Professional Documents
Culture Documents
05 - Sinamics STARTER - en
05 - Sinamics STARTER - en
Basic
commissioning
Adaptation and
optimization
Data
backup
Diagnostics
during servicing
STARTER work areas
Overview
Toolbars
Project navigator
Work area
Detail view
STARTER work areas
Project structure
Parameter number
can be viewed in
tooltip
Link to next
function diagram
Signal
interconnections
STARTER work areas
Parameter list / Expert list
STARTER work areas
Drive control panel
6. Start motion
Steps in commissioning sequence
Create a project
with wizard
Steps in commissioning sequence
Insert a drive unit
Steps in commissioning sequence
Configure a drive unit
Control structure
Command/setpoint source
Drive setting
Motor type
Motor data*
Motor encoder*
Drive functions
Important parameters
Back up to the drive EEPROM and to the hard disk of the PG/PC
Motor identification
Motor identification
USB
• USB available on every PC/PG
• Possible with modules:
CU2___-2____
PROFIBUS DP
• Available on every SIMATIC PG
• With PC: Plug-in card required
& • Possible with modules:
CU2___-__DP__
PROFINET
• Ethernet available on every PC/PG
• Possible with modules:
CU2___-__PN__
Online connection
Access point
2.
1.
Automation
network
3.
Point-to-point
Online connection
Set PG/PC interface