The structural part of the building supports the body of the building preventing it from any
collapse or failure. Therefore, structural design involves the determination of the different
sections of the skeletal part of the building to make it stable and sustainable throughout its design
life.
A structural design is executed in such a way that the building will remain fit with appropriate
degrees of reliability and in an economic way. It should sustain all the actions and influences
during execution and use. Therefore, structural design focuses on structural safety and
serviceability with due durability. It must also optimize the cost expended in building the
structure and maintenance.
This structural design is executed based on the Ethiopian Building Code of Practice (EBCS)
prepared in 1995 E.C. This code follows the Limit State design approach. Limit state is a state
beyond which the structure no longer satisfies the design performance requirements. It consists
of two states namely Ultimate Limit and serviceability Limit states. Ultimate Limit states are
conditions related with collapse or states prior to structural failure. Its main concern is the safety
of structure and people. Serviceability Limit states are those associated to conditions beyond
which a structure does not accomplish specified service requirements. It is mainly concerned
about the function of construction works, comfort of people, and appearance
The prime objective of design is structural safety and serviceability. In case the structure fails, it
must be in such a way it will minimize risks and casualty. It must extend the time for evacuation
of people inside a building. This requirement of structural design is accomplished by the
principle called ductility. Ductility allows yielding of steel reinforcement prior to the collapse of
the building. Yielding of steel bars warns the start of failure of a structure or its part. Therefore,
structures are designed to be under reinforced by certain percent to assure ductility mode of
failure if it happens.
This M+3 building is located in dilla towen. The building compartments consist of Bed rooms,
restaurant and Cafeteria, Shops etc. Therefore, it is designed according to EBCS 1 to 8, 1995 to
fulfill the required functions and service of its parts
The structure was analyzed as space frame using SAP2000 to collect all the actions for each
structure Finally, the structural members such as roof, stairs, beams, columns, footings are
designed using limit state design approach stated in EBCS published in 1995.
G+3 Mixed-Use Building Analysis & Design Feb 2013
_________________________________________
Specification materials and design data
Purpose – Mixed-use Building
Approach- Limit state design method
Material – Concrete – 25, class – I works
Steel S – 300 & RHS for roof truss and purlin EGA- 500 for roof cover is used.
Partial safety factors – concrete γc=1.5
Steel γs=1.15
Unit weight of concrete γc=24KN/m3
Design Data and Materials
Concrete fck = 0.8*25MPa =20MPa
fctk= 0.21*fck2/3 =1.547MPa
fcd= 0.85*fck/ γc =11.33MPa
fctd= fctk/ γc =1.032MPa
Steel ,fyk= 300MPa
fcd= 260.87MPa
Design loads Fd= γf*Fk Where, Fk = characteristics loads
γf = partial safety factor for Live loads = 1.6
Dead loads = 1.3
2
Page
If the span ratio Ly/Lx of a given beam-floor system is greater than two, it is a one way slab and
If 1≤ Ly/Lx≤2 it is a two-way slab. Effective slab depth or deflection requirement can
be determined by:
βa=Constant, a function of restraint, [EBCS-2, 1995, Table 5.1]
d≥( )
𝐿e= the effective span, for two way slab the shorter span (m)
Check depth for deflection
d ≥ (0.4 + 0.45) () Since, Lx=Le
d ≥ (0.85)
Depth
Where,
G+3 Mixed-Use Building Analysis & Design Feb 2013
_________________________________________
Le=Effective span length, for two way slabs the shorter span
Beam 20 24 28 10
Slab
a. span ratio 2:1 25 30 35 12
b. span ration 30 35 40 10
EBCS 2 -1995 Table 5.1
For Ly>Lx, effective span length Le=Lx
βa values will be interpolated using span ratio and boundary condition from table
5.1(EBCS2-1995).
Over all depth, D
D=d+cover+Ø1+ Ø1
Put the plan and panel labelings such as S1, S2, ... S16
2
MXS= XSPdLx
2
MXF= XFPdLx
2
MYS= YSPdLx
2
MYF= YFPdLx
In a tabular form
6
Page
Type 1 Type 2
Type 3 Type 4
16.42
KN/m
Mxs
1.01
m
1.01m
Mxs=9.65KN*1.01m KN *( )2
2
=18.25 KN.m
Panel S13
Pd=9.65
9.78 KN
15.83
KN/m
Mxs
1.45
m
1.45m
Mxs=9.65 KN *( )2
2
=30.82 KN.m
Panel S14
Pd=9.65 KN/m
9.78 KN
17.21
KN/m
Mxs
1.35
m
1.35m
Mxs=9.78KN*1.35m + 17.21 KN *( )2
2
=28.88 KN.m
Panel S14
Dilla University department of Civil Engineering
G+3 Mixed-Use Building Analysis & Design June 2021
Pd=9.65 KN/m
9.78 KN
18.08
KN/m
Mxs
0.06 m
0.06m
Mxs=9.78KN*0.61m + 18.08 KN *( )2
2
=9.33 KN.m
M -ML M +ML
Case (1) If
M *100<20% then Md= , MR>ML
M -ML
Case (2) If
M *100>20% then Distribute unbalanced moment MD=MR-ML based on relative
stiffness….MR>ML
K
K +KL* M……………………………..Considering right
Md=MR-
ML MR
K
Md=MR+
K +KL* M…………………………......Considering Left
MR>M
Note that If adjustment is between two-way and cantilever, then Md=Mmax
since panel 16 is cantilever and panel 15 is two-way take the maximum moment.
Between 14& 9
put all these below listed moments in the form of table
MR=3.53 ML=3.22 since one representative sample shown is enough
3.53-3.22
*100=8.78<20%
3.53
3.53-3.22
Md= =3.375 KN.m
2
Between 15& 14
MR=26.11 ML=4.13
- 4.13
*100=32.63 >20%
K I
Md=MR-
K + KL * M, where M=MR-ML=6.73-4.13=2.6 KN.m, KR=
Lx
I
3.2
Md=6.73 - I 6 I 2.6*
3.26+2.81
=6.73-1.2
=5.53 KN.m
7.97-6.73
*100=8.78<20%
6.73
7.97+6.73
Md = 2 = 7.25 KN.m
Between 10 & 9
Between 14 & 13
-6.17
*100=55.6>20%
I
3.2
Md=13.9 - I 6 I
+
2.6*
3.26 2.81
=10.32 KN.m
Between 9 & 14
3.88-3,53
*100=9.02<20%
3.88+3.53
Md = 2 = 3.71 KN.m
Between span 9 & 11
-6.24
*100=21.7>20%
I
3.2
Md=7.97 - I 6 I
+
*
(7.97-6.24)
3.26 3.26
=7.105 KN.m
Md=26.21 KN.m
Between 9 & 8
-6.06
*100=27.77>20%
I
3.2
Md=8.39 - I 6 I
+
*
(8.39-6.06)
3.26 2.81
=7.31 KN.m
-4.13
*100=69.9%>20%
I
3.2
Md=13.72 - I 6 I
+
*
(9.59)
3.26 2.81
=9.28 KN.m
Md=15.04 KN.m
Md=24.6 KN.m
7.97-6.72
*100=8.78<20%
7.97
7.97+6.72
Md = 2 = 7.345 KN.m
Between Panel 10 & 15
4.75-3.88
*100=18.32<20%
4.75
4.75+3.88
Md = 2 = 4.315 KN.m/m
Between Panel 11 & 16
*100=0.16<20%
+6.24
Md =
2
= 6.25 KN.m/m
Between Panel 4 & 15
Since Panal 4 is cantilever and panal 15 is two-way slab take the maximum
Md =26.21 KN.m/m
-9.05
*100=13.4 %< 20%
+9.05
Md =
2
= 9.75 KN.m/m
Between Panel 8 & 7
-10.45
*100=4.5 %< 20%
+10.45
Md =
2
= 10.69 KN.m/m
Md =9.72 KN.m/m
Md =12.27 KN.m/m
Md =9.28 KN.m/m
Md =12.28 KN.m/m
Md =9.28 KN.m/m
Md =12.28 KN.m/m
Between Panel
Md =9.25 KN.m/m
Between Panel
Md =12.24 KN.m/m
No Adjustment
Md =26.66 KN.m/m
-9.35
*100=10.53 %< 20%
+9.35
Md =
2
= 9.9 KN.m/m
Between Panel 11 & 19
Md =26.66 KN.m/m
-11.44
*100=32.52%>20%
I
1.6
Md=13.72 - *
I I (11.44-7.72)
1.6+1.6
=9.38 KN.m
S13,S14,S15,S16.
Panel F6 & S6 are also analyzed by strip method since the percentage of the ratio of partition load to total
load is greater than 20%.
Panel F13
Pd=12.17 KN/m2
1.2m
2.72222
2.7
Stripping
Using a strong bond of [max (Lx/4, 75cm)=0.75m] , 0.75m width for both side free edge.
Strip A-A
9.78 KN
W=12.17
KN/m
K2 W
Taking X=0.26+0.75/2=0.635 m
W=12.17 9.78 KN
Dilla University
KN/m department of Civil Engineering
G+3 Mixed-Use Building Analysis & Design June 2021
Mys
Mys=1/2*Mcant + Pd (ex)*X
Mys=1/2 (WL2/2) +
Mys=1/2(1/2*12.17*0.0352) + (9.78*0.635)
Mys=7.44 KN.m
W=12.17 KN/m
7.44 KN.m
o
Mo=0
K1W=5.982
K1*12.17=5.982
K1=0.49
Strip C-C
9.78 KN
Mys
K2 W
Mys=9.78*1.075=10.51 KN.m
9.78 KN
10.51 KN.m
O
K2 W
W=12.17 KN/m2
Mo=0
K2=0.374
Strip D-D
9.78 KN
(1+K1)W=18.13KN/m
K2W=4.55 KN/m
9.78 KN
18.13KN/m
Mys
4.55 KN/m
Strip B-B
9.78 KN
(1+2K2)
(1+K2)W
W
Mys
(1+K2)W=(1+0.379)*12.17=16.72 KN/m2
(1+2K2)W=(2*0.374)*12.17=21.27 KN/m2
Panel S15,16
Pd=16.67 KN.m
Pew=9.78 KN
3.20
Strip A-A
K1 W
X=0.85m + 0.75m/2=1.225m
9.78 KN
16.67 KN/m
9.78 KN
16.67 KN/m
12.24 KN.m
K1 W
K1=0.616
K1W=10.27
(1-K1)W=6.4 KN.m
Strip B-B
6.4 KN/m
Mxs=2Mxf=2(2.21)=4.42 KN.m
If the support moment is decreased the span moments Mxf and Myf are then increased
allow for the changes of support moment.
Mxdf = Mxf + Cx M’
Mydf = Myf + C y M’
Where, M’= MR-Md (on all the supports)
Cx, Cy = Coefficients for adjusting span moments given in table.
If the support moment is increased, no adjustment shall be made to the span moment
Thus span moment adjustments is required for P 6, P8, P9, P10, P11, P15, P16
M’=6.73-5.53=1.2 KN.m
Lx=3.
26
Ly=3.32
Cy=0.38 , Cx=0.29 By interpolation
Mydf=5.10+0.38*1.2=5.56 KN.m
Mxdf=4.90+0.29*1.2=5.25 KN.m
Panel 8
M’=3.53-3.375=0.155 KN.m
Lx=2.81
Ly=4.59
Cy=0.0774 , Cx=0.292 By interpolation
Mydf=2.65+0.0774*0.155=2.66 KN.m
Mxdf=4.63+0.292*0.155=4.675 KN.m
Panel 9
Case I
M’=7.97-7.25+7.97-7.105+13.9-10.32=5.165 KN.m
Lx=3.26
Ly=4.59
Cx=0.314 , Cy=0.109 By interpolation
Mxdf1=10.42+0.314*5.165=12.04 KN.m/m
Mydf1=6.13+0.109*5.165=6.693 KN.m/m
Case II
M’=7.97-7.25+7.97-7.105+13.9-10.32=5.165 KN.m
Lx=3.26
Ly=4.59
Cx=0.396 , Cy=0.329 By interpolation
Mxdf2=12.04+0.396*5.165=14.09 KN.m/m
Mydf2=6.693+0.329*5.165=8.39 KN.m/m
Panel 10
M’=3.88-3.71=0.17 KN.m
Lx=2.81
Ly=3.99
Cx=0.313 , Cy=0.107 By interpolation
Mydf=2.91+0.107*0.17=2.93 KN.m/m
Panel 11
M’=8.39-7.31=1.08 KN.m
Lx=3.26
Ly=3.99
Cx=0.351 , Cy=0.361 By interpolation
Mydf=4.68+0.361*1.08=5.07 KN.m/m
Panel 15
M’=4.75-4.31=0.44 KN.m
Lx=2.81
Ly=5.33
Cx=2.58 , Cy=0.06 By interpolation
Mxdf=6.82+0.258*0.44=6.933 KN.m/m
Mydf=3.56+0.06*0.4=3.53 KN.m/m
Panel15
Case I
Lx=3.26
Ly=5.33
Cx=0.289 , Cy=0.071 By interpolation
Mxdf1=8.2+0.289*1.45=8.62 KN.m/m
Mydf1=3.56+0.071*1.45=3.66 KN.m/m
Case II
Lx=3.26
Ly=5.33
Cx=0.448 , Cy=0.284 By interpolation
Mxdf2=8.62+0.448*1.45=9.26 KN.m/m
Mydf2=3.66+0.284*1.45=4.07 KN.m/m
Panel 16
M’=10.45-9.9=0.55 KN.m
Lx=3.16
Ly=5.33
Cx=0.457, Cy=0.275 By interpolation
Mydf=4.44+0.275*0.55=4.59 KN.m/m
Panel 13
M’=(11.44-7.72)+(11.44-10.78)=0.44 KN.m
Ly/Lx=2.038
Lx=1.6
Ly=3.26
Cy=0.055 By interpolation
Mydf=5.72+0.055*4.4=5.96 KN.m/m
Panel 12
M’=(5.76-4.28)+(5.76-5.41)=1.83 KN.m
Ly/Lx=2.038
Lx=1.6
Ly=3.26
Cy=0.055 By interpolation
Mydf=2.88+0.055*1.83=5.96 KN.m/m
Lap
Panel moment Km Ks As Asmin Scalc Sprov Remark Length Length lbnet
1ys 21.2 35.4 4.1 670.2 216.6 117.2 110 φ10 C/C110 1.45
xs 26.1 39.3 4.2 832.9 216.6 94.3 90 φ10 C/C90 1.01
2xs 15.0 29.8 4.0 457.0 216.6 110.0 100 φ8 C/C100 1.01
3ys 21.2 35.4 4.1 669.6 216.6 117.3 110 φ10 C/C110 1.35
xs 29.6 41.8 4.2 957.3 216.6 82.0 80 φ10C/C80 1.01
4xs 26.2 39.4 4.2 837.7 216.6 93.8 90 φ10 C/C90 1.45
5ys 3.4 14.1 4.0 102.5 216.6 232.0 230 φ8 C/C230 3.32
yf 3.4 14.2 4.0 103.6 216.6 232.0 230 φ8 C/C230 3.32 0.32 0.664
xs 5.5 18.1 4.0 168.0 216.6 232.0 230 φ8 C/C230 2.81
xf 3.1 13.6 4.0 94.8 216.6 232.0 230 φ8 C/C230 2.81 0.32 0.562
6ys 7.3 20.7 4.0 220.8 216.6 227.5 220 φ8 C/C220 3.32
yf 5.3 17.6 4.0 159.5 216.6 232.0 230 φ8 C/C230 3.32 0.32 0.664
xs 24.6 38.2 4.1 782.8 216.6 100.3 100 φ10 C/C100 3.26
xf 5.6 18.1 4.0 168.9 216.6 232.0 230 φ8 C/C230 3.26 0.32 0.652
7xs 24.6 38.2 4.1 782.8 216.6 100.3 100 φ10 C/C100 1.35
8ys 3.7 14.8 4.0 112.7 216.6 232.0 230 φ8 C/C230 4.59
yf 2.7 12.5 4.0 80.8 216.6 232.0 230 φ8 C/C230 4.59 0.32 0.918
xs 10.3 24.7 4.0 316.0 216.6 159.0 150 φ8 C/C150 2.81
xf 4.7 16.6 4.0 142.0 216.6 232.0 230 φ8 C/C230 2.81 0.32 0.562
Lap
Panel moment Km Ks As Asmin Scalc Sprov Remark Length Length lbnetspan
9ys 7.1 20.5 4.0 216.4 216.6 232.0 230 φ8 C/C230 4.59
yf 8.4 22.3 4.0 256.2 216.6 196.1 190 φ8 C/C190 4.59 0.32 0.918
xs 10.3 24.7 4.0 316.0 216.6 159.0 150 φ8 C/C150 3.26
xf 14.1 28.9 4.0 437.5 216.6 114.8 110 φ8 C/C110 3.26 0.32 0.652
10ys 4.3 16.0 4.0 131.1 216.6 232.0 230 φ8 C/C230 3.99
yf 2.9 13.2 4.0 89.0 216.6 232.0 230 φ8 C/C230 3.99 0.32 0.798
xs 7.3 20.8 4.0 222.7 216.6 225.7 220 φ8 C/C220 2.81
xf 4.7 16.6 4.0 141.6 216.6 232.0 230 φ8 C/C230 2.81 0.32 0.562
11ys 6.3 19.2 3.0 141.8 216.6 232.0 230 φ8 C/C230 3.99
yf 5.1 17.3 4.0 154.1 216.6 232.0 230 φ8 C/C230 3.99 0.32 0.798
xs 7.3 20.8 4.0 222.7 216.6 225.7 220 φ8 C/C220 3.26
xf 6.8 20.1 4.0 207.7 216.6 232.0 230 φ8 C/C230 3.26 0.32 0.652
12xs 7.4 20.9 4.0 225.2 216.6 223.1 220 φ8 C/C220 0.63
13ys 5.0 17.2 4.0 151.9 216.6 232.0 230 φ8 C/C230 3.99
yf 3.7 14.8 4.0 113.0 216.6 232.0 230 φ8 C/C230 3.99 0.32 0.798
xs 26.7 39.7 4.2 854.8 216.6 91.9 90 φ10 C/C90 2.88
xf 5.3 17.6 4.0 159.8 216.6 232.0 230 φ8 C/C230 2.88 0.32 0.576
14xs 26.7 39.7 4.2 854.8 216.6 91.9 90 φ10 C/C90 1.45
15ys 12.3 26.9 4.0 378.9 216.6 132.6 130 φ8 C/C130 5.33
yf 3.6 14.6 4.0 108.8 216.6 232.0 230 φ8 C/C230 5.33 0.32 1.066
xs 9.8 24.0 4.0 298.5 216.6 168.3 160 φ8 C/C160 2.81
xf 6.9 20.2 4.0 211.1 216.6 232.0 230 φ8 C/C230 2.82 0.32 0.564
16ys 12.3 27.0 4.0 379.2 216.6 132.5 130 φ8 C/C130 5.33
Chapter two
Solid Slab design
Slab and Analysis and Design
A reinforced concrete slab is abroad, flat plate, usually horizontal, with top and bottom surface
parallel or nearly so. It is used to provide flat surface mainly for roofs and floors of building
parking lots, air fields, road ways, bridges etc. It may be supported by reinforced concrete beam,
by masonry or reinforced concrete walls, by structural steel members, directly by columns, or
continuously by the ground. But we are intend to design beam supported floor and roofs solid
slabs of the building accordingly EBCS-1995.
Beam support slab can be classified as one way slab and two way slab based on the longer to
shorter length ratio.
A. One way slabs: - main reinforcement in each element runs in one direction only. The slab is
one way if the slab panel longer length to shorter length ratio is greater than two (i.e. Ly/Lx > 2).
B. Two way slab:-main reinforcement runs in both directions where ratio of long to short span is
less than two (i.e.𝐿𝑦𝐿𝑥≤2).
The reinforcement bar, in one way slab, main steel is provided along with short span only and
the load is transferred to two opposite supports and in two-way slab, main steel is provided in
both directions
Panel selection
Before proceeding to the analysis and design of solid slab we should select type of panel. The
selection of panels is depending on:
Boundary condition
Shorter(Lx) and longer(Ly) length of the panel
Function of panel.
fck=0.8*25=20Mp𝑎
fctk=1.5Mpa
fcd =20*0.85/1.5=11.33Mpa
fctd = = =1.03Mpa
Reinforcement Steel
fyk=300Mpa
γs=1.15
fyd =fyk/ γs= 300/ 1.15=260Mpa
Es=200Gpa
ii. Design load
Fd= ɣfFk
Where: - Fk= Characteristic load
ɣf = Partial safety factor for loads
ɣf= 1.6 for live load [EBCS – 2, 1995 table 3.3]
ɣf = 1.3 for dead load
d≥( )
𝐿e= the effective span, for two way slab the shorter span (m)
Beam 20 24 28 10
Slab
a. span ratio 2:1 25 30 35 12
b. span ration 30 35 40 10
EBCS 2 -1995 Table 5.1
For Ly>Lx, effective span length Le=Lx
βa values will be interpolated using span ratio and boundary condition from table
5.1(EBCS2-1995).
Over all depth, D
D=d+cover+Ø1+ Ø1
Depth Determination
From the tabulation result, the maximum depth required is, d=138mm.Hence,
d=138mm, using ф12mm reinforcement bar, 15mm concrete cover,
D= 102+15+1.5(12) =165mm Therefore, for construction workability and uniformity
Take D=150mm .Therefore for the slab depth we have taken D=165mm.
From the tabulation result, the maximum depth required is, d=140mm.Hence,
d=140mm, using ф12mm reinforcement bar, 15mm concrete cover,
D= 2+15+1.5(12) =165mm Therefore, for construction workability and uniformity
Take D=165mm .Therefore for the slab depth we have taken D=165mm.
Unit weight for reinforced concrete slabs ranges from 20-28 KN/m3 therefore we use γ=24kn/m3
for c-25 concrete.
150mm Rc Slab
*Cement screed, RC slab, plastering are having constant thickness here. 20mm Plastering
Note: Unit weight for RC slabs ranges from 20-28 KN/m3, we use the average; =24 KN/m3
for C-25 Concrete.
Function Material Thickness (m) Unit Weight, t (KN/m2) Total Dead Load
(KN/m2) (KN/m2)
Bath room Ceramic 0.02 21 0.42
Toilet Cement Screed 0.05 23 1.15
5.63
Shower RC Slab 0.15 24 3.6
Plastering & 0.02 23 0.46
Painting
Pvc tile 0.02 23 0.46
Pool office Cement Screed 0.05 23 1.15
RC Slab 0.15 24 3.6 5.67
Plastering & 0.02 23 0.46
Painting
ceramic 0.03 27 0.81
Corridor Cement Screed 0.03 23 1.15
Balcony RC Slab 0.15 24 3.6 6.02
Landing Plastering & 0.02 23 0.46
Painting
PVC 0.02 16 0.032
Bed Room Cement Screed 0.05 23 1.15
Living room RC Slab 0.15 24 3. 6 5.25
Plastering & 0.02 23 0.046
Painting
Governing Governing
Calculated Dead Dead Load Live Load Live Load Pd'=1.3D.L+1.6L.
Panel Function Load (KN/m2) (KN/m2) (KN/m2) 2
(KN/m ) L (KN/m2)
F1 Balcony 6.02 6,02 2 2 11.03
5.67 3
12.12
F7,F8 Pool office 5.67 5.67 3 3 12.12
F16,F17,F18,
F19 Pool office 5.67 5.67 3 3 12.12
Table 2.8
T1,T2,T3,
T4,T5 Balcony 6.02 4 4
11.03
5.25 3 11.63
Room
Common
T11 bath 5.36 5.25 2 2 10.03
Thickness of HCB=150mm
Thickness of plastering on two side=20mm
Unit weight of HCB=11 KN/m3
Unit weight of plastering =23 KN/m3
Height of wall=3m
Unit weight of HCB for light weight aggregate range from 10-14 KN/m3 & lower values
are used for smaller size thickness (100mm to 200mm) ,so we use HCB=11 KN/m3
Dead load of partition wall=Dead load of plaster+ Dead load of HCB
D.L pw kN
Therfore D.L pw(kN/m2)=
rea of Panel
Hpl , Lpl , tpl & pl =Height, Length, Thickness, Unit Weight of Plastering Respectively.
HHCB , LHCB , tHCB & HCB= Height, Length, Thickness, Unit Weight of HCB Respectively.
Table 2.8
Table2.9
D.L pw
D.L pw (kN)=Length *6.33 Area (kN/m2)=D.L pw
Panel Length (m) KN/m2 (m2) (kN)/Area
2.0l
T1 12.72 5.00 2.54
T2 o.70 4.43 5.40 0.82
0.95
T3 6.01 1.11
T4 2.5 15.83 5.00 3.17
T5 2.3 14.56 6.60 2.21
Pd=Pd’+1.3 D.L pw
partition load*100
Case-ii : for panels where is greater than 20% , they are designed by strip
Pd =(1.3 D.L+1.6 L.L)
method
Pd=Pd’+1.3 D.L pw
partition load*100
Case-ii : for panels where is greater than 20% , they are designed by strip
Pd =(1.3 D.L+1.6 L.L)
method
2
MXS= XSPdLx
2
MXF= XFPdLx
2
MYS= YSPdLx
2
MYF= YFPdLx
In a tabular form
Table 2.12
Type 1 Type 2
NOTE Type 3 Type 4
Thickness of HCB=200mm
Thickness plastering on two side=20mm
Unit weight of HCB=14KN/m3
Unit weight of plastering=23 KN/m3
Height of wall=3m
Panel S16 F16 & T16
Load from external wall=(Hpl * tpl * pl ) + (HHCB * tHCB * HCB)
Where: Hpl ,tpl & pl =Height, Thickness, Unit Weight of Plastering Respectively.
HHCB , tHCB & HCB= Height, Thickness, Unit Weight of HCB Respectively.
=9.78 KN/m
D.Lex=9.78 kN
Pd= 16.42 KN/m
9.78 KN
16.42
KN/m
Mxs
1.01
m
1.01m
Mxs=9.78KN*1.01m + 16.42 KN *( )2
2
=18.25 KN.m
Panel S17 ,F17 & T17
G+3 Mixed-Use Building Analysis & Design June 2021
Pd=15.83 KN/m
D.Lex=9.78 KN (same as F2,S2 & T2)
9.78 KN
15.83
KN/m
Mxs
1.45
m
1.45m
Mxs=9.78KN*1.45m + 15.83 KN *( )2
2
=30.82 KN.m
Panel S18,F18 & T18
Pd=17.21 KN/m
D.Lex=9.78 KN (same as F2,S2 & T2)
9.78 KN
17.21
KN/m
Mxs
1.35
m
1.35m
Mxs=9.78KN*1.35m + 17.21 KN *( )2
2
=28.88 KN.m
Pd=18.08 KN/m
D.Lex=9.78 KN (same as F2,S2 & T2)
9.78 KN
18.08
KN/m
Mxs
0.06 m
0.06m
Mxs=9.78KN*0.61m + 18.08 KN *( )2
2
=9.33 KN.m
M -ML M +ML
Case (1) If
M *100<20% then Md= , MR>ML
M -ML
Case (2) If
M *100>20% then Distribute unbalanced moment MD=MR-ML based on relative
stiffness….MR>ML
K M……………………………..Considering right
K + KL *
Md=MR-
ML MR
K
K +KL* M…………………………......Considering Left
Md=MR+
MR>M
Note that If adjustment is between two-way and cantilever, then Md=Mmax
Support adjustments between panel 16 and panel 14 (For 1st, 2nd, 3rd floor)
MR=15.04 ML=3.22
since panel 16 is cantilever and panel 15 is two-way take the maximum moment.
MR=3.53 ML=3.22
3.53-3.22
*100=8.78<20%
3.53
3.53-3.22
Md= =3.375 KN.m Put these moments in table form
2
Between 15& 14 (for 1st, 2nd, 3rd)
MR=26.11 ML=4.13
- 4.13
*100=32.63 >20%
K I
K + KL *
Md=MR- M, where M=M R-M L=6.73-4.13=2.6 KN.m, K R=
Lx
I
3.2
Md=6.73 - I 6 I
+
2.6 *
3.26 2.81
=6.73-1.2
=5.53 KN.m
7.97-6.73
*100=8.78<20%
6.73
7.97+6.73
Md =
2 = 7.25 KN.m
Between 10 & 9 (for 1st, 2nd, 3rd floor)
-6.17
*100=55.6>20%
I
3.26
Md=13.9 - I
+
I*2.6
3.26 2.81
=10.32 KN.m
3.88-3,53
*100=9.02<20%
3.88+3.53
Md = 2 = 3.71 KN.m
Between span 9 & 11 (for 1st, 2nd, 3rd floor)
-6.24
*100=21.7>20%
I
3.26
Md=7.97 - I
+
I*(7.97-6.24)
3.26 3.26
=7.105 KN.m
Md=26.21 KN.m
-6.06
*100=27.77>20%
I
3.2
Md=8.39 - I 6 I
+
*
(8.39-6.06)
3.26 2.81
=7.31 KN.m
-4.13
*100=69.9%>20%
I
3.2
Md=13.72 - I 6 I
+
*
(9.59)
3.26 2.81
=9.28 KN.m
Md=15.04 KN.m
Md=24.6 KN.m
7.97-6.72
*100=8.78<20%
7.97
7.97+6.72
Md = 2 = 7.345 KN.m
Between Panel 10 & 15 (for 1st, 2nd, 3rd floor)
4.75-3.88
*100=18.32<20%
4.75
4.75+3.88
Md = 2 = 4.315 KN.m/m
Between Panel 11 & 16 (for 1st, 2nd, 3rd, floor)
*100=0.16<20%
+6.24
Md =
2
= 6.25 KN.m/m
Between Panel 4 & 15 (for 1st, 2nd, 3rd floor)
Since Panal 4 is cantilever and panal 15 is two-way slab take the maximum
Md =26.21 KN.m/m
-9.05
*100=13.4 %< 20%
+9.05
Md =
2
= 9.75 KN.m/m
Between Panel 8 & 7 (for 1st, 2nd, 3rd, floor)
-10.45
*100=4.5 %< 20%
+10.45
Md =
2
= 10.69 KN.m/m
Between Panel 14 & Landing L1 (for 1st, 2nd, 3rd, floor)
Md =42.72 KN.m/m
Md =9.72 KN.m/m
Md =12.27 KN.m/m
Md =9.28 KN.m/m
Md =12.28 KN.m/m
Md =9.28 KN.m/m
Md =12.28 KN.m/m
Md =9.25 KN.m/m
Md =12.24 KN.m/m
No Adjustment
Md =26.66 KN.m/m
-9.35
*100=10.53 %< 20%
+9.35
Md =
2
= 9.9 KN.m/m
Between Panel 11 & 19(for 1st, 2nd, 3rd floor)
Md =26.66 KN.m/m
-11.44
*100=32.52%>20%
I
1.
Md=13.72 - I 6 I (11.44-7.72)
*
1.6+1.6
=9.38 KN.m
F1, S1,T1, F2, S3, T2, F3, S3, T3, F4, S4, T4, F5, S5, T5, F6,S6.
Panel F6 & S6 are also analyzed by strip method since the percentage of the ratio of partition load to total
load is greater than 20%.
2m
2.72222
2.7m
Stripping
Using a strong bond of [max (Lx/4, 75cm)=0.75m] , 0.75m width for both side free edge.
Strip A-A
9.78 KN
W=12.17
KN/m
K2 W
Taking X=0.26+0.75/2=0.635 m
W=12.17 9.78 KN
Mys KN/m
Mys=1/2*Mcant + Pd (ex)*X
Mys=1/2 (WL2/2) +
Mys=1/2(1/2*12.17*0.0352) + (9.78*0.635)
Mys=7.44 KN.m
9.78 KN
W=12.17 KN/m
7.44 KN.m
o
K2 W
Mo=0
K1W=5.982
K1*12.17=5.982
K1=0.49
Strip C-C
9.78 KN
Mys
K2 W
Mys=9.78*1.075=10.51 KN.m
9.78 KN
10.51 KN.m
O
K2 W
W=12.17 KN/m2
Mo=0
K2=0.374
Strip D-D
9.78 KN
(1+K1)W=18.13KN/m
K2W=4.55 KN/m
9.78 KN
18.13KN/m
Mys
4.55 KN/m
Strip B-B
9.78 KN
(1+2K2)
(1+K2)W
W
Mys
(1+K2)W=(1+0.379)*12.17=16.72 KN/m2
(1+2K2)W=(2*0.374)*12.17=21.27 KN/m2
Pd (ex)=9.78 KN/m
Using a strong band of 0.75m width (max of (1.01m/4, 75 cm) for both side free edge.
Strip A-A
9.78 KN
W=12.17
KN/m
K2 W
Mys=1/2*Mcant + Pd (ex)*x
=1/2(1/2*12.17*(0.635)2) + 9.78*0.635
=7.44 KN.m
9.78 KN
7.44 KN
o
K2 W
Mo=0
K1W=5.982
K1*12.17=5.982
K1=0.49
Strip C-C
9.78 KN
K2 W
Mys
Mys=9.78*0.975=9.54 KN.m
9.78 KN
9.54
o
K2 W
Mo=0
K2=0.412
Strip D-D
9.78 KN
(1+K1)W=18.13KN/m
K2W=5.01 KN/m
9.78 KN
18.13KN/m
5.01 KN/m
Strip B-B
9.78 KN
(1+2K2)
(1+K2)W
W
Mys
(1+K2)W=(1+0.412)*12.17=17.18 KN/m2
(1+2K2)W=(2*0.412)*12.17=22.19 KN/m2
Panel F 3,S3,T3
Pd=16.74 KN/m
=4.89 KN
b≥{0.75, 1.6/4=0.4m}=0.75m
Strip A-A
K1 W
X=0.85m + 0.75m/2=1.225m
4.89 KN
16.74 KN/m
=9.27 KN.m
4.89 KN
16.74 KN/m
9.27 KN.m
K1 W
K1=0.229
Strip B-B
(1-K1)W
Mxf=Mcant=WL2/24
=11.73 KN/m*(2.81m)2/24
=3.86 KN.m
WL2/12=2Mxf=2(3.86)=7.72 KN.m
Panel F4,S4, T4
Pd=16.74 KN/m
Pew=9.78 KN
Strip A-A
W=16.74 KN/m 9.78 KN
K1 W
X=0.85m + 0.75m/2=1.225m
9.78 KN
16.74 KN/m
9.78 KN
16.74 KN/m
12.27 KN.m
K1 W
K1=0.612
(1-K1)W=6.5 KN/m
Strip B-B
(1-K1)W=6.5 KN/m
Mxs=2Mxf=2(2.14)=4,28 KN.m
Panel F5,
Pd=16.74 KN/m
=4.89 KN/m
Strip A-A
Same as Panel F-20.I.e, Mys=9.28 kN.m, K1=0.229, K1W=5.004 KN/m
Strip B-B
(1-K1)W=12.922KN/m
Mxs=2Mxf=11.44 KN.m
Panel S5, T5
Pd= 16.76 KN/m
Pew=9.78 KN
X=0.85m + 0.75m/2=1.225m
Strip A-A
Same as Panel I.e, Mys=12.27 KN.m, K1=0.612, (1-K1)W=6.5 KN/m
Strip B-B
(1-K1)W=6.5 KN/m
Mxs=2Mxf=5.76 KN.m
Panel F17
Pd=16.74 KN/m
Pw=4.89 KN/m
Strip A-A
.I.e, Mys=9.28 kN.m, K1=0.229, (1-K1)W=12.922 KN/m
Strip B-B
12.922 KN/m
Mxs=2Mxf=10.76 KN.m
Pw=9.78 KN/m
Strip A-A
. I.e, Mys=12.27 KN.m, K1=0.612, K1W=10.28 KN/m, (1-K1)W=6.5 KN/m
Strip B-B
6.5 KN/m
Mxs=2Mxf=5.41 KN.m
Panel F18
Pd=16.67 KN.m
Pew=4.89 KN
Strip A-A
K1 W
X=0.85m + 0.75m/2=1.225m
4.89 KN
16.67 KN/m
4.89 KN
16.67 KN/m
9.25 KN.m
K1 W
K1=0.3
K1W=5.001
(1-K1)W=11.669 KN.m
Strip B-B
11.66 KN/m
Mxs=2Mxf=2(2.14)=7.96 KN.m
Pew=9.78 KN
3.20
Strip A-A
K1 W
X=0.85m + 0.75m/2=1.225m
9.78 KN
16.67 KN/m
9.78 KN
16.67 KN/m
12.24 KN.m
K1 W
K1=0.616
K1W=10.27
(1-K1)W=6.4 KN.m
Strip B-B
6.4 KN/m
Mxs=2Mxf=2(2.21)=4.42 KN.m
Panel F6 & S6
Pd=15.49 KN/m
2b/2=0.3*3.26/2=0.489m
a-b/2=1.69m
(1-a)b/2=1.41m
Design moment
X-direction
Middle strip
W=15.49 KN/m
6,86 KN.m
Side Strip
Mxs1=2/3*(7.745)(1.141)2/2=3.36 KN.m
Mxf2=Mxs2 /2=0.3085
Y-direction
Middle strip
Mxf2=Mxs2/2=3.36 KN.m
6.72 KN.m
1.33 KN.m
0.617 KN.m 3.36 KN.m
KN.m KN.m
Side Strip
Panel F-19
Pd=15.37 KN/m2*1m=15.37 KN/m
Pew=4.89 KN/m*1m=4.89 KN
We have distributed W=Pd into W1 and W2 based on their length ratio. For example if it is square
Ly/Lx=1, Means W1=W2
W1+W2=W
W1=W2=W/2
W1+W2=W=15.37
2.22W2=15.37
Strip A-A
4.89 KN/m
W2=6.92 KN/m
K 2 W2
Mys=1/2(Mcant+P(ex))
=1/2(6.92 KN/m*(1.225m)2/2+4.89KN*1.225m)
=5.59 KN.m
K2=0.74
Strip D-D
4.89 KN/m
8.45 KN/m
K1 W
1
X=0.7m + 0.75m/2=1.075m
4.89 KN/m
8.45 KN/m
Mys
K1=0.6
Strip B-B
(1+K1)W1 4.89 KN
K1W2
(1+K1)W1=(1+0.6)*8.45=13.52 KN/m
Pex=9.78 KN
Strip A-A
9.78 KN/m
W2=6.92 KN/m
K 2 W2
Mys=1/2(Mcant+P(ex))
=1/2(6.92 KN/m*(1.225m)2/2+9.78KN*1.225m)
=14.58 KN.m
K2=0.56
Strip D-D
4.89 KN/m
8.45 KN/m
K1 W
1
X=0.7m + 0.75m/2=1.075m
9.78 KN/m
8.45 KN/m
Mys
K1=0.7
Strip B-B
(1+K1)W1 9.78 KN
K2W2
(1+K1)W1=(1+0.6)*8.45=13.52 KN/m
Strip C-C
9.78 KN
(1+2K1)
W1 (1+K2)W2
K 2 W2
(1+2K1)W1=11.07 KN/m
(1+2K2)W2=15.22 KN/m
If the support moment is decreased the span moments Mxf and Myf are then increased
allow for the changes of support moment.
Mxdf = Mxf + Cx M’
Mydf = Myf + C y M’
M’=6.73-5.53=1.2 KN.m
Lx=3.
26
Ly=3.32
Cy=0.38 , Cx=0.29 By interpolation
Mydf=5.10+0.38*1.2=5.56 KN.m
Mxdf=4.90+0.29*1.2=5.25 KN.m
M’=3.53-3.375=0.155 KN.m
Lx=2.81
Ly=4.59
Cy=0.0774 , Cx=0.292 By interpolation
Mydf=2.65+0.0774*0.155=2.66 KN.m
Mxdf=4.63+0.292*0.155=4.675 KN.m
Case I
M’=7.97-7.25+7.97-7.105+13.9-10.32=5.165 KN.m
Lx=3.26
Ly=4.59
Cx=0.314 , Cy=0.109 By interpolation
Mxdf1=10.42+0.314*5.165=12.04 KN.m/m
Mydf1=6.13+0.109*5.165=6.693 KN.m/m
Case II
M’=7.97-7.25+7.97-7.105+13.9-10.32=5.165 KN.m
Lx=3.26
Ly=4.59
Cx=0.396 , Cy=0.329 By interpolation
Mxdf2=12.04+0.396*5.165=14.09 KN.m/m
Mydf2=6.693+0.329*5.165=8.39 KN.m/m
M’=3.88-3.71=0.17 KN.m
Lx=2.81
Ly=3.99
Cx=0.313 , Cy=0.107 By interpolation
Mydf=2.91+0.107*0.17=2.93 KN.m/m
M’=8.39-7.31=1.08 KN.m
Lx=3.26
Ly=3.99
Cx=0.351 , Cy=0.361 By interpolation
Mydf=4.68+0.361*1.08=5.07 KN.m/m
M’=4.75-4.31=0.44 KN.m
Lx=2.81
Ly=5.33
Cx=2.58 , Cy=0.06 By interpolation
Mxdf=6.82+0.258*0.44=6.933 KN.m/m
Mydf=3.56+0.06*0.4=3.53 KN.m/m
Case I
Lx=3.26
Ly=5.33
Cx=0.289 , Cy=0.071 By interpolation
Mxdf1=8.2+0.289*1.45=8.62 KN.m/m
Mydf1=3.56+0.071*1.45=3.66 KN.m/m
Case II
Lx=3.26
Ly=5.33
Cx=0.448 , Cy=0.284 By interpolation
Mxdf2=8.62+0.448*1.45=9.26 KN.m/m
Mydf2=3.66+0.284*1.45=4.07 KN.m/m
M’=10.45-9.9=0.55 KN.m
Lx=3.16
Ly=5.33
Cx=0.457, Cy=0.275 By interpolation
Mydf=4.44+0.275*0.55=4.59 KN.m/m
M’=(11.44-7.72)+(11.44-10.78)=0.44 KN.m
Ly/Lx=2.038
Lx=1.6
Ly=3.26
Cy=0.055 By interpolation
Mydf=5.72+0.055*4.4=5.96 KN.m/m
M’=(5.76-4.28)+(5.76-5.41)=1.83 KN.m
Ly/Lx=2.038
Lx=1.6
Ly=3.26
Cy=0.055 By interpolation
Mydf=2.88+0.055*1.83=5.96 KN.m/m
M’=10.76-7.96=2.8 KN.m
Ly/Lx=1.97
Lx=1.6
Ly=3.16
Cy=0.057 By interpolation
Mydf=5.38+0.057*2.8=5.54 KN.m/m
M’=5.41-4.42=0.99 KN.m
Ly/Lx=1.97
Lx=1.6
Ly=3.16
Cy=0.057 By interpolation
Mydf=2.704+0.057*0.99=2.76 KN.m/m
M’=13.72-9.28=4.44 KN.m
Lx=3.26
Ly=3.32
Cx=0.29, Cy=0.38 By interpolation
Mydf=3.36+0.38*4.44=5.05 KN.m/m
Case I
Lx=3.26
Ly=4.59
Cx=0.314 , Cy=0.109 By interpolation
Mxdf1=10.42+0.314*5.07=12.01 KN.m/m
Mydf1=6.13+0.109*5.07=6.68 KN.m/m
Case II
Lx=3.26
Ly=4.59
Cx=0.396, Cy =0.329 By interpolation
Mxdf2=12.01+0.396*5.07=14.02 KN.m/m
Mydf2=6.68+0.329*5.07=8.35 KN.m/m
Km= √ )/d, Ks
As=Ks*M/d
- To calculate spacing by selecting diameter of bar as
S=1000as/A where as=area of single bar
As=calculated area of steel
S=spacing
- Compare the above result with minimum provision given by our code.
Asmin= min*b*d=0.5/fyk*b*d=0.5*1000*128/300=213.33
smax≤{ ={ =300mm
Smax=300mm
Table 2.13
Lap
Panel moment Km Ks As Asmin Scalc Sprov Remark Length Length lbnetspan
9ys 7.1 20.5 4.0 216.4 216.6 232.0 230 F8c/c230 4.59
Yf 8.4 22.2 4.0 255.0 216.6 197.1 190 F8c/c190 4.59 0.32 0.918
Xs 10.3 24.7 4.0 316.0 216.6 159.0 150 F8c/c150 3.26
Xf 14.0 28.8 4.0 435.4 216.6 115.4 110 F8c/c110 3.26 0.32 0.652
10ys 4.3 16.0 4.0 131.1 216.6 232.0 230 F8c/c230 3.99
Yf 2.9 13.2 4.0 89.0 216.6 232.0 230 F8c/c230 3.99 0.32 0.798
Xs 7.3 20.8 4.0 222.7 216.6 225.7 220 F8c/c220 2.81
Xf 4.7 16.6 4.0 141.6 216.6 232.0 230 F8c/c230 2.81 0.32 0.562
11ys 6.3 19.2 3.0 141.8 216.6 232.0 230 F8c/c230 3.99
Yf 5.1 17.3 4.0 154.1 216.6 232.0 230 F8c/c230 3.99 0.32 0.798
Xs 7.3 20.8 4.0 222.7 216.6 225.7 220 F8c/c220 3.26
Xf 6.8 20.1 4.0 207.7 216.6 232.0 230 F8c/c230 3.26 0.32 0.652
12xs 7.4 20.9 4.0 225.2 216.6 223.1 220 F8c/c220 0.63
13ys 5.0 17.2 4.0 151.9 216.6 232.0 230 F8c/c230 3.99
Yf 3.7 14.8 4.0 113.0 216.6 232.0 230 F8c/c230 3.99 0.32 0.798
Xs 26.7 39.7 4.2 854.8 216.6 91.9 90 F10c/c90 2.88
Xf 5.3 17.6 4.0 159.8 216.6 232.0 230 F8c/c230 2.88 0.32 0.576
14xs 26.7 39.7 4.2 854.8 216.6 91.9 90 F10c/c90 1.45
15ys 9.7 24.0 4.0 297.6 216.6 168.9 160 F8c/c160 5.33
Yf 3.6 14.6 4.0 108.8 216.6 232.0 230 F8c/c230 5.33 0.32 1.066
Xs 9.8 24.0 4.0 298.5 216.6 168.3 160 F8c/c160 2.81
Xf 6.9 20.2 4.0 211.1 216.6 232.0 230 F8c/c230 2.82 0.32 0.564
Lap
Panel moment Km Ks As Asmin Scalc Sprov Remark Length Length lbnetspan l
16ys 9.3 23.4 4.0 284.0 216.6 177.0 230 F8c/c230 5.33 1
Yf 4.1 15.5 4.0 123.7 216.6 232.0 230 F8c/c230 5.33 0.32 1.066
Xs 10.7 25.2 4.0 328.1 216.6 153.2 150 F8c/c150 3.26 1
Xf 9.3 23.4 4.0 283.4 216.6 177.3 170 F8c/c170 3.26 0.32 0.652
17ys 9.3 23.4 4.0 284.0 216.6 177.0 170 F8c/c170 5.33 1
Yf 4.6 16.5 4.0 139.5 216.6 232.0 230 F8c/c230 5.33 0.32 1.066
Xs 9.9 24.2 5.0 379.2 216.6 132.5 130 F8c/c130 3.16 1
Xf 8.3 22.2 4.0 253.8 216.6 198.0 190 F8c/c190 3.16 0.32 0.632
18ys 9.3 23.4 4.0 283.1 216.6 177.5 170 F8c/c170 5.33 1
Yf 3.7 14.9 4.0 113.6 216.6 232.0 230 F8c/c230 5.33 0.32 1.066
Xs 26.7 39.7 4.2 854.8 216.6 91.9 90 F8c/c90 2.88 1
Xf 7.0 20.4 4.0 213.5 216.6 232.0 230 F8c/c230 2.88 0.32 0.576
19YS 8.9 22.9 4.0 271.5 216.6 185.1 180 F8c/c180 1.6 0
XS 22.1 36.1 4.1 697.1 216.6 72.1 70 F8c/c70 1.45 0
Table 2.14 Reinforcement design for second floor slab
Lap
Panel moment Km Ks As Asmin Scalc Sprov Remark Length Length lbnetspan
1ys 21.23 35.4 4.1 670.2 216.6 75.0 70 φ8 c/c 70 1.45
DILLA University Department of Civil Engineering Page104
G+3 mixed use building analysis and design 2021
Lap
Panel moment Km Ks As Asmin Scalc Sprov Remark Length Length lbnetspan
9ys 7.105 20.5 4.0 216.4 216.6 232.0 230 φ8 c/c 230 4.59
Yf 8.35 22.2 4.0 255.0 216.6 197.1 190 φ8 c/c 190 4.59 0.32 0.918
Xs 10.32 24.7 4.0 316.0 216.6 159.0 150 φ8 c/c 150 3.26
Xf 14.02 28.8 4.0 435.4 216.6 115.4 110 φ8 c/c 110 3.26 0.32 0.652
10ys 4.315 16.0 4.0 131.1 216.6 232.0 230 φ8 c/c 230 3.99
Yf 2.93 13.2 4.0 89.0 216.6 232.0 230 φ8 c/c 230 3.99 0.32 0.798
Xs 7.31 20.8 4.0 222.7 216.6 225.7 220 φ8 c/c 220 2.81
Xf 4.66 16.6 4.0 141.6 216.6 232.0 230 φ8 c/c 230 2.81 0.32 0.562
11ys 6.25 19.2 3.0 141.8 216.6 232.0 230 φ8 c/c 230 3.99
Yf 5.07 17.3 4.0 154.1 216.6 232.0 230 φ8 c/c 230 3.99 0.32 0.798
Xs 7.31 20.8 4.0 222.7 216.6 225.7 220 φ8 c/c 86 3.26
Xf 6.82 20.1 4.0 207.7 216.6 232.0 230 φ8 c/c 230 3.26 0.32 0.652
12xs 7.39 20.9 4.0 225.2 216.6 223.1 220 φ8 c/c 220 0.63
13ys 5 17.2 4.0 151.9 216.6 232.0 230 φ8 c/c 230 3.99
Yf 3.72 14.8 4.0 113.0 216.6 232.0 230 φ8 c/c 230 3.99 0.32 0.798
Lap
Panel moment Km Ks As Asmin Scalc Sprov Remark Length Length lbnetsp
16ys 12.28 27.0 4.0 379.2 216.6 132.5 130 φ8 c/c 130 5.33
Yf 4.07 15.5 4.0 123.7 216.6 232.0 230 φ8 c/c 230 5.33 0.32 1.066
Xs 10.69 25.2 4.0 328.1 216.6 153.2 150 φ8 c/c 150 3.26
Xf 9.26 23.4 4.0 283.4 216.6 177.3 170 φ8 c/c 170 3.26 0.32 0.652
17ys 12.28 27.0 4.0 379.2 216.6 132.5 130 φ8 c/c 130 5.33
Yf 4.59 16.5 4.0 139.5 216.6 232.0 230 φ8 c/c 230 5.33 0.32 1.066
Xs 9.9 24.2 5.0 379.2 216.6 132.5 130 φ8 c/c 130 3.16
Xf 8.31 22.2 4.0 253.8 216.6 198.0 190 φ8 c/c 190 3.16 0.32 0.632
18ys 12.24 26.9 4.0 377.8 216.6 133.0 230 φ8 c/c230 5.33
Yf 3.74 14.9 4.0 113.6 216.6 232.0 230 φ8 c/c 230 5.33 0.32 1.066
Xs 26.66 39.7 4.2 854.8 216.6 91.9 90 φ8 c/c 90 2.88
Xf 7.01 20.4 4.0 213.5 216.6 232.0 230 φ8 c/c 230 2.88 0.32 0.576
19YS 16.72 31.5 4.0 510.6 216.6 98.4 90 φ8 c/c 90 1.6
XS 29.16 41.5 4.2 943.7 216.6 83.2 80 φ10c/c 80 1.45
Table 2.15 Reinforcement Design For Third and flat slab Floor slab
Lap
Panel moment Km Ks As Asmin Scalc Sprov Remark Length Length lbnet
1ys 21.2 35.4 4.1 670.2 216.6 117.2 110 φ10 C/C110 1.45
xs 26.1 39.3 4.2 832.9 216.6 94.3 90 φ10 C/C90 1.01
2xs 15.0 29.8 4.0 457.0 216.6 110.0 100 φ8 C/C100 1.01
3ys 21.2 35.4 4.1 669.6 216.6 117.3 110 φ10 C/C110 1.35
xs 29.6 41.8 4.2 957.3 216.6 82.0 80 φ10C/C80 1.01
4xs 26.2 39.4 4.2 837.7 216.6 93.8 90 φ10 C/C90 1.45
5ys 3.4 14.1 4.0 102.5 216.6 232.0 230 φ8 C/C230 3.32
yf 3.4 14.2 4.0 103.6 216.6 232.0 230 φ8 C/C230 3.32 0.32 0.664
xs 5.5 18.1 4.0 168.0 216.6 232.0 230 φ8 C/C230 2.81
xf 3.1 13.6 4.0 94.8 216.6 232.0 230 φ8 C/C230 2.81 0.32 0.562
6ys 7.3 20.7 4.0 220.8 216.6 227.5 220 φ8 C/C220 3.32
yf 5.3 17.6 4.0 159.5 216.6 232.0 230 φ8 C/C230 3.32 0.32 0.664
xs 24.6 38.2 4.1 782.8 216.6 100.3 100 φ10 C/C100 3.26
xf 5.6 18.1 4.0 168.9 216.6 232.0 230 φ8 C/C230 3.26 0.32 0.652
7xs 24.6 38.2 4.1 782.8 216.6 100.3 100 φ10 C/C100 1.35
8ys 3.7 14.8 4.0 112.7 216.6 232.0 230 φ8 C/C230 4.59
yf 2.7 12.5 4.0 80.8 216.6 232.0 230 φ8 C/C230 4.59 0.32 0.918
xs 10.3 24.7 4.0 316.0 216.6 159.0 150 φ8 C/C150 2.81
xf 4.7 16.6 4.0 142.0 216.6 232.0 230 φ8 C/C230 2.81 0.32 0.562
Lap
Panel moment Km Ks As Asmin Scalc Sprov Remark Length Length lbnetspan
9ys 7.1 20.5 4.0 216.4 216.6 232.0 230 φ8 C/C230 4.59
yf 8.4 22.3 4.0 256.2 216.6 196.1 190 φ8 C/C190 4.59 0.32 0.918
xs 10.3 24.7 4.0 316.0 216.6 159.0 150 φ8 C/C150 3.26
xf 14.1 28.9 4.0 437.5 216.6 114.8 110 φ8 C/C110 3.26 0.32 0.652
10ys 4.3 16.0 4.0 131.1 216.6 232.0 230 φ8 C/C230 3.99
yf 2.9 13.2 4.0 89.0 216.6 232.0 230 φ8 C/C230 3.99 0.32 0.798
xs 7.3 20.8 4.0 222.7 216.6 225.7 220 φ8 C/C220 2.81
xf 4.7 16.6 4.0 141.6 216.6 232.0 230 φ8 C/C230 2.81 0.32 0.562
11ys 6.3 19.2 3.0 141.8 216.6 232.0 230 φ8 C/C230 3.99
yf 5.1 17.3 4.0 154.1 216.6 232.0 230 φ8 C/C230 3.99 0.32 0.798
xs 7.3 20.8 4.0 222.7 216.6 225.7 220 φ8 C/C220 3.26
xf 6.8 20.1 4.0 207.7 216.6 232.0 230 φ8 C/C230 3.26 0.32 0.652
12xs 7.4 20.9 4.0 225.2 216.6 223.1 220 φ8 C/C220 0.63
13ys 5.0 17.2 4.0 151.9 216.6 232.0 230 φ8 C/C230 3.99
yf 3.7 14.8 4.0 113.0 216.6 232.0 230 φ8 C/C230 3.99 0.32 0.798
xs 26.7 39.7 4.2 854.8 216.6 91.9 90 φ10 C/C90 2.88
xf 5.3 17.6 4.0 159.8 216.6 232.0 230 φ8 C/C230 2.88 0.32 0.576
14xs 26.7 39.7 4.2 854.8 216.6 91.9 90 φ10 C/C90 1.45
15ys 12.3 26.9 4.0 378.9 216.6 132.6 130 φ8 C/C130 5.33
yf 3.6 14.6 4.0 108.8 216.6 232.0 230 φ8 C/C230 5.33 0.32 1.066
xs 9.8 24.0 4.0 298.5 216.6 168.3 160 φ8 C/C160 2.81
xf 6.9 20.2 4.0 211.1 216.6 232.0 230 φ8 C/C230 2.82 0.32 0.564
Lap
Panel moment Km Ks As Asmin Scalc Sprov Remark Length Length lbnetspa
16ys 12.3 27.0 4.0 379.2 216.6 132.5 130 φ8 C/C130 5.33
yf 4.1 15.5 4.0 123.7 216.6 232.0 230 φ8 C/C230 5.33 0.32 1.066
xs 10.7 25.2 4.0 328.1 216.6 153.2 150 φ8 C/C150 3.26
xf 9.3 23.4 4.0 283.4 216.6 177.3 170 φ8 C/C170 3.26 0.32 0.652
17ys 12.3 27.0 4.0 379.2 216.6 132.5 130 φ8 C/C130 5.33
yf 4.6 16.5 4.0 139.5 216.6 232.0 230 φ8 C/C230 5.33 0.32 1.066
xs 9.9 24.2 5.0 379.2 216.6 132.5 130 φ8 C/C130 3.16
xf 8.3 22.2 4.0 253.8 216.6 198.0 190 φ8 C/C190 3.16 0.32 0.632
18ys 12.2 26.9 4.0 377.8 216.6 133.0 130 φ8 C/C130 5.33
yf 3.7 14.9 4.0 113.6 216.6 232.0 230 φ8 C/C230 5.33 0.32 1.066
xs 26.7 39.7 4.2 854.8 216.6 91.9 90 φ10C/C90 2.88
xf 7.0 20.4 4.0 213.5 216.6 232.0 230 φ8 C/C230 2.88 0.32 0.576
19YS 16.7 31.5 4.0 508.0 216.6 98.9 90 φ8 C/C90 1.6
XS 29.2 41.5 4.2 943.7 216.6 83.2 80 φ10 C/C80 1.45
justify above tables
Provide reinforcements and layouts
Make this as CHAPTER THREE
2.2 Stair Case Design
Material
C-25
S-300
fyk Le
d≥ (0.4+0.6 )
400 βa
- Le=4.19m
- Ly/Lx=4.19m/1.15m=3.64 > 2 (one way)
- For end span , Ba=30
300 4190
d≥ (0.4+0.6 )
400 30
d≥118.72 mm
Depth for deflection for the Landing
fyk Le
d≥ (0.4+0.6 )
400 βa
- Le=1.15m
- Ly/Lx=2.4m/1.15m=2.08 > 2 (one way)
- For Cantilever , Ba=12
300
d≥ (0.4+0.6 )
400 12
d≥81.5 mm
dmax=118.72 mm
Overall depth
=140.72 mm
Use D=150 mm
Load computation
DILLA University Department of Civil Engineering Page110
G+3 mixed use building analysis and design 2021
Material Data
16 cm=h Concrete
16 cm=h
Finishing (3 cm)
Cement Screed (2 cm)
No of riser (hcs*tcs*γsc)
D.L of cement screed=
Projected length (12*28 cm)
13(0.16m*0.02m*23KN/m3
=
3.36
=0.285 KN/m
=0.501 KN/m
= 0.786 KN/m
Concrete
L inclined Plastering
L inc
h=2m
𝜃
Lproj=3.36m
D=150mm
Tan =2/3.36
=30.76
Sin =2/Linc
=3.91 m
3
D*L inc*γconc 0.15m*3.91m*24 KN/m
D.L of concrete =
Lprojected = 3.36 m
=4.19 KN/m
3
tpl*Linc*γpl 0.02m*3.91m*23 KN/m
D.L of Plastering =
Lprojected = 3.36 m
=0.535 KN/m
=4.725 KN/m
Concrete (160mm)
Plastering (2cm)
D.L of landing=D.L of finishing + D.L of cement screed + D.L of concrete + D.L of plastering
=tfin* fin+t cs* cs+t c c+tpl * pl
Loading
18.98 KN.m
14.95 KN.m 14.95 KN.m
1 2
DILLA University Department of Civil Engineering Page113
G+3 mixed use building analysis and design 2021
Moment Analysis
+ M at 1=0
14.93*(0.83)*0.83/2+18.98*3.36m*(0.83+3.36/2)+14.93*1.15*(4.19+1.15/2)-R2*4.19m=0
R2*4.19m=247.025 KN.m
R2=58.95 KN
Fy=0 ( +)
R1+R2=14.93 KN/m*0.83 m+18.98 KN/m*3.36 m+14.93 KN/m*1.15m
R1=58.95 KN=93.33 KN
R1=34.38 KN
Analyzing using the method of section,
For Z=0, to Z=0.83m (Z in measured from support 1)
14.95 KN.m
V M
X
34.38
M(x)+14.93 KN/m + x2/2=34.38x
M(x)=34.38x-7.465 x2
o At Z=0, X=0
M(0)=0
o At Z=0.83, x=0.83
M(0.83)=23.39 KN.m
For Z=0.83 to Z=4.19m
14.95 KN.m
V M
X
0.83 m
34.38
14.95 KN.m
M
X
M(x)=-14.93 x2/2
=-7.465 x2
At Z=5.34m, x=0
M(0)=0
At Z=4.93m, x=1.15m
M(1.15)=-9.896 KN.m
9.896 KN.m
1.988 m
0.83 m
1.15
1.988 m
0.83 m
41.79 KN
Stair Case 2
Loading
18.98 KN.m
12.04 KN.m 12.04 KN.m
0.83 m 1.15 m
3,36 m
23.45 KN.m
DILLA University Department of Civil Engineering Page117
G+3 mixed use building analysis and design 2021
B.M.D
35.32 KN.m
d
√M/b
Km
- M is Mmax of all the stair moment
- Mmax=42.72 KN.m
- b=1m,
- Km=57.83 (without moment distribution)
- d=150mm-cover- /2, assuming =14mm
=150mm-15mm-14mm/2
=128mm
√42.72KN.m/1m
d
57.83
d 113.02 mm
Reinforcement Design
Km= √ )/d, Ks
As=Ks*M/d
- To calculate spacing by selecting diameter of bar as
S=1000as/A where as=area of single bar
As=calculated area of steel
S=spacing
- Compare the above result with minimum provision given by our code.
Asmin= min*b*d=0.5/fyk*b*d=0.5*1000*128/300=213.33
smax≤{ ={ =300mm
For analysis to use SAP the dead load and live load should transfer separately:
=VD+VL
Where, VD=Pdex+D.L*Lx
Vx
Vy Vy
Vx
N.B For analysis we transfer unfactored dead load and live load because of we factor load in SAP
analysis.
VDX=𝛽Vx*D.L*Lx
VDY= 𝛽Vy*D.L*Lx
VLX=𝛽Vx*L.L*Lx
VLY= 𝛽Vy*L.L*L
Support Span
Panel Condition Shear Ratio D.L Lx βVx βVy Vx Vy 0.92Vx 0.92Vy
F5 Vx1 0.38 5.66 5.21
S5 Type 1 Vx2 1.18 5.25 2.81 0.38 5.66 5.21
T5 Vy1 0.33 4.87 4.48
Vy2 0.33 4.87 4.48
Vx1 0.34 6.21 5.71
T6 Type 1 Vx2 1.02 5.67 3.26 0.34 6.21 5.71
Vy1 0.33 6.10 5.61
Support Span
Panel Condition Shear Ratio L.L Lx βVx βVy Vx Vy 0.92Vx 0.92Vy
F5 Vx1 0.38 2.16 1.99
S5 Type 1 Vx2 1.18 2 2.81 0.38 2.16 1.99
T5 Vy1 0.33 1.85 1.71
Vy2 0.33 1.85 1.71
Vx1 0.34 5.48 5.04
T6 Type 1 Vx2 1.02 5 3.26 0.34 5.48 5.04
Vy1 0.33 5.38 4.95
Vy2 0.33 5.38 4.95
F8 Vx1 0.466 3.93 3.61
S8 Type 1 Vx2 1.13 3 2.81 0.466 3.93 3.61
T8 Vy1 0.33 2.78 2.56
Vy2 0.33 2.78 2.56
F9 Vx1 0.522 8.51 7.83
S9 Type 3 Vx2 1.41 5 3.26 0.322 5.25 4.83
T9 Vy1 0.36 5.87 5.40
Vy2 0.36 5.87 5.40
F10 Vx1 0.434 6.10 5.61
S10 Type 1 Vx2 1.42 5 2.81 0.434 6.10 5.61
T10 Vy1 0.33 4.64 4.27
Vy2 0.33 4.68 4.30
F11 Vx1 0.394 6.42 5.91
S11 Type 1 Vx2 1.22 5 3.26 0.394 6.42 5.91
T11 Vy1 0.33 5.38 4.95
Vy2 0.33 5.38 4.95
F13 Vx1 0.448 6.45 5.94
S13 Type 2 Vx2 1.38 5 2.88 0.448 6.45 5.94
T13 Vy1 0.36 5.18 4.77
Vy2 0.24 3.46 3.18
F15 Vx1 0.492 6.91 6.36
S15 Type 1 Vx2 1.9 5 2.81 0.492 6.91 6.36
T15 Vy1 0.33 4.64 4.27
Vy2 0.33 4.64 4.27
F16 Vx1 0.465 7.58 6.97
S16 Type 1 Vx2 1.63 5 3.26 0.465 7.58 6.97
T16 Vy1 0.33 5.38 4.95
Vy2 0.33 5.38 4.95
F17 Vx1 0.473 7.47 6.88
S17 Type 1 Vx2 1.69 5 3.16 0.473 7.47 6.88
D.L=5.67 KN/m2*1m=5.67KN/m
Boundary Condition
B A
D D
C C
B A
Strip A-A
Dead Load
9.78 KN
D.L=5.67 KN/m
RA K1*w=0.49*5. 67=2.78
KN/m
RA=9.17 KN
Live Load
L.L=3 KN/m
RA K1*w=0.49*3=1.47 KN/m
RA= -0.3225 KN
Strip B-B
Dead Load
9.78 KN
(1+K2)w (1+2K2)w
RB
((1+2K2)w=(1+2*0.374)*5.67=9.91 KN/m
RB(D.L)=19.24 KN
Live Load
(1+K2)w (1+2K2)w
RB(D.L)=5.001 KN
Strip C-C
Dead Load
9.78 KN
Rc K2 W
=8.19 K
Live Load
Rc K2 W
Rc = - (1.12 KN/m)*0.75m
= -0.84 KN
Strip D-D
Dead Load
(1+K1 )W 9.78 KN
RD K2 W
K2W=2.12 KN/m
=20.44 KN
Live Load
(1+K1 )W=4.47 KN.m
RD K2W=1.12 KN.m
=5.64 KN
Strip A-A
Dead Load
9.78 KN
D.L=5.67 KN/m
RA=9.17 KN
Live Load
L.L=5 KN/m
RA K1*w=0.49*5=2.45 KN/m
RA= -0.54 KN
Strip B-B
Dead Load
9.78 KN
(1+2K2)W
(1+K2)
W
RB
((1+2K2)w=(1+2*0.412)*5.67=10.34 KN/m
RB(D.L)=19.616 KN
Live Load
(1+K2) (1+2K2)w
w
RB
RB(D.L)=8.67 KN
Strip C-C
Dead Load
9.78 KN
Rc K2W=0.412*5.67=2.33 KN/m
=8.19 KN
Live Load
Rc K2w=2.06 KN/m
Rc = - (2.06 KN/m)*0.75m
= -1.54 KN
Strip D-D
Dead Load
(1+K1 )W 9.78 KN
RD K2 W
K2W=(0.412*(5.67)=2.33 KN/m
=19.44 KN
Live Load
(1+K1 )W=(1.49*5)=7.06 KN/m
RD K2W=0.412*5=2.06 KN/m
=7.986 KN
Panel F6 and S6
L.L=2 KN/m
D.L=9.46 KN/m
X-direction
Middle Strip (Dead Load)
W=9.46 KN/m
Mxs Mxs
RA RB
RB=RA=9.46 KN/m*3.26m/2=15.42 KN
W=2 KN/m
Mxs Mxs
RA RB
RB=RA=2 KN/m*3.26m/2=3.26 KN
RA RB
RA=RB=3.85 KN
Live Load
RA=RB=0.815 KN
Y-direction
Middle Strip
W W
Dead Load
Live Load
RA=RB=(3.85 KN)
Live Load
RA=RB=(0.815 KN)
Panel F-9
D.L= 6.02 KN/m
L.L=4 KN/m
Strip A-A
Dead Load
4.89 KN
W=6.02 KN/m
RA
K1W=0.229*6.02 KN/m=1.38
KN/m
RA=8.97 KN
Live Load
W=4 KN/m
RA=2.71 KN
Strip B-B
(1-K1)W
RA=RB=(2.81*4.64 KN/m)/2=6.52 KN
RA=RB=(2.81*3.08 KN/m)/2=4.33 KN
Panel S9, T9
D.L= 6.02 KN/m + 1.95 KN/m=7.97 KN/m
L.L=4 KN/m
Strip A-A
Dead Load
9.78 KN
W=7.97 KN/m
RA
K1W=0.612*7.97 KN/m=4.88 KN/m
RA=14.09 KN
Live Load
W=4 KN/m
RA
K1W=0.612*4 KN/m=2.45 KN/m
RA=1.56 KN
Strip B-B
(1-K1)W
Load
RA=RB=(2.81*3.09 KN/m)/2=4.34 KN
RA=RB=(2.81*1.55 KN/m)/2=2.18 KN
Panel F-8
D.L=4 KN/m
L.L=6.02 KN/m
Strip A-A
The transfer is the same to F20 for Strip A-A.
Strip B-B
(1-K1)W
RA RB
Panel S8, T8
D.L=7.97 KN/m
L.L=4 KN/m
Strip A-A
Load transfer is same to strip A-A of panel S20, T20.
Strip B-B
(1-K1)W
RA RB
Panel F9,S9,T9
D.L=6.02 KN/m
L.L=4 KN/m
Strip A-A
Transfer of strip A-A is the same with that of F20
RA= RB=8.97 KN
Live Load
RA= RB=2.71 KN
Strip B-B
(1-K1)W
RA RB
L.L=4 KN/m
Strip A-A
Transfer of strip A-A is the same with that of S21, T21
RA= RB=14.09 KN
Live Load
RA= RB=1.56 KN
Strip B-B
(1-K1)W
RA RB
Panel F11,S11,T11
D.L= 6.02 KN/m
L.L=4 KN/m
Strip A-A
Dead Load: RA= RB=8.97 KN
Strip B-B
(1-K1)W
RA RB
L.L=4 KN/m
Strip A-A
It’s the same to that of S22 and T22.
Strip B-B
(1-K1)W
RA RB
Panel F13,S13,T13
D.L= 6.02 KN/m
L.L=4 KPN/m
W1=3.31 KN/m
W2=4/2.22=1.8 KN/m
Strip A-A
Deal Load transfer
4.89 KN
2.71 KN/m
RA
K2W2=0.74*2.71=2 KN/m
1.8 KN/m
RA
1.33 KN/m
Strip B-B
Dead Load
4.89 KN
(1+K1)W1
RA
K 2 W2
: K2W2=0.6*2.71=1.62 KN/m
: K2W2=0.6*1.8=1.08 KN/m
Strip C-C
4.89 KN
(1+2K2)W2
(1+K2)W2
RA
: (1+2K2)W2=6.72 KN/m
: (1+2K2)W2=4.46 KN/m
Dead Load
Live Load
Strip D-D
4.89 KN
W1
RA
K1 W 1
: K1W1=1.32 KN/m
Dead Load
Live Load
L.L=5 KN/m
Pew=9.78 KN
Strip A-A
Dead Load Transfer
Strip B-B
Dead Load
9.78 KN
RA
(1+K1)W1
K 2 W2
: K2W2=0.74*2.55=1.89 KN/m
: K2W2=0.6*2.25=1.66 KN/m
Strip C-C
9.78 KN
(1+2K2)W2
(1+K2)W2
RA
: (1+2K2)W2=6.32 KN/m
: (1+2K2)W2=5.58 KN/m
Dead Load
Live Load
Strip D-D
9.78 KN
W1
RA
K1 W 1
Dead Load
Live Load
W2
W1 W1
A B
L.L=5 KN/m ,
L.L=5 KN/m
+ MA=0
RB=24.42 KN
RA+RB=38.94 KN
RA=14.52 KN
RB=17.01 KN
RA+RB=26.76 KN
RA=9.69 KN
RA is transferred to grade beam and RB is transferred to landing beam located at height of 1.5m from
ground.
Stair 2
W2
W1 W1
A
B
L.L=5 KN/m ,
L.L=5 KN/m
RA=11.91 KN
RB=14.79 KN
5.75 KN
11.91 KN
We can calculate dead load transfer from direct reduction of shear force diagram of design load (done
before) and live load.
RA=(PdA-D.LA*1.3)/1.6
=18.77 KN
RB=(PdB-D.LB*1.3)/1.6
RB=21.42
RB is transferred to landing beam and RA is transferred to 1st, 2nd, 3rd floor beams.
Material data:
Thickness of HCB = 200mm,for external wall
= 150mm,for internal wall
Thickness of plastering = 20mm
Unit weigth of HCB = 14 KN/m3
Unit weigth of plastering = 23KN/m3
Dead load of external wall = Dead load of plaster plus Dead load of HCB
Table2.18 Location of wall and respective Load (label all tables in this way, this is good
level Location Load(KN/m) designation)
ground floor on axis-5 11.74
on axis-4,3&2 9.86
on axis-B( b/n axis 1 & 3) 9.86
on axis-c 9.86
1st floor on axis-5 8.47
on axis-4,( b/n axis a &b') 7.3
on axis-3,( b/n axis b&c) 7.3
on axis-2 7.3
on axis-B( b/n axis 1 & 2) 7.3
on axis-b& c 7.3
2nd fllor on axis-4&3 7.3
on axis-B( b/n axis 1' & 2;b/n 4&5) 7.3
on axis-b& c 7.3
3rd floor on axis-5 8.47
DILLA University Department of Civil Engineering Page150
G+3 mixed use building analysis and design 2021
on axis-4,3&2 7.3
on axis-B( b/n axis 1' & 2;b/n 4&5) 7.3
on axis-b& c 7.3
??? chapter 3, ??chapter 4, 4.1, ...
4.2 Beam Design
Beams should be design in such a way that they can carry their own weight in addition to
transferring the load from slabs or roofs (in top tie beams) to the column without
excessive deflection due to moment or cracks from shear force.
We have the following given dimensions
Top tie beam-20cm*30cm
Intermediate beam-25cm*30cm
Grade beam-40cm*30
Material Data
c-25
s-300
class-I work
d≥(0.4+0.6*300/400)*5330/24
d≥188.77mm
b) For cantilever beams; Ba=10 & using maximum Le=1600 mm for all of the cantilever
beams
d≥(0.4+0.6*300/400)* 1600mm/10
d≥136 mm
=D-25mm-8mm-20mm-20/2
=D-63mm
Design constants
o Fcd=0.85fck/ c=0.85*(25/1.25)Mpa/1.5=11.33 Mpa
o Fyd=fyk/ s=300 Mpa/1.15=260.87 Mpa
o M=fyd/0.8*fcd=260.87 Mpa/0.8*11.33Mpa=28.78
o C1=2.5/m=2.5/28.78=0.0869
o C2=0.32m2fcd=0.32*(28.78)2*11.33 Mpa
=3003.04 Mpa
o c=0.0035
o s=fyd/E=260.87 Mpa/200*103Mpa=0.0013
o b=0.8* c*fcd/( c+ s)fyd=(0.8*0.0035*(11.33Mpa))/(260.87
Mpa*0.0035+0.0013)=0.02997
o max=0.75* b=0.0253
o min=0.5/fyk=0.5/300=0.00167
Since the depth is fixed architecturally for beams with > 𝑎𝑥, i.e the section doesn’t satisfy depth for
flexure, the section will be provided with double reinforcement.
Reinforcement Design
o if calculated> max, double reinforcement.
o If min< calculated< max, single reinforcement.
o If calculated< min, use min.
=0.5[C1±√c12-4 / d2c2]
Area of steel
As1= max*b*d
As2=M2/fyd(d-dc’),
fs'= ’Es<fyd
s
s’= c(x-dc’)/x x= md
Beam on Axis
5-5
location bw moment M1 M2 As1 As2 As tot As' Remark(As tot) Remark(As')
A--B 0.25 228.44 129.38 99.06 2118.88 1287.24 3406.11 1287.24 6Ø28 3Ø24
B--C 0.25 191.09 129.38 61.71 2118.88 801.88 2920.76 801.88 5Ø28 4Ø18
C--D 0.25 193.96 129.38 64.58 2118.88 839.18 2958.05 839.18 5Ø28 4Ø18
D--E 0.25 228.01 129.38 98.63 2118.88 1281.65 3400.52 1281.65 6Ø28 3Ø24
using ∅28 , d=400mm – 25mm – 28mm =347mm for grade - 4th floor beam
NB; All the beam shall be provided with at least the minimum web reinforcement
=0.4/300=0.00133
K1=1+50*0.00133 =1.067
Maximum spacing
=173.5mm
=74.1mm
=104.1mm
Using the above criteria we design our beam for shear as tabulated below
- Columns are designed so as to transfer the load from beams and slabs (in flat slab)
down to the foundation without buckling or crashing.
- Before designing an isolated column, the column should be checked whether it is
Sway or non-Sway
Short or long (slenderness)
Because the column should resist the moment due to iss slenderness and its sway mode, in addition to
its 1st order moments.
- To determine the nature of the frame we substitute the beams and columns by one
substitute frames.
Substitute column
- The value of the axial force on each substitute frame column is obtained by adding the
axial load of each column for the story including self weight.
- The value of the stiffness coefficients of the substitute frame is given by
For beams=2∑Kbi
For Column=∑Kci
- The effective length of substitute frame is computed for each storey assuming as sway
frame and given as follows
For Non Sway
Le/L= +0.4/( m+0.8) ≥0.7L
For Sway mode
7.5+4 1+ 2 +1.6 1* 2
Le/L=√ 7.4+ 1+ 2
≥1.15
- For the theoretical model shown in fig. below, the stiffness coefficient 1, 2 and m are
obtainded as follows.
Kc2
K12 K11
Kc
K22 K21
Kc2
αm= (α1+α2)/2
where
The above approximate equation for effective length calculation is applica le for values of α1 and α2
not exceeding 10.
-
-
DILLA University Department of Civil Engineering Page169
G+3 mixed use building analysis and design 2021
- Moment of inertial of the cross section is determined as follows.
As/2 d
S
As/2
Is=[n(π*r4/4)+π*r2*d2]
- Reinforcing the substitute column using the biaxial chart using the following formulas
V=Nsd*103/(Ac*fcd)
N=Mdl*106/(Ac*fcd*S)
W=Astot*fyd/(Ac*fcd)
Astot=W*Ac*fcd/fyd
Determination of Ncr
- The buckling load of a story may be assumed to be equal to that of the substitute beam-
column.
DILLA University Department of Civil Engineering Page170
G+3 mixed use building analysis and design 2021
Ncr=πEIe/Le2.
Where,
- EIe is effective stiffness of the substitute column design using the equivalent
reinforcement area.
- Le effective length.
EIe=0.2EcIc+EsIs≥0.4 EcIc
For this purpose Ec=1100 fcd
- Ic,Is moment of inertia of concrete and steel sections respectively of substitute column,
with respect to centroid of concrete section.
As calculation
Circular column may be replaced by square column of the same x-sectional area concrete cover and
bar arrangement shall be taken to be the same as those of actual columns, in case of rectangular
column.
The equivalent column dimension calculated by summing all column area of story. And As tot in the
substitute column to be used for calculating Is and Mbd in above may be obtained by designing the
substitute column at each floor level to carry the story design axial load and amplified sway mode.
foundation 0.0557072 0.905908 0.2 6653.975 10ɸ32 1.23E+08 4.89E+10 2.44E+14 3.59E+08 0.021915 Non-sway
ground 0.103018 0.785722 0.2 6653.975 10ɸ32 1.23E+08 4.89E+10 2.44E+14 88242418 0.077277 Non-sway
1st 0.0823288 0.554297 min 6128 8ɸ32 1.22E+08 4.89E+10 2.44E+14 1.39E+08 0.034516 Non-sway
2nd 0.0620929 0.36127 min 6128 8ɸ32 1.22E+08 4.89E+10 2.44E+14 1.35E+08 0.023213 Non-sway
3rd 0.0422346 0.18979 min 6128 8ɸ32 1.22E+08 4.89E+10 2.44E+14 1.35E+08 0.012195 Non-sway
AXIS B-B
level α1 α2 αm H L Le Nsd HL Mdl Ac h
foundation 1.166 1 1.083 429.11 2 2.732325 7003.459 858.22 420.387 800000 894.42719
ground 1.814 1.166 1.49 425.61 4 5.922162 6399.652 1702.44 789.7957 800000 894.42719
1st 2.073 1.814 1.9435 437.42 3 4.795123 4796.854 1312.26 638.942 800000 894.42719
2nd 2.073 2.073 2.073 329.3 3 4.89138 3296.246 987.9 493.95 800000 894.42719
3rd 2.073 2.073 2.073 224.2 3 4.89138 1767.574 672.6 336.3 800000 894.42719
level µ V w As ɸ Is Ic Eie Ncr Ncd/Ncr condition
foundation 0.0518542 0.772668 min 6400 8ɸ32 1.29E+08 5.33E+10 2.66E+14 3.51E+08 0.019945 Non-sway
ground 0.0974204 0.706052 0.1 6400 8ɸ32 1.29E+08 5.33E+10 2.66E+14 74744644 0.08562 Non-sway
DILLA University Department of Civil Engineering Page172
G+3 mixed use building analysis and design 2021
1st 0.0788128 0.52922 min 6400 8ɸ32 1.29E+08 5.33E+10 2.66E+14 1.14E+08 0.042074 Non-sway
2nd 0.0609282 0.363664 min 6400 8ɸ32 1.29E+08 5.33E+10 2.66E+14 1.1E+08 0.030084 Non-sway
3rd 0.0414822 0.19501 min 6400 8ɸ32 1.29E+08 5.33E+10 2.66E+14 1.1E+08 0.016132 Non-sway
foundation 0.0506568 0.865736 min 6128 8ɸ32 1.22E+08 4.89E+10 2.44E+14 3.22E+08 0.023319 Non-sway
ground 0.0957812 0.79351 min 6128 8ɸ32 1.22E+08 4.89E+10 2.44E+14 68576413 0.100424 Non-sway
1st 0.077791 0.583765 min 6128 8ɸ32 1.22E+08 4.89E+10 2.44E+14 1.05E+08 0.048474 Non-sway
2nd 0.059192 0.395268 min 6128 8ɸ32 1.22E+08 4.89E+10 2.44E+14 1E+08 0.034155 Non-sway
3rd 0.0399715 0.21556 min 6128 8ɸ32 1.22E+08 4.89E+10 2.44E+14 1E+08 0.018627 Non-sway
AXIS C-C
level α1 α2 αm H L Le Nsd HL Mdl Ac h
foundation 1.693 1 1.3465 230.89 2 2.882499 4715.24 461.78 212.4836 480000 692.82032
ground 2.634 1.693 2.1635 229.74 4 6.610053 4361.65 918.96 417.612 480000 692.82032
1st 3.01 2.634 2.822 243.49 3 5.414647 3284.19 730.47 353.4411 480000 692.82032
2nd 3.01 3.01 3.01 185.33 3 5.538231 2281.11 555.99 277.995 480000 692.82032
3rd 3.01 3.01 3.01 135.42 3 5.538231 1254.59 406.26 203.13 480000 692.82032
level µ V w As ɸ Is Ic Eie Ncr Ncd/Ncr condition
foundation 0.0563941 0.867027 min 3840 10ɸ24 41237878 1.92E+10 5.61E+13 66577333 0.070824 Non-sway
ground 0.1108361 0.80201 min 3840 10ɸ24 41237878 1.92E+10 5.61E+13 12660616 0.344505 Sway
1st 0.0938048 0.603889 min 3840 10ɸ24 41237878 1.92E+10 5.61E+13 18867938 0.174062 Sway
2nd 0.0737811 0.419445 min 3840 10ɸ24 41237878 1.92E+10 5.61E+13 18035268 0.126481 Sway
3rd 0.0539116 0.230691 min 3840 10ɸ24 41237878 1.92E+10 5.61E+13 18035268 0.069563 Non-sway
AXIS 1-1
level α1 α2 αm H L Le Nsd HL Mdl Ac h
foundation 0.86 1 0.93 343.86 2 2.641212 4009.753 687.72 349.9847 480000 692.82032
ground 1.338 0.86 1.099 332.77 4 5.483357 3460.208 1331.08 626.7344 480000 692.82032
1st 1.529 1.338 1.4335 314.1 3 4.395589 2477.25 942.3 461.0012 480000 692.82032
2nd 1.529 1.529 1.529 234.92 3 4.47312 1484.01 704.76 352.38 480000 692.82032
3rd 1.529 1.529 1.529 150.53 3 4.47312 834.727 451.59 225.795 480000 692.82032
level µ V w As ɸ Is Ic Ncr Ncd/Ncr condition
foundation 0.0928875 0.737304 0.1 3840 10ɸ24 41617259 1.92E+10 9.57E+13 1.35E+08 0.02964 non sway
ground 0.1663381 0.636255 0.2 4169.433 10ɸ24 41617259 1.92E+10 9.57E+13 31387023 0.110243 sway
1st 0.1223518 0.455511 min 3840 10ɸ24 41617259 1.92E+10 9.57E+13 48843752 0.050718 non sway
2nd 0.0935232 0.272876 min 3840 10ɸ24 41617259 1.92E+10 9.57E+13 47165242 0.031464 non sway
3rd 0.059927 0.153488 min 3840 10ɸ24 41617259 1.92E+10 9.57E+13 47165242 0.017698 non sway
AXIS 2-2
level α1 α2 αm H L Le Nsd HL Mdl Ac h
foundation 0.86 1 0.93 353.67 2 2.641212 4185.036 707.34 359.9695 480000 692.82032
ground 1.338 0.86 1.099 333.83 4 5.483357 3636.333 1335.32 628.7308 480000 692.82032
1st 1.529 1.338 1.4335 315.039 3 4.395589 2655.37 945.117 462.3793 480000 692.82032
2nd 1.529 1.529 1.529 238.31 3 4.47312 1484.01 714.93 357.465 480000 692.82032
692.8203
3rd 1.529 1.529 1.529 159.46 3 4.47312 942.079 478.38 239.19 480000 AXIS 2-22
Level µ V w As ɸ Is Ic Ncr Ncd/Ncr condition
foundation 0.0955375 0.769534 min 3840 10ɸ24 41617259 1.92E+10 9.57E+13 1.35E+08 0.030936 non sway
ground 0.166868 0.66864 0.2 4169.433 10ɸ24 41617259 1.92E+10 9.57E+13 31387023 0.115855 sway
1st 0.1227175 0.488263 min 3840 10ɸ24 41617259 1.92E+10 9.57E+13 48843752 0.054365 non sway
2nd 0.0948728 0.272876 min 3840 10ɸ24 41617259 1.92E+10 9.57E+13 47165242 0.031464 non sway
3rd 0.0634821 0.173227 min 3840 10ɸ24 41617259 1.92E+10 9.57E+13 47165242 0.019974 non sway
level α1 α2 αm H L Le Nsd HL Mdl Ac h
foundation 1.232 1 1.116 727.44 2 2.751581 6726.16 1454.88 706.9388 800000 894.42719
ground 1.971 1.232 1.6015 757.09 4 6.041457 5972.006 3028.36 1392.591 800000 894.42719
1st 1.971 1.971 1.971 671.35 3 4.815724 4497.104 2014.05 1007.025 800000 894.42719
2nd 1.971 1.971 1.971 589.17 3 4.815724 3000.58 1767.51 883.755 800000 894.42719
3rd 1.971 1.971 1.971 426.93 3 4.815724 1646.751 1280.79 640.395 800000 894.42719
ground 1.9713 1.232 1.60165 594.64 4 6.041616 7893.01 2378.56 1093.745 766000 875.21426
1st 1.9713 1.9713 1.9713 567.13 3 4.815949 5862.694 1701.39 850.695 766000 875.21426
2nd 1.9713 1.9713 1.9713 435.47 3 4.815949 3985.139 1306.41 653.205 766000 875.21426
3rd 1.9713 1.9713 1.9713 288.49 3 4.815949 2142.244 865.47 432.735 766000 875.21426
level µ V w As ɸ Is Ic Ncr Ncd/Ncr condition
foundation 0.0806889 0.996741 0.25 8317.15 12ɸ32 1.23E+08 4.89E+10 2.44E+14 3.17E+08 0.027251 non sway
ground 0.1439936 0.909461 0.35 11644.01 16ɸ32 1.24E+08 4.89E+10 2.44E+14 65843360 0.119876 sway
1st 0.1119956 0.675521 min 6128 8ɸ32 1.23E+08 4.89E+10 2.44E+14 1.04E+08 0.056577 non sway
2nd 0.0859956 0.459182 min 6128 8ɸ32 1.23E+08 4.89E+10 2.44E+14 1.04E+08 0.038458 non sway
3rd 0.0569704 0.246837 min 6128 8ɸ32 1.23E+08 4.89E+10 2.44E+14 1.04E+08 0.020674 non sway
AXIS 5-5
level α1 α2 αm H L Le Nsd HL Mdl Ac h
foundation 0.6532 1 0.8266 625.92 2 2.577813 8084.55 1251.84 654.2832 731300 855.1608
ground 1.016 0.6532 0.8346 601.16 4 5.165547 7364.65 2404.64 1145.443 731300 855.1608
1st 1.1612 1.016 1.0886 555.87 3 4.103403 5277.03 1667.61 818.9994 731300 855.1608
2nd 1.1612 1.1612 1.1612 415.18 3 4.16661 3678.934 1245.54 622.77 731300 855.1608
3rd 1.1612 1.1612 1.1612 262.43 3 4.16661 1946.56 787.29 393.645 731300 855.1608
level µ V w As ɸ Is Ic Ncr Ncd/Ncr condition
foundation 0.0923406 0.975732 0.2 6352.305 8ɸ32 1.17E+08 4.46E+10 2.22E+14 3.3E+08 0.024525 nonsway
ground 0.1616591 0.888846 0.3 9528.457 12ɸ32 1.17E+08 4.46E+10 2.22E+14 82095449 0.089708 nonsway
1st 0.1155873 0.636889 min 5850.4 8ɸ32 1.17E+08 4.46E+10 2.22E+14 1.3E+08 0.040563 nonsway
2nd 0.087893 0.444014 min 5850.4 8ɸ32 1.17E+08 4.46E+10 2.22E+14 1.26E+08 0.029157 nonsway
3rd 0.0555561 0.234932 min 5850.4 8ɸ32 1.17E+08 4.46E+10 2.22E+14 1.26E+08 0.015427 nonsway
Slendernes ratio
- It is used to determine whether the column’s short or slender.
1) For isolated column, slenderness ratio is defined by
=Le/i
Where,
K1 is the total lateral stiffness of the columns of story with modulus of elasticity taken as unity.
L is story height.
Limit of slenderness
- Slenderness ration of concrete column shall not exceed 140.
- Second order moment in all column can be ignored if
a) For sway frames the greater of
≤25
≤15/√ d , Vd=Nsd/(fcd*Ac)
b) For non sway frames
≤50-25*M1/M2
Where, M1 and M2 are the 1st order moment (calculated) at the ends, M2 being always positive and
greater in Magnitude than M1, and M1 being positive if member is bent in single curvature and negative
if bent in double curvature.
Foundation -69.100 139.840 1507.94 766000 2.0 3141.60 1.000 2.312 1.656 1.674 6.627 62.353 short
-
Ground 178.570 216.510 1295.21 766000 4.0 1570.80 2.312 3.597 2.954 3.574 14.145 70.619 short
-
Frist 147.780 165.980 915.56 766000 3.0 2094.35 3.597 4.110 3.854 2.742 10.853 72.259 short
-
Second 100.480 127.510 584.39 766000 3.0 2094.35 4.110 4.110 4.110 2.756 10.907 69.700 short
Third -56.050 85.390 307.33 766000 3.0 2094.35 4.110 4.110 4.110 2.756 10.907 66.410 short
Third -26.670 62.180 249.52 800000 3.0 3555.50 7.083 7.083 7.083 2.848 11.029 60.723 short
COL C-5 calculated LIMIT
Level M1 M2 P Ac L Σki α1 α2 αm Le(nonsway) λ(nonsway) λ(nonsway) Type
foundation 10.020 108.310 1616.59 766000 2.0 5333.00 1.000 6.396 3.698 1.822 7.212 47.687 short
-
Ground 106.900 153.330 1517.80 766000 4.0 2666.65 6.396 9.952 8.174 3.822 15.126 67.430 short
Frist -84.780 116.760 1105.05 766000 3.0 3555.50 9.952 11.373 10.662 2.895 11.460 68.153 short
Second -61.700 100.100 771.74 766000 3.0 3555.50 11.373 11.373 11.373 2.901 11.484 65.410 short
Third -53.560 93.520 407.90 766000 3.0 3555.50 11.373 11.373 11.373 2.901 11.484 64.318 short
COL C-4 calculated LIMIT
Level M1 M2 P Ac L Σki α1 α2 αm Le(nonsway) λ(nonsway) λ(nonsway) Type
foundation -60.700 93.740 1676.26 766000 2.0 5333.00 1.000 1.613 1.307 1.620 6.413 66.188 short
-
Ground 133.480 147.820 1596.93 766000 4.0 2666.65 1.613 2.510 2.061 3.441 13.619 72.575 short
-
Frist 139.070 141.040 1206.54 766000 3.0 3555.50 2.510 2.868 2.689 2.656 10.513 74.651 short
Second -90.970 109.590 828.72 766000 3.0 3555.50 2.868 2.868 2.868 2.673 10.579 70.752 short
Third -67.600 83.850 450.98 766000 3.0 3555.50 2.868 2.868 2.868 2.673 10.579 70.155 short
foundation -70.490 140.100 1376.77 766000 2.0 5333.00 1.000 2.312 1.656 1.674 6.627 62.579 short
-
Ground 172.290 215.220 1194.99 766000 4.0 2666.65 2.312 3.597 2.954 3.574 14.145 70.013 short
-
Frist 160.310 163.800 853.04 766000 3.0 3555.50 3.597 4.110 3.854 2.742 10.853 74.467 short
Second -91.760 122.530 558.76 766000 3.0 3555.50 4.110 4.110 4.110 2.756 10.907 68.722 short
Third 48.870 77.770 304.70 766000 3.0 3555.50 4.110 4.110 4.110 2.756 10.907 34.290 short
COL C-1 calculated LIMIT
Level M1 M2 P Ac L Σki α1 α2 αm Le(nonsway) λ(nonsway) λ(nonsway) Type
foundation -18.590 117.690 1501.04 766000 2.0 5333.00 1.000 3.984 2.492 1.757 6.954 53.949 short
-
Ground 120.630 165.310 1328.80 766000 4.0 2666.65 3.984 6.197 5.091 3.728 14.757 68.243 short
Frist -87.660 113.370 940.80 766000 3.0 3555.50 6.197 7.083 6.640 2.839 11.236 69.331 short
Second -54.630 85.910 596.32 766000 3.0 3555.50 7.083 7.083 7.083 2.848 11.271 65.897 short
Third -21.530 57.100 316.66 766000 3.0 3555.50 7.083 7.083 7.083 2.848 11.271 59.426 short
Third -57.380 89.160 504.70 480000 3.0 2133.33 4.870 4.870 4.870 2.788 13.942 66.089 short
Frist -104.220 141.890 1068.45 160000 3.0 2094.35 5.995 5.995 5.995 2.823 24.451 68.363 short
Second -78.130 113.220 710.29 160000 3.0 2094.35 5.995 5.995 5.995 2.823 24.451 67.252 short
Third -41.540 82.370 377.29 160000 3.0 2094.35 5.995 5.995 5.995 2.823 24.451 62.608 short
COL A-3 calculated LIMIT
Level M1 M2 P Ac L Σki α1 α2 αm Le(nonsway) λ(nonsway) λ(nonsway) Type
Foundation -52.880 174.810 1580.85 160000 2.0 3141.60 1.000 3.747 2.373 1.748 15.137 57.562 short
Ground -154.890 213.560 1363.50 160000 4.0 1570.80 3.747 5.995 4.871 3.718 32.198 68.132 short
Frist -112.970 146.360 976.07 160000 3.0 2094.35 5.995 5.995 5.995 2.823 24.451 69.297 short
Second -70.100 104.800 618.00 160000 3.0 2094.35 5.995 5.995 5.995 2.823 24.451 66.722 short
Third -47.260 81.280 331.96 160000 3.0 2094.35 5.995 5.995 5.995 2.823 24.451 64.536 short
Second -60.910 79.720 689.720 -0.088 0.116 0.034 0.046 0.046 31.888
Third -47.530 71.950 362.500 -0.131 0.198 0.067 0.079 0.079 28.780
COL A-4
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -55.830 134.730 1725.430 -0.032 0.078 0.034 0.031 0.034 58.506
Ground -170.260 206.980 1500.850 -0.113 0.138 0.037 0.055 0.055 82.792
Frist -143.820 163.230 1068.450 -0.135 0.153 0.038 0.061 0.061 65.292
Second -97.690 128.120 710.290 -0.138 0.180 0.053 0.072 0.072 51.248
Third -64.820 98.570 377.290 -0.172 0.261 0.088 0.105 0.105 39.428
COL A-3
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -57.660 134.950 1580.850 -0.036 0.085 0.037 0.034 0.037 57.906
Ground -170.260 206.980 1363.500 -0.125 0.152 0.041 0.061 0.061 82.792
Frist -143.820 163.230 976.070 -0.147 0.167 0.041 0.067 0.067 65.292
Second -97.690 128.120 618.000 -0.158 0.207 0.061 0.083 0.083 51.248
Third -64.820 98.570 331.960 -0.195 0.297 0.100 0.119 0.119 39.428
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -69.100 139.840 1507.940 -0.046 0.093 0.037 0.037 0.037 56.264
Ground -178.570 216.510 1295.210 -0.138 0.167 0.045 0.067 0.067 86.604
Frist -147.780 165.980 915.560 -0.161 0.181 0.044 0.073 0.073 66.392
Second -100.480 127.510 584.390 -0.172 0.218 0.062 0.087 0.087 51.004
Third -56.050 85.390 307.330 -0.182 0.278 0.094 0.111 0.111 34.156
COL A-1
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation 19.260 116.220 1396.910 0.014 0.083 0.055 0.033 0.055 77.436
Ground -123.420 169.110 1206.370 -0.102 0.140 0.043 0.056 0.056 67.644
Frist -75.920 104.140 848.740 -0.089 0.123 0.038 0.049 0.049 41.656
Second -52.400 84.430 533.000 -0.098 0.158 0.056 0.063 0.063 33.772
Third -22.330 56.830 266.070 -0.084 0.214 0.095 0.085 0.095 25.166
COL B-5
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation 4.810 110.250 1559.640 0.003 0.071 0.044 0.028 0.044 68.074
Ground -107.980 155.520 1457.250 -0.074 0.107 0.034 0.043 0.043 62.208
Frist -78.950 114.580 1071.260 -0.074 0.107 0.035 0.043 0.043 45.832
Second -63.560 97.820 757.650 -0.084 0.129 0.044 0.052 0.052 39.128
Third -48.230 90.390 402.960 -0.120 0.224 0.087 0.090 0.090 36.156
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -61.280 137.510 1579.140 -0.039 0.087 0.037 0.035 0.037 57.994
Ground -166.590 206.840 1484.830 -0.112 0.139 0.039 0.056 0.056 82.736
Frist -142.980 164.830 1151.630 -0.124 0.143 0.036 0.057 0.057 65.932
Second -100.590 131.050 786.610 -0.128 0.167 0.049 0.067 0.067 52.420
Third -65.690 99.340 418.390 -0.157 0.237 0.080 0.095 0.095 39.736
COL B-3
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -61.870 137.790 1406.120 -0.044 0.098 0.041 0.039 0.041 57.926
Ground -151.300 209.810 1291.480 -0.117 0.162 0.051 0.065 0.065 83.924
Frist -137.330 158.240 999.490 -0.137 0.158 0.040 0.063 0.063 63.296
Second -94.520 122.450 682.510 -0.138 0.179 0.052 0.072 0.072 48.980
Third -53.460 84.900 366.660 -0.146 0.232 0.081 0.093 0.093 33.960
COL B-2
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -72.640 140.410 1324.830 -0.055 0.106 0.042 0.042 0.042 56.164
Ground -175.240 215.930 1195.340 -0.147 0.181 0.050 0.072 0.072 86.372
Frist -144.730 162.830 886.770 -0.163 0.184 0.045 0.073 0.073 65.132
Second -99.040 128.510 614.790 -0.161 0.209 0.061 0.084 0.084 51.404
Third 57.530 86.430 330.050 0.174 0.262 0.227 0.105 0.227 74.870
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -21.810 117.270 1133.760 -0.019 0.103 0.054 0.041 0.054 61.638
Ground -127.430 171.780 970.750 -0.131 0.177 0.054 0.071 0.071 68.712
Frist -86.230 113.520 688.710 -0.125 0.165 0.049 0.066 0.066 45.408
Second -59.730 90.670 554.690 -0.108 0.163 0.055 0.065 0.065 36.268
Third -26.670 62.180 249.520 -0.107 0.249 0.107 0.100 0.107 26.640
COL C-5
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
foundation 10.020 108.310 1616.590 0.006 0.067 0.043 0.027 0.043 68.994
Ground -106.900 153.330 1517.800 -0.070 0.101 0.032 0.040 0.040 61.332
Frist -84.780 116.760 1105.050 -0.077 0.106 0.033 0.042 0.042 46.704
Second -61.700 100.100 771.740 -0.080 0.130 0.046 0.052 0.052 40.040
Third -53.560 93.520 407.900 -0.131 0.229 0.085 0.092 0.092 37.408
COL C-4
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
foundation -60.700 93.740 1676.260 -0.036 0.056 0.019 0.022 0.022 37.496
Ground -133.480 147.820 1596.930 -0.084 0.093 0.022 0.037 0.037 59.128
Frist -139.070 141.040 1206.540 -0.115 0.117 0.024 0.047 0.047 56.416
Second -90.970 109.590 828.720 -0.110 0.132 0.035 0.053 0.053 43.836
Third -67.600 83.850 450.980 -0.150 0.186 0.052 0.074 0.074 33.540
COL C-3
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
foundation -52.560 132.090 1342.880 -0.039 0.098 0.043 0.039 0.043 58.230
Ground 24.000 156.350 1248.780 0.019 0.125 0.083 0.050 0.083 103.410
Frist 13.430 119.960 960.940 0.014 0.125 0.080 0.050 0.080 77.348
Second 20.560 111.510 674.900 0.030 0.165 0.111 0.066 0.111 75.130
Third 15.530 72.440 390.560 0.040 0.185 0.127 0.074 0.127 49.676
COL C-2
COL A-4
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -40.860 166.390 1725.430 -0.024 0.096 0.048 0.039 0.048 83.490
Ground -179.100 240.370 1500.850 -0.119 0.160 0.048 0.064 0.064 96.148
Frist -104.220 141.890 1068.450 -0.098 0.133 0.041 0.053 0.053 56.756
Second -78.130 113.220 710.290 -0.110 0.159 0.052 0.064 0.064 45.288
Third -41.540 82.370 377.290 -0.110 0.218 0.087 0.087 0.087 32.948
COL A-3
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -52.880 174.810 1580.850 -0.033 0.111 0.053 0.044 0.053 83.734
Ground -154.890 213.560 1363.500 -0.114 0.157 0.049 0.063 0.063 85.424
Frist -112.970 146.360 976.070 -0.116 0.150 0.044 0.060 0.060 58.544
Second -70.100 104.800 618.000 -0.113 0.170 0.056 0.068 0.068 41.920
Third -47.260 81.280 331.960 -0.142 0.245 0.090 0.098 0.098 32.512
COL A-2
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -38.250 160.970 1507.940 -0.025 0.107 0.054 0.043 0.054 81.282
Ground -167.260 228.200 1295.210 -0.129 0.176 0.054 0.070 0.070 91.280
Frist -110.700 141.770 915.560 -0.121 0.155 0.045 0.062 0.062 56.708
Second -78.000 113.940 584.390 -0.133 0.195 0.064 0.078 0.078 45.576
Third -43.500 82.470 307.330 -0.142 0.268 0.104 0.107 0.107 32.988
COL A-1
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -34.250 158.500 1396.910 -0.025 0.113 0.058 0.045 0.058 81.400
Ground -167.460 228.570 1206.370 -0.139 0.189 0.058 0.076 0.076 91.428
Frist -111.590 143.350 848.740 -0.131 0.169 0.049 0.068 0.068 57.340
Second -79.460 114.980 533.000 -0.149 0.216 0.070 0.086 0.086 45.992
Third -42.330 82.240 266.070 -0.159 0.309 0.122 0.124 0.124 32.896
COL B-5
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -106.280 198.490 1559.640 -0.068 0.127 0.049 0.051 0.051 79.396
Ground -268.040 320.740 1457.250 -0.184 0.220 0.058 0.088 0.088 128.296
Frist -195.430 219.530 1071.260 -0.182 0.205 0.050 0.082 0.082 87.812
Second -136.290 167.330 757.650 -0.180 0.221 0.061 0.088 0.088 66.932
Third -79.650 112.070 402.960 -0.198 0.278 0.088 0.111 0.111 44.828
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -112.060 198.560 1579.140 -0.071 0.126 0.047 0.050 0.050 79.424
Ground -257.450 307.780 1484.830 -0.173 0.207 0.055 0.083 0.083 123.112
Frist -203.000 225.430 1151.630 -0.176 0.196 0.047 0.078 0.078 90.172
Second -145.390 174.970 786.610 -0.185 0.222 0.060 0.089 0.089 69.988
Third -89.590 121.590 418.390 -0.214 0.291 0.089 0.116 0.116 48.636
COL B-3
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -127.380 209.790 1406.120 -0.091 0.149 0.053 0.060 0.060 83.916
Ground 240.820 285.700 1291.480 0.186 0.221 0.207 0.088 0.207 267.748
Frist -223.270 237.200 999.490 -0.223 0.237 0.053 0.095 0.095 94.880
Second -139.930 170.140 682.510 -0.205 0.249 0.068 0.100 0.100 68.056
Third -101.100 126.880 366.660 -0.276 0.346 0.097 0.138 0.138 50.752
COL B-2
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -119.460 197.920 1324.830 -0.090 0.149 0.054 0.060 0.060 79.168
Ground -250.500 301.880 1195.340 -0.210 0.253 0.068 0.101 0.101 120.752
Frist -215.370 230.960 886.770 -0.243 0.260 0.059 0.104 0.104 92.384
Second -147.740 176.750 614.790 -0.240 0.287 0.076 0.115 0.115 70.700
Third -91.010 120.610 330.050 -0.276 0.365 0.109 0.146 0.146 48.244
COL B-1
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
Foundation -118.270 197.280 1133.760 -0.104 0.174 0.063 0.070 0.070 78.912
Ground -252.970 305.430 970.750 -0.261 0.315 0.085 0.126 0.126 122.172
Frist -216.800 233.270 688.710 -0.315 0.339 0.077 0.135 0.135 93.308
Second -149.790 178.960 554.690 -0.270 0.323 0.086 0.129 0.129 71.584
Third -90.550 120.900 249.520 -0.363 0.485 0.146 0.194 0.194 48.360
COL C-5
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
foundation -103.880 197.820 1616.590 -0.064 0.122 0.048 0.049 0.049 79.128
Ground -264.640 315.710 1517.800 -0.174 0.208 0.055 0.083 0.083 126.284
Frist -191.660 217.010 1105.050 -0.173 0.196 0.048 0.079 0.079 86.804
Second -140.810 171.460 771.740 -0.182 0.222 0.060 0.089 0.089 68.584
Third -84.930 118.320 407.900 -0.208 0.290 0.091 0.116 0.116 47.328
COL C-4
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
foundation -96.650 132.790 1676.260 -0.058 0.079 0.024 0.032 0.032 53.116
Ground -189.270 211.500 1596.930 -0.119 0.132 0.032 0.053 0.053 84.600
Frist -173.430 182.460 1206.540 -0.144 0.151 0.033 0.060 0.060 72.984
Second -128.550 143.200 828.720 -0.155 0.173 0.042 0.069 0.069 57.280
Third -85.740 107.720 450.980 -0.190 0.239 0.067 0.096 0.096 43.088
COL C-3
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
foundation -115.170 204.710 1342.880 -0.086 0.152 0.057 0.061 0.061 81.884
Ground -115.460 289.190 1248.780 -0.092 0.232 0.102 0.093 0.102 127.330
Frist -80.070 163.740 960.940 -0.083 0.170 0.069 0.068 0.069 66.216
Second -72.380 75.600 674.900 -0.107 0.112 0.024 0.045 0.045 30.240
Third -26.860 66.490 390.560 -0.069 0.170 0.075 0.068 0.075 29.150
COL C-2
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
foundation -33.100 158.750 1376.770 -0.024 0.115 0.060 0.046 0.060 82.010
Ground -163.400 224.100 1194.990 -0.137 0.188 0.058 0.075 0.075 89.640
Frist -106.650 139.640 853.040 -0.125 0.164 0.048 0.065 0.065 55.856
Second -80.650 117.840 558.760 -0.144 0.211 0.069 0.084 0.084 47.136
Third -50.140 90.680 304.700 -0.165 0.298 0.113 0.119 0.119 36.272
COL C-1
Level M1 M2 P eo1 e02 0.6*e02+.4*e01 0.4*e02 eo M
foundation -24.940 154.870 1501.040 -0.017 0.103 0.055 0.041 0.055 82.946
Ground -156.730 219.500 1328.800 -0.118 0.165 0.052 0.066 0.066 87.800
Frist -96.630 132.100 940.800 -0.103 0.140 0.043 0.056 0.056 52.840
Second -74.560 108.980 596.320 -0.125 0.183 0.060 0.073 0.073 43.592
Third -37.220 78.340 316.660 -0.118 0.247 0.101 0.099 0.101 32.116
Total Eccentricity to be used for the design of column of constant cross-section at the critical section is
given by
Etot=ee+ea+ez
Where,
Where,
ea is the additional eccentricity to account for geometric imperfection, introduced by increasing the
eccentricity of the longitudinal force acting in the most unfavorable direction.
ea=Le/300≥20mm
according to EBCS-2,1995 Art 4.4.6(2), e2 in compressive members need not to be taken into account if
limit of slenderness is satisfied.
- For sway frames in the absence of rigorous method the amplified sway moments
method can be employed to obtain the way contribution by multiplying the 1st order
moment by magnification factor by
s=1/(1-Nsd/Ncr), provided that Nsd/Ncr≤ 0.25
COL C-2
Ground -163.4 224.1 1195.0 12463 2.13E+09 1.06E+13 8.85 1339976 0.25 1.33 1.50 89.64 119.52
COL C-1
Level M1 M2 P Ec Ic Eie Le Ncr Nsd/Ncr ƍs ƍl M Ms
Ground -156.7 219.5 1328.8 12463 2.13E+09 1.06E+13 8.85 1339976 0.25 1.33 1.50 87.80 117.07
DESIGN MOMENT
M--2-2 M-3-3
COL A-1
Level M Ma Mt M Ma Mt
Foundation 77.436 27.9382 105.3742 81.4 27.9382 109.3382
Ground 67.644 24.1274 91.7714 121.904 33.58597 155.49
Frist 41.656 16.9748 58.6308 57.34 16.9748 74.3148
Second 33.772 10.66 44.432 45.992 10.66 56.652
Third 25.166 5.3214 30.4874 32.896 5.3214 38.2174
COL B-5
Level M Ma Mt M Ma
Foundation 68.074 31.1928 99.2668 79.396 31.1928 Mt
Ground 62.208 29.145 91.353 128.296 29.145 157.441
Frist 45.832 21.4252 67.2572 87.812 21.4252 109.2372
Second 39.128 15.153 54.281 66.932 15.153 82.085
Third 36.156 8.0592 44.2152 44.828 8.0592 52.8872
COL B-4
Level M Ma Mt M Ma Mt
Foundation 57.994 31.5828 89.5768 79.424 31.5828 111.0068
Ground 82.736 29.6966 112.4326 164.1493 34.55773 198.7071
Frist 65.932 23.0326 88.9646 90.172 23.0326 113.2046
Second 52.42 15.7322 68.1522 69.988 15.7322 85.7202
Third 39.736 8.3678 48.1038 48.636 8.3678 57.0038
COL B-3
Level M Ma Mt M Ma Mt
Foundation 57.926 28.1224 86.0484 83.916 28.1224 112.0384
Ground 83.924 25.8296 109.7536 267.748 25.8296 293.5776
Frist 63.296 19.9898 83.2858 94.88 19.9898 114.8698
Second 48.98 13.6502 62.6302 68.056 13.6502 81.7062
Third 33.96 7.3332 41.2932 50.752 7.3332 58.0852
DESIGN MOMENT
M--2-2 M-3-3
COL B-2
Level M Ma Mt M Ma Mt
Foundation 56.164 26.4966 82.6606 79.168 26.4966 105.6646
Ground 86.372 23.9068 110.2788 161.0027 26.754 187.7567
Frist 65.132 17.7354 82.8674 92.384 17.7354 110.1194
Second 51.404 12.2958 63.6998 70.7 12.2958 82.9958
Third 74.87 6.601 81.471 48.244 6.601 54.845
COL B-1
Level M Ma Mt M Ma Mt
Foundation 61.638 22.6752 84.3132 78.912 22.6752 101.5872
Ground 68.712 19.415 88.127 162.896 21.72725 184.6232
Frist 45.408 13.7742 59.1822 93.308 13.7742 107.0822
Second 36.268 11.0938 47.3618 71.584 11.0938 82.6778
Third 26.64 4.9904 31.6304 48.36 4.9904 53.3504
COL C-5
Level M Ma Mt M Ma Mt
foundation 68.994 32.3318 101.3258 79.128 32.3318 111.4598
Ground 61.332 30.356 91.688 126.284 30.356 156.64
Frist 46.704 22.101 68.805 86.804 22.101 108.905
Second 40.04 15.4348 55.4748 68.584 15.4348 84.0188
Third 37.408 8.158 45.566 47.328 8.158 55.486
COL C-4
Level M Ma Mt M Ma Mt
foundation 37.496 33.5252 71.0212 53.116 33.5252 86.6412
Ground 59.128 31.9386 91.0666 112.8 31.9386 144.7386
Frist 56.416 24.1308 80.5468 72.984 24.1308 97.1148
Second 43.836 16.5744 60.4104 57.28 16.5744 73.8544
Third 33.54 9.0196 42.5596 43.088 9.0196 52.1076
DESIGN MOMENT
M--2-2 M-3-3
COL C-3
Level M Ma Mt M Ma Mt
foundation 58.23 26.8576 85.0876 81.884 26.8576 108.7416
Ground 103.41 24.9756 128.3856 127.33 24.9756 152.3056
Frist 77.348 19.2188 96.5668 66.216 19.2188 85.4348
Second 75.13 13.498 88.628 30.24 13.498 43.738
Third 49.676 7.8112 57.4872 29.15 7.8112 36.9612
COL C-2
Level M Ma Mt M Ma Mt
foundation 56.04 27.5354 83.5754 82.01 27.5354 109.5454
Ground 86.088 23.8998 109.9878 119.52 35.23667 154.7567
Frist 65.52 17.0608 82.5808 55.856 17.0608 72.9168
Second 49.012 11.1752 60.1872 47.136 11.1752 58.3112
Third 66.21 6.094 72.304 36.272 6.094 42.366
COL C-1
Level M Ma Mt M Ma Mt
foundation 63.178 30.0208 93.1988 82.946 30.0208 112.9668
Ground 66.124 26.576 92.7 117.0667 39.18232 156.249
Frist 45.348 18.816 64.164 52.84 18.816 71.656
Second 34.364 11.9264 46.2904 43.592 11.9264 55.5184
Third 25.648 6.3332 31.9812 32.116 6.3332 38.4492
Third 44.22 44.83 402.96 160000 0.222 0.061 0.062 0.1 1280.00 4φ20
COL B-4
Level Mt(2-2) Mt(3-3) P Ac v µx µy w Ast Remark
Foundation 89.58 79.42 1579.14 160000 0.871 0.124 0.110 0.6 3678.88 8φ28
Ground 112.43 164.15 1484.83 160000 0.819 0.155 0.226 0.8 4905.17 8φ28
Frist 88.96 90.17 1151.63 160000 0.635 0.123 0.124 0.5 3065.73 8φ20
Second 68.15 69.99 786.61 160000 0.434 0.094 0.097 0.2 1280.00 4φ20
Third 48.10 48.64 418.39 160000 0.231 0.066 0.067 0.1 1280.00 4φ20
COL B-3
Level Mt(2-2) Mt(3-3) P Ac v µx µy w Ast Remark
Foundation 86.05 83.92 1406.12 160000 0.776 0.119 0.116 0.5 3065.73 8φ32
Ground 109.75 267.75 1291.48 160000 0.712 0.151 0.369 1 6131.46 8φ32
Frist 83.29 94.88 999.49 160000 0.551 0.115 0.131 0.4 2452.58 8φ20
Second 62.63 68.06 682.51 160000 0.376 0.086 0.094 0.2 1280.00 4φ20
Third 41.29 50.75 366.66 160000 0.202 0.057 0.070 0.1 1280.00 4φ20
COL B-2
Level Mt(2-2) Mt(3-3) P Ac v µx µy w Ast Remark
Foundation 82.66 79.17 1324.83 160000 0.731 0.114 0.109 0.5 3065.73 8φ32
Ground 110.28 161.00 1195.34 160000 0.659 0.152 0.222 0.9 5518.31 8φ32
Frist 82.87 92.38 886.77 160000 0.489 0.114 0.127 0.3 1839.44 8φ20
Second 63.70 70.70 614.79 160000 0.339 0.088 0.098 0.2 1280.00 4φ20
Third 81.47 48.24 330.05 160000 0.182 0.112 0.067 0.2 1280.00 4φ20
Third 45.57 47.33 407.90 160000 0.225 0.063 0.065 0.1 1280.00 4φ20
COL C-3
Level Mt(2-2) Mt(3-3) P Ac v µx µy w Ast Remark
foundation 85.09 81.88 1342.88 160000 0.741 0.117 0.113 0.4 2452.58 8φ28
Ground 128.39 127.33 1248.78 160000 0.689 0.177 0.176 0.8 4905.17 8φ28
Frist 96.57 66.22 960.94 160000 0.530 0.133 0.091 0.4 2452.58 8φ20
Second 88.63 30.24 674.90 160000 0.372 0.122 0.042 0.2 1280.00 4φ20
Third 57.49 29.15 390.56 160000 0.215 0.079 0.040 0.1 1280.00 4φ20
COL C-2
Level Mt(2-2) Mt(3-3) P Ac v µx µy w Ast Remark
foundation 83.58 82.01 1376.77 160000 0.759 0.115 0.113 0.4 2452.58 6φ32
Ground 109.99 119.52 1194.99 160000 0.659 0.152 0.165 0.7 4292.02 6φ32
Frist 82.58 55.86 853.04 160000 0.471 0.114 0.077 0.3 1839.44 6φ20
Second 60.19 47.14 558.76 160000 0.308 0.083 0.065 0.2 1280.00 4φ20
Third 72.30 36.27 304.70 160000 0.168 0.100 0.050 0.1 1280.00 4φ20
5. Foundation
B B’
Using combination at serviceability (SAP output)
My=1.2 KN.m
Mx=2.76 KN.m
Q=972.27 KN
Total Qt=Q+10%Q
=972.27+0.1*972.27
=1069.50 KN
L’=B-2*ex=B-2*0.0011=B-0.0022 B
B’=B-2*ey=B-2*0.0026=B-0.0052 B
use FoS=3.0
qult/3.0=(1069.5/B2)(1±(6(0.0011/B)±(6(0.0026/B))
qult/3.0=1069.5/B2+23.74/B3
qult=3.2085/B2+71.22/B3……………………..*
0.0
𝛾b =18.0 KN/m3, 𝛾sat=20.0 KN/m3, e0=0.80, W=28%
Cc=0.18, Cu=90 KN/m2, C’=23 KN/m2, 𝜙’=28, Gs=2.78, E=20 Mpa, v=0.45
3.0 m
Cc=0.23, Cu=100 KN/m2, C’=20 KN/m2, 𝜙’=35, Gs=2.85, E=25 Mpa, v=0.5
7.0 m
e0=0.85, W=34%
Cc=0.28, Cu=120 KN/m2, C’=40 KN/m2, 𝜙’=38, Sr=82%, Gs=2.75, 𝛾sat=19.5 KN/m3,
E=29.5 Mpa, v=0.4, Cr=0.005, OCR=2.0
12.0 m
i) For undrained case; ’=0
h1Cu1+h2Cu2+h3Cu3
C’avg=
h1+h2+h
3*90+4*100+5*120
= =105.33 KN/m2
12
qu=105.33*5.14*1.2*(1.0+0.4/B)*1.0+40*1.0*1.0*1.0
qu=541.10*1.2*(1+0.4/B)+40
qu= 689.32+259.73/B..................................**
3.208.5/B2+71.22B3= 689.32+259.73/B
229.78B3+86.58B2-1069.5B-23.74=0
Nq=31.39
Shape Factor;
Fcs=1+0.2(B/B)tan2(45+34.68/2)=1.73
Fqs=F s=1+0.1(B/B)tan2(45+34.68/2)=1.36
Depth Factor;
=1.0+0.76/B
Fqd=F d=1+0.1(Df/B)tan(45+34.68/2)
=1+0.38/B
Inclination Factor:
C’avg=29.08 KN/m2
’u avg=19.73 KN/m2
q=40 KN/m2
qu=29.08*44.14*1.73*(1.0+0.76/B)*1.0+40*31.99*1.0*1.36*(1+0.38/B)+1/2*19.73*B*34.15*(1+0.3
8/B)(1.36)
qu=4102.32*458.17B*2336.46/B……………….***
3.208.5/B2+71.22B3= 4102.32*458.17B*2336.46/B
1367.44B3+152.72B2+778.82B2-106 9.5B-23.74=0
My=2.82 KN.m
Mx=1.56 KN.m
Qult=689.32+259.73/B………..from eqn **
From eccentricity;
ex=My/P=2.82/1076=0.0026
ey=Mx/P=1.56/1076=0.0014
qult/3=P/B2(1+6ey/B±6ey/B)=1076/B2(1+6*0.0026+(6*0.0014/B))
=1076/B2+25.82/B3
Thus, by equating
689.32+259.73/B=1076/B2+25.82/B3
229.78B3+86.58B2-1076B-25.82=0
Footing Layout
Since the footing is 2m*2m, we have no overlapped footing. Thus all footing pad are isolated.
Mx 2.0m
Mx=24.95 KN.m
Pd=1493.68 KN
B=2.0m
d 2.0m b
2.0m
i) Stress distribution
ex=My/P=18.59/1493.68=0.012m
ey=Mx/P=24.95/1493.68=0.017m
=1493.68/2*2(1±6*0.012/2±6*0.017/2)
a=1493.68/4(1+6*0.012/2+6*0.017/2)=405.9 KN/m2
b=1493.68/4(1+6*0.012/2-6*0.017/2)=367.82 KN/m2
c=1493.68/4(1-6*0.012/2+6*0.017/2)=379.02 KN/m2
d=1493.68/4(1-6*0.012/2-6*0.017/2)=340.93 KN/m2
340.93 KN/m2
367.82 KN/m2
=373.42 KN/m2.
According to EBCS-2,1995 art 4.7.6 the resistant of footing without punching shear is given by:
K1=1+50*0.0017≥1
=1.085
K2=1.6-d≥1
fctd=0.21 fcd2/3=1.059
by substituting ,
Vrd=735-61d+5057.36d2-3448.2d3
Punching shear;
2
Vp=Pd- avg(0.4+3d)
Vp=1493.68-373.42(0.4+3d)2
Vp=1433.93-896.21-3360.8d2……………….(2)
d=0.347m
Mmax
𝜎 avg=373.42 KN/m2
Figure 1
2
Mmax= avg*B(B-b/8) , where B=pad width, b=column width
=373.42*2(2-0.4)2/8
=238.98 KN.m
max
d≥√
0.8*fcd*B* x*(1- 0.448)
238.98
d≥√
0.8*11.33 2000*0.448*(1- 0.448)
d≥0.189m…………..safe!
DILLA University Department of Civil Engineering Page214
G+3 mixed use building analysis and design 2021
iv) Chec ‘d’ for wide eam shear
- K1=1.085
- K2=1.6-d
=1. 6-0.347=1.25m
- Fctd=1059.34 Kpa
Vc=0.25*1059.34*1.085*1.25*2.0*0.347
Vc=251.42 KN
𝜎 avg=373.42 KN/m2
Vd= avg((B-b)/2-d)*B
N.B: maximum wide shear occurs at ‘d’ distance from column face.
Vd=373.43((2-0.4)/2-0.347)*2.0
Vd=336.078 KN
Vc=0.25*1059.34*1.085*(1.6-d)*2*d……………eqn 1
Vd=373.42((2-0.4)/2-d)*2………..eqn 2
d=0.419m
Use, D=480mm
√ max/ √238.98/2
Km= = =26.02
d 0.42
Ks=4.00
As=KsM/d=4*238.98/0.42=2276 mm2
As>Asmin
=137.96 mm
Cc=0.23, Cu=100 KN/m2, C’=20 KN/m2, 𝜙’=35, Gs=2.85, E=25 Mpa, v=0.5
e0=0.85, W=34%
Cc=0.28, Cu=120 KN/m2, C’=40 KN/m2, 𝜙’=38, Sr=82%, Gs=2.75, 𝛾sat=19.5 KN/m3,
E=29.5 Mpa, v=0.4, Cr=0.005, OCR=2.0
Hard Rock
0.5*1493.68/4.0=373.42 (2*2)/(2+Z)2
4+4Z+Z2=8
Z2+4Z-4=0
2=1
0.83=x
2x=0.83
X=0.415m
=20 KN/m3*(2+0.83)
2
o’=56.6KN/m .
2 2
- m= av*B /(B+Z) , Z=0.83/2=0.415
=373.73*2 /(2+0.415)2
2
=256.32 KN/m2
2
- b= av*B /(B+Z)2, Z=0.83
=236.28 KN/m2
o’=56.6 KN/m2,
av’=236.28 KN/m2
=0.0713m=71.3mm
- For our soil the secondary consolidation is not considered because the soil is in
organic & not highly platic.