DAILY REPORT
i ProjectName: Constuclian of brdge helacen -
\ Tnalanna - Andupadang
Project Code = pyz] Date
Staffand Labours
No | Description Quantity | | No | hx
01 _| Project Engineer —__| er xcavator 200 (elas ) mf ft
02 _| Site Engineer = Exavaworiz0
x 03__| Work Supervisor [ =
04 | Cleark | a
[05 [Store Keeper et er(cube JT
06 | Operator O14 | 05 | Tractor with trailer (g Ye) | OT
ee 07__| Driver _— 1 | | 96 | Water Bowser =
= 08_[ Skilled Labour [93 Water pump(2”) (3h) ot |
09 | Unskilled Labour od Water Pump (3") -
10 Sub contract Labour = ‘Water pump (4°) =
11__| Sub contract TO 7 Pocker vibrator - } .
al 12 | Night watcher ol Van - =
13
= Work plan & Description _ _
No | Location | Deseription: ‘of work
| |
[01 |ansepalana end | Dewatemg 7 |
= 02 |(CExcaveled pt | vemouing mud trom excavald pit.
el 93 | area) Remued matenal 1s carlrd awed trom the
at CAE cube)
a LS _—
Issues
be
Contractor's Representative Consultant Representative