Professional Documents
Culture Documents
Design of Bridges at Ch. 7+780 and Ch. 10+600 - 207
Design of Bridges at Ch. 7+780 and Ch. 10+600 - 207
fcm = 45 Mpa
t = 25550 days
to = 90 days
RH = Relative humidity
= 45 %
ho = 1046.85 mm
0.7
α1 = [ 43.75 / fcm ] = 0.98047
0.2
α2 = [ 43.75 / fcm ] = 0.99438
φRH = 1.54167
φo = 1.68626
18
βH = Min 1.5 [ 1+ (0.012 RH) ] ho +250 for fcm ≤ 35 Mpa
1500
βH = 1479.02