CHECKERS BRIEF

SHOP DRG CHECK LIST - DRAINAGE


Project Title : Department: Date:

Drawn by Checked by Drawing: Revision:

S.NO DESCRIPTION REV YES NO NA DRG NO/REMARK


1 BASE DRG / DOCUMENT USED
1.1 Latest Issued For Construction(IFC) layout

1.2 Latest Artictectural used.

1.3 Latest Structural used.

1.4 Latest ID drg used

1.5 Latest RCP drg used

1.6 Latest Drainage schematic used

1.7 Coordinated with latest kitchen drawings

1.8 Coordinated with latest swimming pool drawings

2 LAYOUT/DETAILS
Drainage equipments shown on layout are mentioned in equipment schedule
2.1
with proper type,size and capacity as per Material submittal
Check whether all piping are placed out side electrical rooms, telephone
2.2 rooms and LV rooms
2.3 Suitable cleanouts(CO,WCO) are provided in change of direction
Pipe slope & level marked on the drg as per Standards.Note to be added to
2.4
clear the reference point(From FFl or SSL)
2.5 FD's,FCO's etc. cooridianted with tiling/ID/Furniture drgs.

2.6 Flow direction line arrow


Condensate drain provision is shown coordinating location & plinths
2.7
as per HVAC drawings
2.8 Co ordinated with schematics

2.9 Layout co-ordinated with other MEP services

2.10 Suitable sections are provided clear the services

2.11 Schedule for all the components in the drg

2.12 Legend provided for items used in the drg.

2.13 Support for pipes as per approved Detail drg

2.14 Written text clearly readable & not written over lines

2.15 If pipe length more than 15m or as per spec, CO provided.

2.16 If drg is revised, revisions are clouded with Rev No.


If the sections are shown in other sheet, reference drg no., shown in the
2.17
section mark
Maintain atleast 50mm distance between pipes and 150mm distance between
2.18
other services.(Gas pipe)
Suitable vent provided as per Schematic, Pipe routing / connection / sizes
2.19
verified with Draiange schematic / riser diagram.
2.20 Coordinated with Fixtures.
Risers coordinated with above & below floors - Riser numbers shown in the
2.21 plan layouts

Additional Items

Draughtsman (Drawn by) Engineer (Checked by) Co-ordinator (Approved by)

Issue Purpose: