ALUMINUM HANDRAIL Form No. : 0 Rev. No. : 1 of 1 SUBCONTRACTOR CONTRACTOR Page :
Section of Work: ARCHITECTURAL Location:
Level: Checked by Checked by STAGE ITEM CONSULTAN DATE S/C CONT. T Sub-Contractor/ - Check Sub-contractor / Supplier approval. Sup Approval Material - Check Material approval. Approval - Check approved profiles Shop drawing - Check shop drawing. Elevations details Approval and fixations and is approved by the consultant Incoming - Check and ensure that all delivered material materials conform as approved material inspection & submittal. protection - Check if the profiles has protective tape for protection Mock up - Verify if the materials used for mock up approval are the approved materials - Check if mock up is approved Preparation - Check the measurements from actual structures and verify prior to fabrication In process - Check all alignment. Anchoring and inspection fixation. - Check all accessories are fixed - Check connection joints - Check slope and alignment - Check the height of the handrail from FFL. It should be 1.10meter /as per approved shop drawing. - Checks the surfaces of handrail are free of scratch. - Check the passage clearance as required by Civil Defense requirements Final Inspection/ - Before installation of aluminum, remove Cleaning protective coverings thoroughly clean and polish metal - When work or building is completed, clean the area. For S/C QA/QC: Date: For CONTRACTOR QA/QC: Date For CONSULTANT Rep. Date:
Set The Action! Creating Backgrounds For Compelling Storytelling - Creating Backgrounds For Compelling Storytelling in Animation, Comics, and Games (PDFDrive)