Job Safety Analysis

DATE 02/09/2022 JSA NO:-P&G/JSA/SE/17


VENDOR NAME SHWETA ENTERPRISE
PROJECT NAME PALITANA
PO No.
JOB DESCRIPTION GYPSUM PARTITION AND PAINTING WORK
JOB PARTICIPANTS SUSHIL KUMAR YADAV & RAMAN MISHRA
PREPARED BY SUSHIL KUMAR YADAV
Personal Protective Equipment Required or Recommended - Helmet, safety shoes, cut resistance hand
gloves reflective jacket, ear plug and safety goggles. Full body harness, Full Body Apron, Face shield

SEQUENCE OF STEP POTENTIAL HAZARDS RECOMMENDED SAFE PROCEDURE


 1. General  Unauthorized work  Permit- Ensure all work permits like, STA, and
Requirement. may be cause various
accident and property  Checklist has Work been verified and
damage authorized before performing the Task.

 Unawareness of the  JSA Sharing- JSA should be shared with all


safety practices May the staffs and workers who are involved in the
cause accident. same task.

 Absence of  The Supervisor/Engineer and safety person


Supervisor/Engineer should be always present at the site and
and Safety person instruct the workers.
may cause accident.
 The Safety person along with the Engineer
 Improper training of should give proper Induction training about
work may cause work and work related things before starting
personal injury and
the task..
Property Damage.

 The Safety person should daily instruct the


team member in the tool box meeting

1
regarding the risk Involved in the task
 Barricade the Work Area.
 Wear Required PPE(Helmet, Shoes, Goggles,
o Hand Gloves etc.

 2.Gypsum Partition  Fire Hazard  Refer to Fabrication (Hot Work) JSA for
Support fabrication
by Cutting& Drilling
Safe Recommendation During Hot
Ground and Height Work
 Ensure That work related safety
poster Required.
 Emergency Contact Details Should
Display at Work Place.

 Burn injuries  Refer to work at Height JSA for Safe


Recommendation During Height
 Electrical Shock  Refer to work at Height JSA for Safe
Physical Injuries Recommendation During Height
Due Edges Of
support
 Fall Hazard  Use Cut Resist Hand Gloves For
Protection Against Sharp edges

 All The accessible edges must be


Covered With Masking Tape or any
other Insulated Materials.
 3.Gypsum Board  Fall of Man OR  Refer to at Height JSA Safe
Fixing By Drilling Materials Recommendation During Height Work.
at Ground and
Height  Cut Hazard
 Dust Hazard  Use Nose Mask During Working With
Gypsum Board.
 Damage of Eyes
 4.Painting work  Slip / Trip & Fall  Use a sign Board Who Has Properly
by Painting Hazard indicat At Painting Surface To Prevent
Roller Or Trip and Fall Hazard
Painting Brush
 Do Not Store Excessive Painting Bucket
At Work Site and follow Proper
Housekeeping at work site

2
 Remove Unwanted Material From The
Work Place
 Fire Hazard  Should be Ensure That no any Hot
Work Likes Grainding , welding cutting
is progress from 30 feet to the job site

 If any Hot Work Required in Side the


task area Should be must keep a fire
watcher Cylender at the job site.

 Remove Combustible / Flammable


Material from work place before hot
work

 Dust/ Smoke  Use Nose mask at the time of painting


Hazard work.
 Eyes/Face injuries  Use face shield and Goggles for face
and eye Protection
 Slip/Trip& Fall  Do not store Excessive Paint Bucket at
Hazard work site & follow Proper
Housekeeping at work site
 5.Plaster work  Infection in Hands  Use Rubber hand gloves During Plaster
work
 Problem in eyes  Use Safety goggles During Plaster
Work
 6.Housekeeping  Slip/Trip& Fall  Follow The Housekeeping JSA for safe
after  Physical injuries Recommendation.
Completion of  Ensure that the engaged team must be
work wear proper PPE,s During the work

Safety in Charge Initiator (P&G)


(Contractor)

3
Engineer (Contractor) Approved by (P&G
Construction Safety