Team Work

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

JOB SCHEDULE SERVICE CREW 2022

1. ARSHAD-a) Daily morning job card open crew member,


divide job according below list wise.
b) Documentation Control –
1. Team Job card daily maintain.
2. Working job card maintain
2. All chart attested finally.
3. Maintain REPORT file.
c) Check final testing properly.
d) Field visit any time according job.
e) Submit daily job report WCTL.
f) Work/learn on major items assy/diassy.
g) Material (kit) issue warehouse. Make MR.
h) Reporting WCTL.

NOTE: Any Accumulator unit in UCTC facility for


repair/service, working on it for knowledge.
MANPOWER USE

2. ANISH—a) Field job.(Any time call client)


b) Yard-Do Uti/Mpi/hydro/Assembly/Disassembly
material & Group running job
document handle .After complete job submit
report reporting engineer(Arshad).
c) SS tag serial number graving/tagging.
d) Assembly/Disassembly secondary material.

3. JAMIL- a) Field job.(Any time call client)


b) Yard-Do Uti/Mpi/hydro/Assembly/Disassembly
material & Group running job
document handle .After complete job submit
report reporting engineer(Arshad).
c) SS tag serial number graving/tagging.
d) Assembly/Disassembly secondary material.

4. ARUN- a) Assembly/Disassembly all material/(unit).


b) Field/Yard bop control unit job.
c) Yard-Do Uti/Mpi/hydro/Assembly/Disassembly
material & Group running job
document handle .After complete job submit
report reporting engineer(Arshad).
d) Tag graving.
e) Field job regarding Accumulator unit.

5.RAM- a) Assembly/Disassembly all material/Unit.


b) Material hydrotest before/after assembly.
c) Field visit bop control unit job/any.
e) Disassy primary/secondary major material(unit).
f) Working on Accumulator unit.
g) Reporting engineer(Arshad).

6.AMIT- a) Assembly/Disassembly all material/Unit.


b) Material hydrotest before/after assembly.
c) Field visit bop control unit job/any.
e) Disassy primary/secondary major material(unit).
f) Working on Accumulator unit.
g) Reporting engineer(Arshad).

7. RAJU- a) Assembly/Disassembly all flow control.


b) Material hydrotest before/after assembly.
c) Field visit
d) Uti/mpi/hydro.
d) Disassemble all type dampner model.
e) Reporting engineer(Arshad).

8. BALRAJU- a) Assembly/Disassembly all flow control.


b) Material hydrotest before/after assembly
(under supervision)
c) Field visit
d) Cleaning all disassembly materials.
e) Reporting engineer(Arshad).
9.SUNIL- a) Assembly/Disassembly all flow control.
b) Material hydrotest before/after assembly
(under supervision)
c) Field visit
d) Cleaning all disassembly materials.
e) Reporting engineer(Arshad).
10.MOMIN- a) Assembly/Disassembly all flow control.
b) Material hydrotest before/after assembly
(under supervision)
c) Field visit
d) Cleaning all disassembly materials.
e) Reporting engineer(Arshad).

NOTE: WORKSHOP 3 CLEANING


1. OFFICE:-- ANISH/JAMIL
2. WORKSHOP 3/WASHBAY-SUNIL/MOMIN/RAJU/BALRAJU
3. TEST BAY ROOM - AROON/AMIT
4. TOOLS ROOM ARRANGMENT/CLEAN- AMIT/RAM

Well control team leader

You might also like