INDUMOTI CIVIL AND MECHANICAL PVT. LTD.

To, Bill Name : Civil work of National


Highway
JK BUILDERS & DEVELOPERS
Date: 26/09/2022
1st Floor, Yashodhan, Thane
PAN No: AAECI7070F
(West), Mumbai, Maharashtra -
GSTIN: 19AAECI7070F1ZH
400601
Working site:- JK
GSTIN : BULIDERS/BURDWAN NH
SI APPROVED
NO DESCRIPTION OF WORK UNIT QUANTITY RATE AMOUNT
Labour charges for laying in situ concrete for levelling course
of trap/granite/quartz metal for foundation of RCC Drain
including bailing out water manually, providing and fixing
form work in line level, vibrating and compacting, de-
shuttering after stripping curing period, finishing, cleaning,
including covering newly laid concrete by gunny bag, plastic
1 or tarpaulin, arrangement of water for curing etc. CUM 44.115 540 23822.1
Labour charges for laying in situ concrete RCC for
Raft/Bottom Slab of RCC Drain including, providing and fixing
form work in line level, vibrating and compacting, de-
shuttering after stripping curing period, finishing, cleaning,
including covering newly laid concrete by gunny bag, plastic
2 or tarpaulin, arrangement of water for curing etc. CUM 74.55 900 67095
Labour charges for laying in situ concrete RCC for Slab wall
and Top slab of RCC Drain including, providing and fixing
form work in line level, vibrating and compacting, de-
shuttering after stripping curing period, finishing, cleaning,
including covering newly laid concrete by gunny bag, plastic
3 or tarpaulin, arrangement of water for curing etc. CUM 116.07 1600 185712
Labour charges for cutting, bending and placing in position
HYSD reinforcement at all levels as per details drawings for
4 RCC works including providing binding wire MT 10.193 6000 61158
5 Supply Labour (For Various Works - Singed by Site in Charge)
I. Mistri NOS 67 700 46900
II. Labours NOS 110 500 55000

IN WORDS TOTAL = 439687.1


FOUR LAKHS THIRTY NINE THOUSAND SIX HUNDRED
EIGHTY SEVEN RUPEES ONLY ROUND OFF 439687

Regd. Address: Barjora (rajarbandh), Bankura, Pin – 722202, State: West Bengal
Address: Raharaboni, Ghutgoria, Barjora, Pin – 722202, State: West Bengal
Mobile: 9732073207 / 9933090670, Email: indumoticivilmechanical@gmail.com / bcbajpayee89@gmail.com
DRAINAGE CONCRETE WORK DETAILS
SI NO CHAINAGE NO DESCRIPTION OF WORK LENGTH WIDTH DEPTH QUANTITY APPROVED RATE UNIT

1 562+700 TO 562+876 PCC 176 1.7 0.075 22.44 540 CUM


562+940 TO 563+110 PCC 170 1.7 0.075 21.675 540 CUM

2 562+700 TO 562+833 RCC RAFT 133 1.5 0.15 29.925 900 CUM
562+940 TO 563+110 RCC RAFT 170 1.5 0.175 44.625 900 CUM

3 562+700 TO 56+2+833 INNER WALL 133 0.15 0.9 17.955 1600 CUM
OUTER WALL 133 0.15 0.9 17.955 1600 CUM

4 562+940 TO 56+2+950 INNER WALL 10 0.175 1.1 1.925 1600 CUM


OUTER WALL 10 0.175 1.22 2.135 1600 CUM

5 562+950 TO 562+960 INNER WALL 10 0.175 1.1 1.925 1600 CUM


OUTER WALL 10 0.175 1.22 2.135 1600 CUM

6 562+960 TO 562+970 INNER WALL 10 0.175 1.553 2.71775 1600 CUM


OUTER WALL 10 0.175 1.22 2.135 1600 CUM

7 562+970 TO 562+980 INNER WALL 10 0.175 1.524 2.667 1600 CUM


OUTER WALL 10 0.175 1.22 2.135 1600 CUM

8 562+980 TO 562+990 INNER WALL 10 0.175 1.498 2.6215 1600 CUM


OUTER WALL 10 0.175 1.22 2.135 1600 CUM

9 562+990 TO 563 INNER WALL 10 0.175 1.479 2.58825 1600 CUM


OUTER WALL 10 0.175 1.22 2.135 1600 CUM

10 562+1000 TO 563+010 INNER WALL 10 0.175 1.456 2.548 1600 CUM


OUTER WALL 10 0.175 1.22 2.135 1600 CUM

11 563+010 TO 563+020 INNER WALL 10 0.175 1.439 2.51825 1600 CUM


OUTER WALL 10 0.175 1.22 2.135 1600 CUM

12 563+020 TO 563+030 INNER WALL 10 0.175 1.425 2.49375 1600 CUM


OUTER WALL 10 0.175 1.22 2.135 1600 CUM

13 563+030 TO 563+040 INNER WALL 10 0.175 1.415 2.47625 1600 CUM


OUTER WALL 10 0.175 1.22 2.135 1600 CUM

14 563+040 TO 563+050 INNER WALL 10 0.175 1.407 2.46225 1600 CUM


OUTER WALL 10 0.175 1.407 2.46225 1600 CUM

15 563+050 TO 563+060 INNER WALL 10 0.175 1.402 2.4535 1600 CUM


OUTER WALL 10 0.175 1.402 2.4535 1600 CUM

16 563+060 TO 563+110 INNER WALL 50 0.175 1.4 12.25 1600 CUM


OUTER WALL 50 0.175 1.4 12.25 1600 CUM

DRAINAGE TMT DETAILS


CUTTING NOS OF
SI NO CHAINAGE NO SHAPE OF BAR (MM) DIA LENGTH BARS UNIT WT TOTAL WEIGHT
1.50
930

1 562+700 TO 562+833 1350 10 3.162 666 0.617 1299.335364

13300 8 133 12 0.395 630.42


400 8 0.4 108 0.395 17.064

1699
2 562+940 TO 562+950 1350 12 4.7 67 0.888 279.6312

1640
1350
3 562+950 TO 562+960 12 4.582 56 0.888 227.853696

1608 1350
4 562+960 TO 562+970 12 4.518 56 0.888 224.671104
1579

1350
5 562+970 TO 562+980 12 4.46 56 0.888 221.78688
1553

1350
6 562+980 TO 562+990 12 4.408 112 0.888 438.402048
1494
1511

1350
7 563+000 TO 563+010 12 4.324 56 0.888 215.023872
1480

1350
8 563+010 TO 563+020 12 4.29 56 0.888 213.33312
1470

9 563+020 TO 563+030 1350 12 4.262 56 0.888 211.940736


1462

1350
10 563+030 TO 563+040 12 4.242 56 0.888 210.946176

1350
11 563+040 TO 563+050 12 4.226 56 0.888 210.150528
1457

1350
12 563+050 TO 563+060 12 4.216 56 0.888 209.653248
1455

13 563+060 TO 563+110 1350 12 4.212 280 0.888 1047.27168

14 562+940 TO 563+110 17000 8 170 16 0.395 1074.4

400 8 0.4 224 0.395 35.392


12
1830

H-480

15 DOWN SLAB OUTER MAIN 1350 12 7.27 274 0.888 1768.87824

H-480
1590

16 DOWN SLAB INNER MAIN 1350 12 6.37 274 0.888 1549.89744


17 CHAIR 12 1.5 80 0.888 106.56

TOTAL TMT = 10192.61133


KG

SUPPLY LABOURS
DATE MISTRI LABOUR

6/10/2022 3 4
6/13/2022 6 5
6/14/2022 3 3
6/15/2022 3 3
6/16/2022 1 2
6/17/2022 3 6
6/18/2022 3 6
6/27/2022 0 5
6/28/2022 0 5
6/29/2022 0 5
6/30/2022 0 4
7/1/2022 3 8
7/2/2022 0 4
7/26/2022 6 9
7/27/2022 6 9
7/28/2022 3 3
7/29/2022 4 3
7/30/2022 7 9
7/31/2022 9 9
8/20/2022 2 2
8/21/2022 2 3
8/22/2022 3 3

TOTAL = 67 110