The document contains a rubric to evaluate a floor plan project across several criteria: neatness, design layout, accuracy of conversions, completion, and timeliness. The rubric assigns a score from 1 to 4 for each criterion, with 1 being the lowest score meaning disorderly, inaccurate, incomplete, and late, and 4 being the highest score meaning neat, well-designed, accurately converted, fully complete, and on time.
The document contains a rubric to evaluate a floor plan project across several criteria: neatness, design layout, accuracy of conversions, completion, and timeliness. The rubric assigns a score from 1 to 4 for each criterion, with 1 being the lowest score meaning disorderly, inaccurate, incomplete, and late, and 4 being the highest score meaning neat, well-designed, accurately converted, fully complete, and on time.
The document contains a rubric to evaluate a floor plan project across several criteria: neatness, design layout, accuracy of conversions, completion, and timeliness. The rubric assigns a score from 1 to 4 for each criterion, with 1 being the lowest score meaning disorderly, inaccurate, incomplete, and late, and 4 being the highest score meaning neat, well-designed, accurately converted, fully complete, and on time.
Neatness The project is The project is The project is The project is
neat and neat but with few neat but with disorderly, with organized. crease, smudges several crease, many crease, and tears. smudges and smudges and tears tears Design Design layout Design layout is Design layout is Design layout is compliments neat and easy to somewhat carelessly content. read. disorganized. planned. Accuracy of All the Most of the Some of the Few conversions conversion conversions are conversions are conversions are are correct. correct. correct. correct. Completion The project is Most parts of the Some of the parts Almost all parts of complete from project is of the project is the subject is not sketch to complete. complete. complete. measurement. Timeliness The project was The project was 1 The project was 2 The project was 3 received on the day late. days late. or more than days due date. late.