Professional Documents
Culture Documents
EDGE2 Siteplan LVGF Building Press
EDGE2 Siteplan LVGF Building Press
EDGE2 Siteplan LVGF Building Press
HARD
STANDING
6X15M
OFFICE ENTRY
LV. GF: +10.000 B
EL: ± 0 / SL: -50
UNLAODING AREA
SL: -1.200 (+8.800)
SLOPE: 4° / 7%
A
ENTRANCE
GRASS: EL: -50 (+9.950)
EL:-270 (+9.730) DROP OFF
ROAD
SL: -370
B
SL: -370
(+9.630)
(+9.630)
A
From +9.232, Slope: Flat (difference 62mm)
From +9.258, Slope: Flat (difference 36mm)
NOTE:
(*) (8.473 + 9.147) / 2 = 8.810 = ROAD AVERAGE
(**) MAX. HIGH = 1.200mm, BUILDING LV. GF ARE
ALLOWED TO REACH MAX. 1.2 METERS TAKEN FROM
THE AVERAGE OF WIDEST ROAD (REF. PERGUB DKI,
NO.135/2019, THE GOVERNOR REGULATION OF JAKARTA)
SECTION-A/A SECTION-B/B
SCALE: NTS SCALE: NTS