Barahmasi Gram Sadak Yojna: Format:F-1 (Govt. of M.P. Panchyat and Rural Development Department) Summary Sheet

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

BARAHMASI GRAM SADAK YOJNA

(Govt. of M.P. Panchyat and Rural Development Department) FORMAT :F-1


SUMMARY SHEET

Distt.:- RATLAM

Construction
Habition / Village to Connected
Name of Cluster Package No.
Name of Road Phase/ Year
Development Block Identification No.
500-250 <250 Cost (Rs. In lakh) 886562.91

Shivgarh Raoti Rd.


Sailana 1
To Sangakho

ESTIMATED COST (Rs. IN LAKHS)


Construction Package Total Length of No. Of New CD Total Village
Type of Work
No. Roads (Km) Structures Pavement from Format F- CD Structure from Connected
Total [(5)+(6)]
2 Format F-3

1 2 3 4 5 6 7 8

NEW
CONNECTIVITY
1 0.500 1 694588.91 191974.00 886562.91 1

UPGRDATAION

TOTAL 1 0.500 1 694588.91 191974.00 886562.91 1

Cost of Pavement Per KM = 1389177.83 lakh


Cost of CD Per KM = 383948.00 lakh

You might also like