Date M10 M15 M30 M35 Particulars

21-Sep-22 7 Retaining wall Raft PCC, Grid A(5-8)


22-Sep-22 5 Retaining wall Raft PCC, Grid H(3-5)
23-Sep-22 4.5 Retaining wall Raft PCC, Grid H-3
24-Sep-22
25-Sep-22
26-Sep-22 5 Retaining wall Raft PCC, Grid (E-F) near 1
27-Sep-22
28-Sep-22
29-Sep-22

30-Sep-22
3.5 Retaining wall Raft PCC, Grid (5-9) near A
1-Oct-22
2-Oct-22
3-Oct-22
4-Oct-22
5-Oct-22
6-Oct-22
7-Oct-22
8-Oct-22
9-Oct-22
10-Oct-22
11-Oct-22 3 Footing PCC C60
12-Oct-22 5.5 Footing PCC C5, C17
13-Oct-22
14-Oct-22
15-Oct-22
16-Oct-22
17-Oct-22
18-Oct-22 3 Footing PCC C15(62), C16(110)
19-Oct-22

20-Oct-22 Footing Plum PCC C39(180), C40(168),


3.5 C62(430)
21-Oct-22 2.5 Footing PCC C39, C40, C62
22-Oct-22
23-Oct-22
24-Oct-22
25-Oct-22
26-Oct-22
27-Oct-22
28-Oct-22

29-Oct-22 Liftpit 115 Plum Concrete 30mm +Retaining


8.5 wall PCC (E-D)80mm
30-Oct-22 Liftpit 115 Plum Concrete +Retaining wall
9.5 PCC (E-D)
31-Oct-22 2
1-Nov-22 1.5 5
2-Nov-22
3-Nov-22 20 C39,C40 & C62
4-Nov-22 6 9.5 PCC C55,56 & 57, Footing C6
5-Nov-22
6-Nov-22
7-Nov-22
8-Nov-22
9-Nov-22
10-Nov-22
11-Nov-22
12-Nov-22
13-Nov-22
14-Nov-22
15-Nov-22
16-Nov-22
17-Nov-22
18-Nov-22
19-Nov-22
20-Nov-22
21-Nov-22
22-Nov-22
23-Nov-22
24-Nov-22
25-Nov-22
26-Nov-22
27-Nov-22
28-Nov-22
29-Nov-22
30-Nov-22

13.50 61.50 20.00


PCC PLUM
100
100
100

100 25

100 40

100 180
100 129

100 86

100
100
BOQ No Description Unit L B D
"1 . Fly ash (not more than 20% of cement content) can be used in concrete as per mix design. 2.
Design Mix for RCC to be approved by consultant.
3. Arrangement for & carrying out lowering, lifting, shifting & carting awaydebris inclusive of required
permission." Providing and laying of ready mix concrete for PCC (M15) as volume grading of minimum thk
100mm using crushed sand, 20mm and down size coarse aggregate, fly ash, admixture, plasticizer etc. at all
6 locations & levels wherever specified including base preparation, compaction, levelling, all leads & lifts, rough
finishing of the top surface, curing and shuttering if necessary etc. complete all as per drawings, specifications
and as directed. For STP, UGWT, Entrance gate, Compound wall Location.

Grid A' (8-7) Cum 8.4 2.4 0.1


Grid A' (7-6) Cum 8.4 2.4 0.1
Grid A' (6-5) Cum 8.4 2.3 0.1
Grid A' (5-4) Cum 8.15 2.3 0.1
Grid H' (3-3) Cum 6.715 2.3 0.1
Grid H (3-4) Cum 8.4 2.3 0.1
Grid H (4-5) Cum 8.15 2.3 0.1
Quantity
n. 2.

required
minimum thk
ticizer etc. at all
eads & lifts, rough
ngs, specifications

2.02
2.02
1.93
1.87
1.54
1.93
1.87

13.19
Labour Report
Fitter + Carpenter + Mason +
Unskilled
Helper Helper Helper
4-Nov-22 16 12 4 14
5-Nov-22

Concrete Details

M10 M15 M30 M35 Total


Upto
Yesterday 13.5 55.5 20 89

Planning
Today 0 0 0 0