Long Term Movement calculatiom

For the determination of deflection during the period


of track slab construction to 100years life span,
simplified line model in sofistik is considered. In
model, one modified W9 beam for three span length
(15m-20m-15m) is resting over temporary supports
2.55m from diaphragm c/l behaving as simply
supported until diaphragm cast and gained strength on
41st day from start of construction. The structural
model behaves as continous with diaphragm cast over
which super imposed load is applied and the
deflections are calculated at different stages including
creep and shrinkage effects.

20m SPAN
No. of DayConstruction stage Vertical Deflection, (mm)
3 Beam cast -3.4
PT applied 13.9

creep and shrinkage


25 at 28th day 1.84
Weight of Deck -2.84

creep and shrinkage


3 at 31st day -0.59
Deck cast 0.0264

creep and shrinkage


10 at 41st day 0.383
Diaphragm cast 0.0003

creep and shrinkage


84 at 125th day -0.773
Civil SDL -1.34

creep and shrinkage


180 at 305th day -0.993
Track SDL -0.315

creep and shrinkage


43800 at 100years -1.18

For 20m span


15m SPAN
No. of DayConstruction stage Vertical Deflection, (mm)
3 Beam cast -0.713
PT applied 4.9

creep and shrinkage


25 at 28th day 1.46
Weight of Deck -0.598

creep and shrinkage


3 at 31st day -0.106
Deck cast 0.0238

creep and shrinkage


10 at 41st day 0.337
Diaphragm cast 0.0003
creep and shrinkage
84 at 125th day 0.389
Civil SDL -0.62

creep and shrinkage


180 at 305th day 0.155
Track SDL -0.145

creep and shrinkage


43800 at 100years 0.288