Professional Documents
Culture Documents
ELECTRICITY
ELECTRICITY
1.
1. 1.
3. Turn the circuit on to check the fault again. 3. -Connect the MA6 (54) to have continuity on it.
Turn it off and do a continuity test on MA6 each -Connect the Holding contactor to SW6 start push
3.There is no continuity on MA6 (54)
53NO and 54NO using multimeter set to button
continuity or resistance. -Fix the wirings in MA6 (54)
Step by Step Procedure in finding the given fault
Faults Possible Rectification (State at least 3 each)
based on the given Control Circuit Diagram:
ACT 8