid separately).
18.24 Sq.m @ Rs. 579.00 / Sq.m Rs. 10561 .00
6 Page- 3 , Item No. 3
Earth work in filling in foundation trenches or plinth with
good earth, in layers not exceeding 150 mm. including
watering and ramming etc. layer by layer complete.
(Payment to be made on the basis of measurement of
(a) With quantity
finished earth obtained
of work)from excavation of foundation.
8.10 Cum @ Rs. 7831.00 / %Cum Rs. 634 .00
7 Page- 5 , Item No. 4(A)
Filling in foundation or plinth by silver sand in layers not
exceeding 150 mm. in…………………..cluding the cost of
supply of sand.
26.80 Cum @ Rs. 74726.00 / %Cum Rs. 20027 .00
8 Page- 79 , Item No. 44
1st class brick work of width 250 mm. with non-modular
bricks in cement sand mortar (1:6) as per technique
explained in specification and drawings.
(b) In superstructure
Ground Floor 28.46 Cum @ Rs. 5479.00 / Cum Rs. 155932 .00
9 Page- 61 , Item No. 12-a]
Hire and labour charges for shuttering with centreing and
necessary staging upto 4 m……………………...
completion of works. (upto roof of ground floor)
Ground Floor 64.28 Sqm @ Rs. 135.00 / Sqm Rs. 8678 .00
23 Page- 319 , Item No. 2(i)c
15 mm thick plastering with sand cement mortar (6:1).
Ground Floor
[i] Inside 202.64 Sqm @ Rs. 150.00 / Sqm Rs. 30396 .00
[ii] Outside 118.80 Sqm @ Rs. 150.00 / Sqm Rs. 17820 .00
FIRST FLOOR
1 Page- 79 , Item No. 44
1st class brick work of width 250 mm. with non-modular
bricks in cement sand mortar (1:6) as per technique
explained in specification and drawings.
(b) 1st Floor
48.20 Cum @ Rs. 5479.00 / Cum Rs. 264088 .00
2 Page- 73 , Item No. 29
125 mm. thick brick work with 1st class bricks in cement
mortar (4:1) in 1st Floor
50.18 Sqm @ Rs. 725.00 / Sqm Rs. 36381 .00
3 Page- 179 , Item No. 1-b]
Wood work in door and window ………………at the
contact surface of the frame.
(b) Sal : Siliguri.
0.5 Cum @ Rs. 98153.00 / Cum Rs. 49077 .00
4 Page- 189 , Item No. 18(a)
M.S. clamp for fixing door and window frame
………………………………. complete as per direction.
(a) 40mm. X 6mm. Above 250mm. Upto 350mm. Length.
MRIGANKA GHOSH
(DIPLOMA CIVIL ENGG.)
BERHAMPORE , MSD
PH- 9547625259
Compatibility Report for BUILDING ESTIMATE.xls
Run on 6/20/2015 17:47
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.
Some cells or styles in this workbook contain formatting that is not supported 20
by the selected file format. These formats will be converted to the closest
format available.