General Procedures Level : 4

Doc. No. : APS-MTC-009.018/FO-GP


Date of Issued : 23/11/2017
SLING CHECKLIST FOR Rev. : #01
PT. ASIA Petrocom Services Date of Rev. : 23/11/2019
DRILLING RIG & WORKOVER SERVICES RIG UP AND RIG DOWN Next Rev. : 11-2021

Tanggal : Nama Rig :


Lokasi :

Baik = V; Tidak Baik = X


Kondisi Saran / Keterangan
No Nama Peralatan
Baik Tidak
A Sling Mast
Air hoist / Cat Line Right
1
Air hoist / Cat Line Left
2
Inner guyline Right
3
Inner guyline Left
4
Outter Guyline In Front of Rig carrier
5
Outter Guyline Back of Rig carrier
6
Counter Balance Manual Tong Right
7
Counter Balance Manual Tong Left
8
Escape Line
9
Clamp Stand Pipe near of Monkey
10 Board

11
Sling Hanger Monkey Board

Dilaporkan Oleh, Diketahui Oleh, Disetujui Oleh,

Nama : Nama : Nama :


Jabatan : Jabatan : Jabatan :