PROJECT NAME

` FM-5999-026
Form No. :
0
Rev. No. :
SUBCONTRACTOR CONTRACTOR  1 of 1
Page :

Section of Work: ARCHITECTURAL Location:


Level:
Checked by Checked by
STAGE ITEM DATE
CONSULTAN
S/C CONT.
T
Sub-Contractor/ - Check Sub-contractor / Supplier approval.
Sup Approval
Material Approval - Check Material approval.
- Check approved profiles and glass automatic
accessories
Shop drawing - Check shop drawing. Elevations details and
Approval fixations and is approved by the consultant

Incoming material - Check and ensure that all delivered materials


inspection & conform as approved material submittal.
protection - Check and ensure that all delivered Glass is
stamped as tempered, and free of distortion or
free of scratch.
- Check if the profiles have protective tape for
protection.
Mock up approval - Verify if the materials used for mock up are the
approved materials
- Check if mock up is approved
Preparation - Check the measurements from actual
structures and verify prior to fabrication
- Maintain MEP clearance for electrical work.
In process - Check all alignment. Anchoring and fixation.
inspection - Check all accessories are fixed
- Check color, paint quality, weather strip and
other accessories.
- Check if machines are working properly

Final Inspection/ - Joint to be filled by approved sealant.


Cleaning - Before installation of aluminum, remove
protective coverings thoroughly clean and
polish metal
- When work or building is completed, clean
metal and glass
- Joints to be filled by approved sealant.
- Put required lubricants for machines
For S/C QA/QC: Date: For CONTRACTOR QA/QC: Date For CONSULTANT Rep. Date:

Name: Sign: Name: Sign Name Sign: