KINETIC BUILDERS SDN HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK

BHD CONTROL (HIRARC)


Activities: Pile Cap Date: 19 Feb 2022 Rev: 00

Risk
Assessment

Job Sequence Hazard Existing / Current Recommended Control

Likelihood
No. Effect PIC

Residual
Severity
/ Steps Identification Control Measures Legal Measures

Risk
1. Mobilize Poor Slip, trip and NIL FMA 3 2 6 Administrative controls  Project
Materials materials fall (BOWEC  Brief the workers before starting the Manager
arrangement 1986) job. (Toolbox briefing)  Site
 Mobilize materials at save zone. Engineer
OSHA  Ensure walkway is free from  SSS
ACT 1994 obstruction.

2. Mobilization of Heavy Bodily Injury NIL FMA 3 2 6 Administrative controls  Project


machinery vehicle (BOWEC  Site personnel to control the Manager
movement 1986) surrounding activities with using  Site
whistle and flag.  Engineer
OSHA  Engage experience operator
(Hit by ACT 1994
 SSS
machinery)  Supervise by supervisor
 Barricade the area put signage.

3. Excavated of Hit by Fatal Proper platform to FMA 3 4 12 Administrative controls  Project


pile cap excavator park excavator (BOWEC  Brief the workers before starting the Manager
Body injury 1986) job. (Toolbox briefing)  Site
 Mobilize materials at save zone. Engineer
OSHA  Apply permit to work  SSS
ACT 1994
KINETIC BUILDERS SDN HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK
BHD CONTROL (HIRARC)
Activities: Pile Cap Date: 19 Feb 2022 Rev: 00

Risk
Assessment

Job Sequence Hazard Existing / Current Recommended Control

Likelihood
No. Effect PIC

Residual
Severity
/ Steps Identification Control Measures Legal Measures

Risk
3. Cutting of pile Hit by sharp Major injury Cutter pile in good FMA 3 4 12 Administrative controls  Project
cutter of pile condition (BOWEC  Site personnel to control the Manager
Fatal 1986) surrounding activities with using  Site
Hit by whistle and flag.  Engineer
OSHA  Engage experience operator
unwanted ACT 1994
 SSS
pile  Supervise by supervisor
 Barricade the area put signage.

4.. Install of rebar Slip and fall Major injury Provided Proper FMA 3 3 9 Administrative controls  Project
Access (BOWEC  Provide temporary walkway Manager
1986)  Supervise by supervisor  Site Engineer
Wear proper PPE  Barricade the area put signage.  SSS
OSHA
ACT 1994

Install of Slip and fall Bodily injury Provided proper FMA 3 3 9 Administrative controls  Project
4. formwork access (BOWE  Ensure workers are well trained. Manager
Falling of C 1986)  Workers to be briefed before start  Site Engineer
timber Wear proper PPE work.  SSS
OSHA  Supervisor to monitor work.
ACT .
1994
KINETIC BUILDERS SDN HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK
BHD CONTROL (HIRARC)
Activities: Pile Cap Date: 19 Feb 2022 Rev: 00

5. Pouring Hit by Bodily injury Maintain proper FMA 3 4 12 Administrative controls  Project
concrete concrete access (BOWE Manager
bucket C 1986)  Provided competent signal man to  Site Engineer
control the concrete bucket  SSS
Struck by OSHA  Check concrete bucket before use
concrete ACT  Workers to be briefed before start
bucket 1994 work
 Supervisor to monitor work
6. Dismantle Hit by sharp Major injury  Proper stacking of FMA 3 3 9  Workers to be briefed before start  Project
formwork nail timber (BOWE dismantling form-work Manager
C 1986)  Supervisor to monitor work  Site Engineer
 SSS
OSHA
ACT
1994
KINETIC BUILDERS SDN HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK
BHD CONTROL (HIRARC)
Activities: Pile Cap Date: 19 Feb 2022 Rev: 00
7. Housekeeping Sharp object Slip and fall  Proper housekeeping FMA 3 1 3 Administrative controls  Project
to keep material in (BOWE  Workers to be briefed before start Manager
good arrangement.
Bodily injury  Workers to be
C 1986) work.  Site Engineer
briefed before start  Supervisor to monitor work  SSS
work. OSHA
 Wear safety shoes ACT
 Wear cotton gloves 1994
when handling with
sharp object.

Scattered Proper housekeeping Administrative controls


Slip and fall  FMA 3 1 3  Project
object and to keep material in  Workers to be briefed before start
(BOWE Manager
obstruction Bodily injury
good arrangement.
C 1986) work.
 Workers to be
briefed before start Supervisor to monitor work  Site
work. OSHA Engineer
 Wear safety shoes ACT
 Wear cotton gloves 1994
when handling with
 SSS
sharp object.