Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

MUHAMMAD 

NAVEED                                                               
                                                                                  

E‐Mail:  engr.naveedawan90@gmail.com 

CELL NO #   059 603 9440 (KSA) 

Iqama Transferable: YES 
QUALIFICATION: Bachelors of Science in Electrical Engineering

ELECTRICAL & INSTRUMENTATION ENGINEER   

Extensive experience in EPC Projects in term of Engineering | Procurement |Construction| Commissioning| Project 
Planning Estimation |Project Execution in Saudi Aramco projects & renewable energy Wind Power projects. 

Core Competencies

Project Management Project Execution Engineering  Procurement Project Inspection Project 


Reporting Testing & Commissioning  Project Invoices Punch List Closeouts  

PROFESSIONAL PROFILE

 Offering 8 years of enriched cross‐cultural experience as an Electrical and Instrumentation Engineer in Saudi 
Aramco Projects pipelines (Remote Headers, Valve Station, GGM, LSS, GCP, OPTF & Aramco buildings) and 
Renewable wind power projects and huge Oil and Gas production plants in Pakistan.  

 Develop and familiar with Aramco standards & drawings , Method Statements, Scope of work, BOQ, MTO , 
Preparation of Material Requisitions, raised TQ when required ,  review  contractual documents ,                     

 Execution of Electrical (LV and MV), Instrumentation, cathodic protection (Temporary and Permanent) & 
communications works   . Complete construction activities (erection of all electrical and field 
Instrumentation equipment’s and its associated cable laying and termination. Erection of OHPL power lines, 
stringing and tie in with existing line, CCTV, IVPS, Communication System (OSP & ISP). 

COMPANIES NAME:  

i. CHINA PETROLEUM PIPELINE ENGINEERING KSA 
ii. ARAKD ENGINEERING AND CONSTRUCTION KSA 
iii. DESCON ENGINEERING LIMITED PAK 

PROJECTS WORKED:  
 Saudi Aramco North Gas Compression Plants Pipelines NGCP HWYH LSS, HWGCP‐1, HWYH GGM, (HWYH LSS   
NORTH HRDH GGM, HDGCP (1 & 2), HWYH OSB REMOTE HEADERS & OPTF’S). 
  Mazalij and Abu Jifan Saudi Aramco pipeline project (Khurais Al crude increment project ‐300 MBCD 
 50 MW Metro Wind Power Project, 132/22KV Hybrid Grid Substation, N100 Wind Turbines Nordex. 
 50 MW Yunus Wind Power Project 132/22KV Hybrid Grid Substation, N100 Wind Turbines Nordex. 
 50 MW Gul Ahmed Wind Power project, 132/22KV Hybrid Grid Substation, N100 Wind Turbines Nordex. 
 MOL PAKISTAN OIL AND GAS CO. B.V (GPF and CPF Facilities) 
 

China Petroleum Pipeline Engineering Company | Saudi Aramco | NGCP Project 

February 2019‐ Present  

E&I ENGINEER 
 My job responsibilities was under the scope of all electrical , Instrumentation and telecom works in  , Remote Headers 
and valve stations (Total NOs 26) , OPTF (Total NOs 189) and 13.8 KV Overhead power Lines (OHPL) total Length 60 km 
, cathodic Protection (Temporary and Permanent) and Communication system (OSP & ISP) . 

 Submit daily report, one day look‐ahead plan, and 3‐Weekly look ahead schedules to management/client and attend 
meetings with procurement on material delivery schedule on weekly basis. 

 Making the Redlines drawing, as built drawing as per site condition meanwhile conduct meetings and get approval 
from Saudi Aramco. In case of deviation as per IFC, generate TQ (Technical Query) to design department. 

 As changes are approved, revised MR (Material Requisition) and follow up revised PO and update procurement to 
purchase the item on basis of new MR.  

 Attend weekly meeting with PMT of Saudi Aramco, develop strong co‐ordination with sub‐contractors, vendors and 
commissioning team with providing technical support to construction team. 

 Coordinate with operation department and permit issuer for Tie‐in (temporary shutdown of OHPL for modification of 
existing poles or replacement wooden pole for new tap‐off pole) & working in Aramco existing facilities. 

 Coordinate with engineering & procurement department in case of any technical issues for execution of work, SOW 
(scope of work) and preparing method statement and JSA and get approval from client. 

 Follow up with procurement department for pending material on daily basis for priority activities and coordinate with 
planning department for achieving milestone within time. 

 Installation/termination & Erection of Pad mounted transformer, Switch racks, power panel, lighting control panel, 
Dry type transformer, Power supply  to  Motor Operated  Valve  (MOV’s)  and  RTU  components inside the  remote 
headers and valve stations. 

 Installation of cable laying MV , LV and DC power cables as per drawing and ensure cable shall be direct buried or pre‐
cast duct bank along with warning tapes , cable marker and approved backfill material. 

 Follow up and make sure that site execution team perform Megger test of MV and LV cable before/after cable laying 
and HIPOT test for medium voltage cable and also make sure that testing equipment is calibrated. 

 Installation and energization of mounting pole terminal transformers and pad mounted transformer and before 
energization testing of transformer (Resistance test of all windings, Ratio and polarity test. 

 Installation/laying of grounding grid with its associated grounding cable, grounding rod and connection (thermo weld 
/clamp) and provide connection to transformer , switch‐rack , fence ,lighting poles and skid mounted equipment  
meanwhile perform ground resistance test. 

 Installation of area lighting, task lighting, security lighting (Solar Panel) and indoor lighting providing lux as per Aramco 
standards and also execute photocell control for outdoor lights. 

 Conduct complete survey and field marking of all types of overhead poles and make sure that new pole is at proper 
distance from existing facilities, transmission lines & underground cables. 

 Installation / erection of different types of overhead pole which includes Tangent riser pole , Dead end riser pole , 
double dead end riser pole , angle poles and terminal poles with complete accessories and modification of existing 
steel pole to New tap off pole and meanwhile stringing/pulling of conductor as per approved procedure. 
 Installation of communication cabinet, fibre patch panel, laying of FOC cable, splicing for foc cable, Installation of HDPE 
conduit and sub ducts.  

 Developed instrument datasheets, specifications, Instrument Loop Diagrams (ILD), Wiring diagrams, Instrument Hook‐
up Diagrams, Cable Routing Layout & Point and lines diagrams, Control Room Layout, Cable/JB schedules, Index, I/O 
lists, MTO. 

 Functional Tests of Pressure, Flow, Temperature, Level instruments, Analyzers, Control / On‐Off Valves, Fire& 
Gas Instruments 

 Installation of CCTV cameras, camera JB and its associated cable laying with termination. 

 Provide temporary cathodic protection & permanent cathodic protection for the protection of new and existing 
pipeline. 

 Installation of test station (3 pin & 1‐pin) after every KM intervals & bonding box (2T, 3T & 5T) should be done in 
accordance with IFC drawings. 

 For installation of ICCP (Impressed current cathodic protection) perform drilling up to 120 Meter by vertical drilling 
machine,  after  installing  UPVC  casing  and  perform  leak  test,  lowering  of  18  Anodes  (high  silicon  cast  iron)  with 
accessories. 

 Installation & termination/tagging of positive junction box, negative junction box and CP rectifier (20A/100VDC) 
with remote monitoring unit and laying of CP cable should be done in accordance with Saudi Aramco CP procedures. 

ARKAD Engineering and Construction CO. | Saudi Aramco | Mazalij Project 

Jan 2017 to Jan 2019 

Electrical Engineer   

 My responsibilities was related to all the electrical activities inside the valve stations  and remote headers , including 
OHPL activities and cathodic protection (Temporary and permanent ) 

 Installation of different types of overhead pole with complete accessories and execute stringing/pulling of conductor 
as per deadline and perform test during inspection. 

 Laying of 13.8KV medium voltage (MV) cable between the riser poles and pre‐cast duct bank, if crossing underground 
pipelines & supervise the MV cable splicing.  

 Erection  of  pole  &  pad  mounted  transformer,  Switchracks,  power  panel,  lighting  control  panel,  Dry  type 
transformer, area lighting poles, task lights and receptacle.  

 Grounding  for  equipment,  steel  platforms,  lighting  poles  and  fence  grounding  install  all  necessary  grounding 
connection & tie in to main grounding grid.  

 Laying of power cables, underground / on road crossing laying of cable via duct bank, ensuring the separation of 
power cable, instrument cable & communication cable and providing the necessary cable route marker/post marker 
& standards sign as per Saudi Aramco standard. 

 Installation , pre‐commissioning  & commissioning of  pad mounted transformer , pole mounted transformer and 
dry type transformer 300KVA   , 34.5KV /480V 3Ph to feed switch rack , MOV receptacles circuits ,power  panel & 
lighting contractor panel for new task lighting. 

 Supply and installation of Switch racks inside valve stations to feed motor operated valve, corrosion inhibitor skids 
& new power panel for area lighting, task lighting & power receptacles. 
 The installation /soaking of galvanic anodes (magnesium) & cad welding its respective cable to crude pipeline and 
measure the pipe to soil potential with reference to Cu/CuSO4 reference electrode. 

 Perform the holiday testing (rating up to 18KV) to ensure the cable (HMWPE) is not damaged before lowering of 
anode. 

 For installation of ICCP (Impressed current cathodic protection) perform drilling up to 120 Meter by vertical drilling 
machine, after installing UPVC casing and perform leak test, lowering of 18 Anodes(HSCI) with accessories. 

 The backfilling of coke breeze in borehole without water mixing and check the resistance of each anode as the coke 
breeze is being installed. 

 Installation  &  termination/tagging  of  positive  junction  box  (20T),  negative  junction  box  (5T)  and  CP  rectifier 
(20A/100VDC) & connect the Ethernet cable from CPMS to patch panel for monitoring and laying of CP cable should 
be done in accordance with Saudi Aramco CP procedures. 

 Installation of test station (3 pin & 1‐pin) after every KM intervals & bonding box along pipelines and inside the valve 
stations.

DESCON ENGINEREING LIMITED | 150 MW WIND POWER PROJECTS |GRID STATIONS 

Nov 2014 to Dec 2016  

QC Engineer –Electrical   

 Working on a turnkey project of 150 MW Wind Power Project includes Installation, testing and 
commissioning 132/22KV Hybrid Grid Substation (Alstom) & 40 Wind Turbines provide by Nordex. 
 Ensure and review all Electrical technical documentation is in accordance with the project requirement 
for quality inspection plan (QIP), Budget of quantity BOQ, work order (WO), Division of responsibilities 
(DOR), standards and codes. 
 Inspection of Electrification in which including loop testing and lighting circuit verification , related cable 
pulling & termination in Distribution board , allocation of lighting fixture & power socket as per 
approved drawing and ensuring approved material is used . 
 Supervision of cable termination of rotor and stator at wind turbine nacelle side and meanwhile power 
cables jointing at Top, M2 & M1 section of turbine and termination of all power cable at converter. 
Turbines are provided by NORDEX. 
 Cable laying of MV cable from turbine to turbine & substation. & its meggering (IR) & HIPOT test of 
power cables. All the results should compliance with FAT reports. 
 Installation & Testing of Power Transformers, Grounding transformers, Surge arrestors, current 
transformer , voltage transformer, , Earthing mesh and Lightning protection system. 
 Conduct physical inspection of turbine step up transformer over current & earth fault relay. 
 Megger test of Instrument Transformer from primary to ground, secondary to ground & primary to 
secondary windings including turn ratio and polarity test. 
 Inspection of earthing to verify grounding connection, continuity & ground resistance measurement. 
 Inspection of power transformer includes verification of ratio & functional test for buchloz relay, 
thermal relay, and oil level and temperature indicators for transformer. 
 Perform field inspection services of Electrical related works at site. Attend daily applications for 
inspection as per the Inspection and Tests procedures and the quality plans and systematically report 
inspection results. 
 Ability to make quality inspection plan, method statement & raise the request for inspection, 
meanwhile generate NCR & FQA when required. Inspection of Incoming material & keeping record 
update. 
 Good understanding of Layout Drawings, schematic drawings, SLD, Control and interlocking diagrams, 
Protection and Logic diagrams. 

 
DESCON ENGINEREING LIMITED | MOL PAKISTAN OIL/GAS PROJECT |GPF FACILITIES 

Jan 2013 to April 2014 

             Assistant Engineer‐Electrical   

 Good understanding about all drawing SLD single Line diagram, power layout, lighting layout, grounding 
layout and schematic diagram etc. 
 Inspection for Laying of power cable & control cable in trench or cable tray & termination of cable. 
 Installation & Inspection of Cable tray (Ladder & perforated) i.e. ensure that cable tray routing, hot dip 
galvanized condition & approved vendor material 
 Perform and ensure  continuity test and Megger (IR) test of power cables, control cables & motor 
winding and record the results for pre‐commissioning  
 Perform the  HI‐Potential  Test of power HV Cables & measures the leakage current  
 Installation Inspection & Testing of Bus bar Installation. 
 Erection & commissioning of three phase motors and insulation resistance of winding) & Solo Run Test. 
Conduct Motor No Load test and Full Load test.  
 Installation/Inspection/ Testing of Motor. (Temperature, Vibration, Rotation & Bearing sound). 
 Perform transformer turn ratio (TTR) of Power transformer and Dry type transformer. 
 Familiar with hazardous area classification & IP ratings, QA/QC, QIP’s, MTC, check lists Method 
Statement, Punch list close out. 
 Installation, Commissioning, testing of power generators driven by WAUKESHA gas engine model # 
G3516C,(2.5MW,415V,50Hz) and diesel Generator of Model DG‐3406 series by caterpillar 
(1020KW,415V,50Hz). 
 Installation, Commissioning, testing and Maintenance of A.C UPS 32 KW and DC UPS 5.5 KW by GUTOR 
Electric Ltd Switzerland. 

Training and Certifications  
 Registered in Saudi Engineering Council SEC
 Registered in Pakistan Engineering Council PEC
 Degree Attested by Higher Education Commission HEC 
 Attend  training of  Project Management professional PMP  
 Safe electrical lock out, tag out and try procedures 
 Skylotec Rescue & Climbing Training from International organization (MIRA) 
 Successfully completed Hazard Recognition & Control  
 AutoCAD
 Primavera P6 Version 17 ( From Primavera Institute) 

QUALIFICATION

  Bachelors of Science in Electrical Engineering from HITEC University Taxila (2008‐2012).

PERSONAL DOSSIER

Nationality:  Pakistani              Date of Birth:  3rd, January 1990     Residential Address:  SAUDI ARABIA 

                                                   

IQAMA Status:   Transferable     Reference: It will be provided on Demand.

                                         

You might also like