REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS & HIGHWAYS


REGION V
ALBAY 1ST DISTRICT ENGINEERING OFFICE
AIRPORT SITE, LEGAZPI CITY

C.Y 2022 PROJECT


REHABILITATION OF MULTI PURPOSE BUILDING
(ST. JOHN THE BAPTIST CHURCH -
CULTURAL HERITAGE SITE)

TABACO CITY, ALBAY

SUBMITTED BY: RECOMMENDED: APPROVED:

ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA


CHIEF PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE: DATE:
Republic of the Philippines

SUMMARY OF QUANTITIES
TABLE OF OFFICE OF THE CITY/ MUNICIPAL
ENGINEER/ BUILDING OFFICIAL

CONTENTS
ARCHITECTURAL
1 COVER PAGE
31 DISTRICT/ CITY/ MUNICIPALITY
TABLE OF CONTENTS
2
31
PHOTOS
SITE DEVELOPMENT PLAN LAND USE & ZONING
VICINITY MAP

3 FLOOR PLAN
31

4 FRONT ELEVATION
31 REAR ELEVATION

RIGHT SIDE ELEVATION


5 LEFT SIDE ELEVATION
31

6 SECTION
31

7 REFLECTED CEILING PLAN LINE & GRADE


31

PHOTOS 8
31
ROOF PLAN

SITE ASSESSMENT AND DOCUMENTATION


9
QUADRANT 1 BLOW-UP FRAMING PLAN
31 QUADRANT 4 BLOW-UP FRAMING PLAN

SITE ASSESSMENT AND DOCUMENTATION


10 QUADRANT 2 BLOW-UP FRAMING PLAN
31 QUADRANT 3 BLOW-UP FRAMING PLAN

BLOW-UP DETAILS OF STRUCTURAL


11 CONNECTION
31 DOME FRAMING PLAN ARCHITECTURAL
DOME FRAMING PLAN
12 SECTION DOME CEILING FRAMING
31 CONNECTION
TYPICAL DETAIL
DETAIL OF PROJECT BILLBOARD
NOTES
13 CONSTRUCTION SAFETY SIGNAGE FOR
31 BUILDING
CONSTRUCTION

THIS SITE STRUCTURAL


14 ROOF FRAMING PLAN
31 STRUCTURAL
15 DOME FRAMING PLAN
31

16 DETAIL OF RAFTERS
31

N 17
31
DETAIL OF RING CONNECTOR

18 TRUSS 1
31 TRUSS 2

TRUSS 5
19
31
TRUSS 6
TRUSS 7
SANITARY
TRUSS 8

20 TRUSS 9
31

21 DETAIL OF BRACING-A
31
ST. JOHN THE BAPTIST CHURCH TRUSS 3
22 BASE PLATE 1 DETAIL
31 BASE PLATE 2 DETAIL
CHRIST THE
KING PLAZA 23
CONNECTION DETAILS
31
ELECTRICAL
24
DETAIL OF BRACING-B
31

25 DETAIL OF BRACING-C
31

26 DETAIL OF STRUT-B
31
ZIGA AVENUE
27
DETAIL OF TRUSS 1
31
MECHANICAL
28
DETAIL OF TRUSS 2
31

29

SITE DEVELOPMENT PLAN VICINITY MAP 31 DETAIL OF CONCRETE GUTTER

SCALE: NTS BASE PLATE 1 DETAIL


SCALE: NTS 30
HIGH TENSILE BOLT & NUT
31 BASE PLATE 2 DETAIL

31
BASE PLATE DETAIL
31

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES ARCHITECT II
TABLE OF CONTENTS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE PHOTOS DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH SITE DEVELOPMENT PLAN
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 2
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE) VICINITY MAP
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 2 13 31
CONSULTANT ARCHITECT DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
A" A' A B C D E F G
70731

8600 10218 7880 7712 8868 8700 8870 9882

1"
1' 5647
1996

1
5800

2
7500

3
7500

4
5800

5
1996
4869

5'
5"

FLOOR PLAN
SCALE: 1: 250 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES ARCHITECT II
FLOOR PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 3
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 3 13 31
CONSULTANT ARCHITECT DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
5" 5 4 3 2 1 1"
35710

4869 5800 7500 7500 5800 5647

ROOF LINE

16800
TOP OF BEAM

8600
NGL

FRONT ELEVATION
SCALE: 1: 250 MTS.

1" 1 2 3 4 5 5"
35710

4869 5800 7500 7500 5800 5647

TRUSS 5
TRUSS 6
TRUSS 7
TRUSS 8
ROOF LINE
16800

TOP OF BEAM
8600

NGL

REAR ELEVATION
SCALE: 1: 250 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES ARCHITECT II
FRONT ELEVATION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE REAR ELEVATION
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 4
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 4 13 31
CONSULTANT ARCHITECT DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
G F E D C B A A' A"
70731
9882 8870 8700 8868 7712 7880 10218 8600

BOTANICAL GROWTH (MOLD, MOSS,PLANTS)


CONCRETE GROUT/PLASTER on STONE
RESIN SYNTHETIC MARBLE
CONC. HOLLOW BLOCK & PLASTER
MISSING STONE PIECE
ELECTRICAL WIRE
ROOF APEX
WATER LEADER and DOWNSPOUT PIPE
RED STONE
STONE MARKINGS
TOP OF
BEAM

24014
8600
NGL

RIGHT SIDE ELEVATION


SCALE: 1: 250 MTS.

A" A' A B C D E F G
70731
8600 10218 7880 7712 8868 8700 8870 9882

ROOF APEX

TOP OF
BEAM
16800
8600

NGL

LEFT SIDE ELEVATION


SCALE: 1: 250 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES ARCHITECT II
RIGHT SIDE ELEVATION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE LEFT SIDE ELEVATION DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 5
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 5 13 31
CONSULTANT ARCHITECT DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
A' A B C D E F G
62130
10218 7880 7712 8868 8700 8870 9882

ROOF APEX

SEE TRUSS DETAIL

TOP OF BEAM
16800
8600

"MARTHA, MARTHA, NASISIBOT KA SA DAKUL NA


MGA BAGAY. ALAGAD SARO SARO SANA AN KAIPUHAN
PINILI NI MARIA AN MAS MARHAY NA PARTE. ASIN
DAI IYAN HAHALEON SAIYA." (Lk 10:41)
SI MARTHA ASIN SI MARIA

NGL

SECTION
SCALE: 1: 250 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES ARCHITECT II
SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 6
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 6 13 31
CONSULTANT ARCHITECT DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
A' A'' A B C D E F G
70731

8600 10218 7880 7712 8868 8700 8870 9882

1"
1' 5647
1996

1
5800

2
7500

3
7500

4
5800

5
1996
4869

5'
5"

REFLECTED CEILING PLAN


SCALE: 1: 250 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES ARCHITECT II
REFLECTED CEILING PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 7
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 7 13 31
CONSULTANT ARCHITECT DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
A' A'' A B C D E F G
70731

8600 10218 7880 7712 8868 8700 8870 9882

1"
1'
5647
1996

1
5800

2
7500

3
7500

4
5800

5
1996
4869

5'
5"

ROOF PLAN
SCALE: 1: 250 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES ARCHITECT II
ROOF PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 8
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 8 13 31
CONSULTANT ARCHITECT DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
SITE ASSESSMENT AND DOCUMENTATION

RAFTER TRUSS 1 DIAGONAL BRACES RAFTER TRUSS 1 DIAGONAL BRACES


RAFTER TRUSS 1 RAFTER TRUSS 2 RAFTER TRUSS 2 RAFTER TRUSS 1
LOCATION: QUADRANT 1
TRUSS
ASSESSMENT:
COLUMN BEAM COLUMN 1. PORTIONS OF TOP CHORD AND WEB MEMBERS
ARE DEFECTIVE DETERIORATING DUE TO
TERMITE EXPOSURE.
2. DISCOLORATION OF THE WOOD MEMBERS DUE
TO SEASONAL CHANGE AND OLD AGE.
3. BROKEN AND CRACKED WOOD FRAMING.
REQUIRES TREATMENT AND REPLACEMENT.
4. SEVERAL GOOD LUMBER AND PLYWOOD ARE
ALREADY ROT (WATER STAIN AND MOSS)

LEGEND
DOME FRAMING
RAFTER TRUSS 1

BEAM
BEAM

RAFTER TRUSS 2
RAFTER 1 DIAGONAL BRACES
CEILING FRAMING
2X3 LUMBER
TRUSS 1
TRUSS

TRUSS
QUADRANT 1 BLOW-UP QUADRANT 4 BLOW-UP
FRAMING PLAN FRAMING PLAN
SCALE: 75 MTS. SCALE: 75 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES REHABILITATION / MAJOR REPAIR OF ARCHITECT II
SITE ASSESSMENT AND DOCUMENTATION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MULTI PURPOSE BUILDING - QUADRANT 1 BLOW-UP FRAMING PLAN DATE:
REGION V REHABILITATION OF MULTI PURPOSE QUADRANT 4 BLOW-UP FRAMING PLAN
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 09
ALBAY 1ST DISTRICT ENG'G. OFFICE BUILDING (ST. JOHN THE BAPTIST CHURCH ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY CULTURAL HERITAGE SITE) ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 09 13 31
CONSULTANT ARCHITECT DATE: DATE:
TABACO CITY, ALBAY DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
SITE ASSESSMENT AND DOCUMENTATION

LOCATION: QUADRANT 2
ASSESSMENT:
1. DISCOLORATION OF THE WOOD MEMBERS AND
TRUSS

TRUSS
WOOD CASING DUE TO EXPOSURE TO
SEASONAL CHANGE.
2. TATTERED LAYERS OF INSULATION SHEETS AND
CRACKED WOOD FRAMING.
3. SEVERAL PORTIONS OF WOOD IN THIS AREA
ARE STILL IN GOOD CONDITION BUT TREATMENT

BEAM
BEAM

AND INTERVENTION IS NEEDED.


4. SEVERAL GOOD LUMBER AND PLYWOOD ARE
ALREADY ROT (WATER STAIN AND MOSS)

LEGEND
DOME FRAMING
RAFTER TRUSS 1
RAFTER TRUSS 2
RAFTER 1 DIAGONAL BRACES
CEILING FRAMING
2X3 LUMBER
TRUSS 1
COLUMN BEAM COLUMN
Q3 TRUSS
RAFTER TRUSS 1 RAFTER TRUSS 2 RAFTER TRUSS 2 RAFTER TRUSS 1
RAFTER TRUSS 1 DIAGONAL BRACES RAFTER TRUSS 1 DIAGONAL BRACES

QUADRANT 2 BLOW-UP QUADRANT 3 BLOW-UP


FRAMING PLAN FRAMING PLAN
SCALE: 50 MTS. SCALE: 50 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES REHABILITATION / MAJOR REPAIR OF ARCHITECT II
SITE ASSESSMENT AND DOCUMENTATION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MULTI PURPOSE BUILDING - QUADRANT 2 BLOW-UP FRAMING PLAN DATE:
REGION V REHABILITATION OF MULTI PURPOSE QUADRANT 3 BLOW-UP FRAMING PLAN
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 10
ALBAY 1ST DISTRICT ENG'G. OFFICE BUILDING (ST. JOHN THE BAPTIST CHURCH ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY CULTURAL HERITAGE SITE) ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 10 13 31
CONSULTANT ARCHITECT DATE: DATE:
TABACO CITY, ALBAY DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
SITE ASSESSMENT AND DOCUMENTATION
SPACED @650 MM

SPACED @1040 MM
RAFTER TRUSS 1
RAFTER TRUSS 2 DIAGONAL BRACES
SPACED @600 MM

TOP CHORD

200X300MM GOOD LUMBER 3


WEB
B E A M 2 MEMBERS

120X200MM
GOOD LUMBER
224X226MM
GOOD LUMBER BLOW-UP DETAILS OF
RAFTER TRUSS 1

140X160MM STRUCTURAL CONNECTION


GOOD LUMBER SCALE: 100 MTS.

B E A M
LEGEND:
380X320MM RAFTERS LOCATED ON THE PERIMETER OF THE
GOOD LUMBER DOME ACTS AS THE MAIN SUPPORT OF THE SYSTEM.
TWO (2) LUMBERS LOCATED BELOW THE DIAGONAL
BRACING POSITIONED BETWEEN THE RAFTER.
1 - LOCATED BELOW THE RAFTER FRAME
INTERSECTING THE INNER FRAME OF THE ARCH AND
WAS CONNECTED USING COMMON NAIL OR (PIERNO
PASANTE)

2 - LAPPED JOINED BELOW THE RAFTER.


3 - LAPPED JOINED ABOVE THE RAFTER.
50.8X50.8MM WOOD
GOOD LUMBER SPACED @60MM
B E A M DOME FRAMING
RAFTER TRUSS 1
RAFTER TRUSS 2
DOME FRAMING PLAN RAFTER 1 DIAGONAL BRACES

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES REHABILITATION / MAJOR REPAIR OF BLOW-UP DETAILS OF STRUCTURAL CONNECTION ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MULTI PURPOSE BUILDING - DOME FRAMING PLAN DATE:
REGION V REHABILITATION OF MULTI PURPOSE PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 11
ALBAY 1ST DISTRICT ENG'G. OFFICE BUILDING (ST. JOHN THE BAPTIST CHURCH ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY CULTURAL HERITAGE SITE) ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 11 13 31
CONSULTANT ARCHITECT DATE: DATE:
TABACO CITY, ALBAY DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
±13843

RAFTER TRUSS 1
RAFTER TRUSS 2 DIAGONAL BRACES
200X300MM GOOD LUMBER

±4122
1 RA
S FTE
B E A M US R
TR TR
TER USS
RAF 1
TYPICAL FRAMING PATTERN
120X200MM
GOOD LUMBER
APPLIED ON DOME CEILING
224X226MM
GOOD LUMBER BEAM BEAM
RAFTER TRUSS 1

SLA
T
OR
140X160MM

NT
GOOD LUMBER

PP

ED
SU
2" X 2" CEILING JOISTS

WO
OD
B E A M

OD
WO
2" X 2" WOOD HANGERS

SU
ED

PP
NT

OR
SLA
380X320MM

T
GOOD LUMBER

50.8X50.8MM WOOD
GOOD LUMBER SPACED @60MM
B E A M

DOME FRAMING PLAN SECTION DOME CEILING


SCALE 50 MTS. FRAMING CONNECTION
TYPICAL DETAIL
SCALE:

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES ARCHITECT II
DOME FRAMING PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE SECTION DOME CEILING FRAMING CONNECTION DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH TYPICAL DETAIL
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 12
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 12 13 31
CONSULTANT ARCHITECT DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
2440
1. The new billboard design layout and dimension (see attached drawing) shall 210
210 210
be installed on a standard billboard measuring 1200 mm x 2400 mm (4ft. x
50
50
8ft.) using 12 mm (1/2 inch) thick marine plywood or tarpaulin posted on 5 80 80

mm (3/16 inch) marine plywood.

50
2. The color shade combination for the yellow background of the new project
billboard design is as follows:

210
Cyan - 0
Magenta - 7

50

60 20
Yellow - 78 THIS IS WHERE YOUR TAXES GO

50
Key - 0
NAME OF PROJECT:

60
3. For each building project, the billboard shall be installed in front of the

50 50
project site. LOCATION:

1220

30
4. For each road/bridge/flood control project, two billboards shall be installed, NAME OF CONTRACTOR:

50

30
i.e., one at the beginning and one at the end of the project. DATE STARTED

50

30
5. For road projects with length of 10 kilometers or more, billboard(s) shall also CONTRACTION COMPLETION DATE:

50

30
be installed at every 5 kilometers interval. CONTRACTION COST:

50

30
6. Name(s) and/or picture(s) of any personages should not appear in the
IMPLEMENTING OFFICE:

50
billboard.

30
SOURCES OF FUND:

50
7. No political billboards shall be allowed to be installed 100 meters before and

10 20 20 20
Department of Public Works and Highways

20 20 30
100 meters after all DPWH projects and in between the project limits or Text 2920 or call (02)165-02 for any concern on this project
www.dpwh.gov.ph
within the road right-of-way.
8. DPWH contractors shall not be allowed to place names of politicians on their
equipment or carry political biliboard on their equipment.
FRONT ELEVATION
SCALE 1:20MTS

DISPLAY AREA DISPLAY AREA

(1200 x 2400 x 12 (TARPAULIN ON 1200 x 2400 x 5


MARINE PLYWOOD) MARINE PLYWOOD)

ORIENTATION
1:10MTS

FRONT ELEVATION (OPTION 1)


TYPICAL FRAME ELEVATION 1:7MTS
FRONT ELEVATION (OPTION 2)
SCALE 1:7MTS SCALE 1:7MTS CONSTRUCTION SAFETY
SIGNAGE FOR BUILDING
CONSTRUCTION
DETAIL OF PROJECT BILLBOARD
SCALE 1:7MTS
SCALE 1:7MTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
FREDERICK JUDE R. ARIOLA
REPUBLIC OF THE PHILIPPINES ARCHITECT II
DETAIL OF PROJECT BILLBOARD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE NOTES
DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH CONSTRUCTION SAFETY SIGNAGE FOR
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA A 13
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE) BUILDING ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY
CONSTRUCTION ANA M. LORILLA DATE: DATE: DATE: LEGAZPI, INC. 13 13 31
CONSULTANT ARCHITECT DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
A' A'' A B C D E F G
±5300 ±5100 ±8200 ±8200 ±8878 ±8878 ±8878 ±8878
±2650 ±2650 ±2550±2550 ±4075 ±4125 ±4125 ±4075 ±2959 ±2959 ±2854 ±3065 ±2959 ±2959 ±2959 ±2959 ±2959 ±2959 ±2959 ±2959

1'

±2650

R-2

R-2
±5300

R- 1
R-
±2650
1 TR-7

TR-8
±2550
TR-5 STRUT STRUT STRUT STRUT
±5800

±3375 ±2550

TR-6

2'
±700

2 TR-5

1
TR-9
±7500

R-
R-2
±4125

TR-1

TR-1

TR-1
TR-2

TR-2

TR-2

TR-2
TR-2

TR-2

TR-2

TR-2

TR-2
TR-4
TR-7

TR-5

TR-6

TR-5

TR-9

TR-9
3 TR-8 TR-3 TR-3 TR-3 TR-3
±4125
±7500

R-2
R-
±2550 ±3375

TR-9

4
±700

4' TR-5
±5800

±2550

TR-6

TR-8
STRUT STRUT STRUT STRUT
5
±2650

TR-5 20MMØ CROSS BRACING


±5300

1 R- INITIAL TENSION = 3.90 kN


R- 1
10MMØ SAG ROD 10MMØ SAG ROD
±2650

TR-7
R-2

R-2
LC150x50x2 PURLINS LC150x50x2 PURLINS SPACED AT 600MM O.C.
5' SPACED AT 600MM O.C. PROVIDE EXTRA PURLINS AT ENDS
PROVIDE EXTRA PURLINS 20MMØ CROSS BRACING
AT ENDS INITIAL TENSION = 3.90 kN

ROOF FRAMING PLAN


SCALE: 1: 250 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
ROOF FRAMING PLAN ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 14
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 1 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
A B C
±8200 ±8200
±2918 ±1885 ±3997 ±3997 ±1885 ±2918

A
2'

±700
2

TR-8
±2218
5

W
x4

10
10 TR-9

x4
W

5
W10x45 W10x45
W10x45 RAFTER 1

±1885

5
W1

0x4
45

0x4
±7500
W1 0x

W1
0 x4 W1 W10x45 BOTTOM MEMBER

5
5 45

W
0x

45
10
W1
1

x4

0x
W

5
W10x45 RAFTER 2

W1
0x4
5
±3397

W1 5
0x 0x4

W10x45TR-9W10x45

W10x45
45 W1 W10x45 RAFTER 3

TR-9
3 TR-8 TR-3
W12x45 RING CONNECTOR

W10x45
W12x45
W10x45 RAFTER 4
±3397

5 W1
0x4 0x4
W1 5

W1
LC150x50x2 PURLINS

45

0x
0x
SPACED AT 600MM O.C.

45
W1

W
PROVIDE EXTRA PURLINS

x4
W1

10
10
0x
±7500

AT ENDS

x4
5 45

W
x4

W1

5
10

0x4
±1885

0x4
W1

5
W10x45 W10x45
W

45
TR-9
10

x
10
x4

W
5
±2218

20MMØ CROSS BRACING

TR-8
INITIAL TENSION = 3.90 kN
4
±700

10MMØ SAG ROD


4'

DOME FRAMING PLAN


SCALE: 1: 125 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
DOME FRAMING PLAN ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 15
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 2 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
5 W
x4 10
10 x4
W 5

RAFTER 2
SECTION B

5 W1
0x4 0x4
W1 5

RAFTER 1
SECTION A

DETAIL OF RAFTERS
SCALE: 1: 250 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
DETAIL OF RAFTERS ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 16
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 3 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
W1

TR8

5
0X4
0X4

W1
5
W
10

45
X4

X
5

10
W
W1
0X4 W12x45 5
5 0X4
W1

TR8 TR3

0X 45 W1
0X
W1 45

W
10
X4
5

W1

TR8
0x4
0 x45 5
W1

W12x45 RING CONNECTOR


DETAIL OF RING CONNECTOR
SCALE: 1: 100 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
DETAIL OF RING CONNECTOR ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 17
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 4 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
1 2 3 4 5

SEE TOP CHORD JOINT DETAIL

W4x13
45 W1
2x 2x4
W1 5
PROVIDE 6MM THK STIFFENER PLATE SPACED AT 2.00M

W12x45

W12x45
W12x26 W12x26

SEE CONNECTION 1 DETAIL SEE CONNECTION 2 DETAIL


5 SEE BASE PLATE 1 DETAIL SEE BASE PLATE 1 DETAIL W1
2x4 2x4
W1 SEE VERTICAL WEB JOINT DETAIL 5

SEE BASE PLATE 2 DETAIL


TRUSS 1 SEE BASE PLATE 2 DETAIL
SCALE: 1:100 MTS.

1 2 3 4 5

SEE TOP CHORD JOINT DETAIL

W4x13
W12x26 W12x26

2x4
5 SEE VERTICAL WEB JOINT DETAIL W12x
W1 45
W12x45

W12x45
SEE BASE PLATE 1 DETAIL SEE BASE PLATE 1 DETAIL
45 W1
2x4
W 12x 5
PROVIDE 6MM THK STIFFENER PLATE SPACED AT 2.00M

TRUSS 2
SEE BASE PLATE 2 DETAIL SCALE: 1:100 MTS. SEE BASE PLATE 2 DETAIL

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
TRUSS 1 ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE TRUSS 2 DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 18
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 5 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
2' 3 4' 2' 3 4'
C B A C B A
A B C A B C
SEE TOP CHORD JOINT DETAIL SEE TOP CHORD JOINT DETAIL

W4x13
W4x13
W12x26 W12x26
5 W1
12x4 2x4
5 W1
W 45
W1
2x SEE VERTICAL WEB JOINT DETAIL 2x45
W12x45

W12x45

W12x45
PROVIDE 6MM THK STIFFENER PLATE SPACED AT 2.00M

W12x45
PROVIDE 6MM THK STIFFENER
W12x26 W12x26 PLATE SPACED AT 2.00M
SEE CONNECTION 1 DETAIL SEE CONNECTION 1 DETAIL SEE CONNECTION 1 DETAIL SEE CONNECTION 1 DETAIL
SEE VERTICAL WEB JOINT DETAIL

TRUSS 5 TRUSS 6
SCALE: 1:125 MTS. SCALE: 1:125 MTS.

2' 3 4'
A' A'' A B
C B A
A B C
2 - C6x13 2 - C6x13 2 - C6x13 2 - C6x13
2-
PROVIDE 6MM THK STIFFENER L7
x6 2

W4x13
PLATE SPACED AT 2.00M 5 -L x8 5x
-C 75
2
75
x7 x 75 x8
W12x26 W12x26 5x 75 5
2 - L75x75x8 8 -L x4
2 10
5 W1 W
W4x13

2x4 2x4 2 - L75x75x8


W1 5
5x
6 2
-L
-C 75 5 x8
W12x45

x7
W12x45
2 x7
5x 75
W12x26 W12x26 8 -L
2
2 - L75x75x8 2 - L75x75x8 2 - L75x75x8
SEE CONNECTION 1 DETAIL SEE CONNECTION 1 DETAIL
SEE VERTICAL WEB JOINT DETAIL

TRUSS 7 TRUSS 8
SCALE: 1:125 MTS. SCALE: 1:125 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
TRUSS 5 ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE TRUSS 6 DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH TRUSS 7
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 19
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE) TRUSS 8
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 6 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
165
6
10

2' 3 4'

290
C B A
A B C 10

W12x26
SEE TOP CHORD JOINT DETAIL

204

15
9.0000

5 W1
0x4 0x4
W1 5

277
15

W12x45

TRUSS 9
103
7
9
TRUSS 9

88
SCALE: 1:125 MTS.
9

W4x13

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
TRUSS 9 ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 20
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 7 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
20 50 50 50 50
90x12x270 Gr. A36 PLATE 6 20 50 50
25 25
. A3
5 X M16 A325ST/N 90x12x210 Gr 25 25 90x12x170 Gr. A36 PLATE
Gr. A36 PLATE x8
75 3 X M16 A325ST/N
5x
3 X M16 A325ST/N L7
2-
45 45
2-C5x6 Gr. A36

45
25
45.0000

2-L75x75x8 Gr. A36

45
25 50

45
10.0MM FULL WELD, E70XX 50
6 60 10.0MM FULL WELD,
10
E70XX
10.0MM FULL
6
CLEAT 1 DETAIL WELD, E70XX
CLEAT 2 DETAIL

CLEAT 3 DETAIL

160 50 50
2- 50 50 130
25 25 250x12x310 Gr. A36 PLATE L7
5x 25 25
6 x M16 A325ST/N 7 5x 50
8G 50
r.
A3 50
6 25
3 x M16 A325ST/N
50

2-C5x6 Gr. A36 300x12x280 Gr. A36 PLATE


3 x M16 A325ST/N

6.0MM FULL WELD,


2- 6 2-L75x75x8 Gr. A36
50 L7 E70XX
5x 6.0MM FULL WELD,
5205 75 3 x M16 A325ST/N 6
50 x8 E70XX
G r.
A3 3 x M16 A325ST/N
6
25
36
GUSSET PLATE 1 DETAIL r.A 50
G 50
5 x8
x7
L 75 280
2-

GUSSET PLATE 2 DETAIL

DETAIL OF BRACING-A
SCALE: 1: 15 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
DETAIL OF BRACING-A ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 21
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 8 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
C D E
SEE RING
CONNECTION DETAIL

SEE GUSSET PLATE


2 - C6x13 2 - C6x13DETAIL 2 - C5x6
1 2 - C5x6 2 - C5x6 2 - C5x6 2 - C5x6 2 - C5x6 2 - C5x6 2 - C5x6
2- SEE BRACING 8 2- 8 2-
L7 5x L7 5x L7

W4x13
5x 1 DETAIL x7 5x 5x
7 5x
75 L 75 75 L7 75
x8 x8 x8
W 2- 2-
10
x4 2 - L75x75x8 2 - L75x75x8 2 - L75x75x8 2 - L75x75x8 2 - L75x75x8 2 - L75x75x8 2 - L75x75x8 2 - L75x75x8
5 2-
L7
5 x7 GUSSET PLATE 2 2 2-
x 8 -L x 8 8
5x
8 75 DETAIL 75 75 L7 75x
5x x7 5x 5x 5x
L 7 5x L7 75 L7
x8
2- 8 2- 2-
SEE BRACING
3 DETAIL

TRUSS 3
SCALE: 1: 100 MTS.

340
340
170 170 6.0MM FULL WELD,
170 170 6.0MM FULL WELD, 6
204 6 E70XX
9 E70XX
16 12
55

120
44 12

120

80
11

80
9

240
8
240
5.0000

80
120
225

80
120
17.5000
111
135

42.5000

8 W12x45 Gr. A36


9 W12x45 Gr. A36
16 240x12x340 Gr. A36 PLATE
240x12x340 Gr. A36 PLATE
2 - C6x13 2 - C5x6 4 X M16x400 A325ST/N
W10x45 90 90
4 X M16x400 A325ST/N 90 90

BASE PLATE 2 DETAIL BASE PLATE 1 DETAIL


SCALE: 1:10 MTS. SCALE: 1:10 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
TRUSS 3 ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE BASE PLATE 1 DETAIL DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH BASE PLATE 2 DETAIL
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 22
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 9 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
COMPLETE JOINT
PENETRATION GROOVE WELD, E70XX
W12x45 Gr. A36
8.00MM FULL WELD ALL
8 AROUND EACH PLATE, E70XX 6.00MM FULL WELD TO COLUMN, E70XX
6 6
95x12x277 Gr. A36 170x12x300 Gr. A36 PLATE
2 x 120x12x220 Gr. A36 PLATE 50 70 70 70 8 x M16 A325ST/N IN 2 COLS.
AT 100 GAUGE

80
W12x45 Gr. A36 W12x45 Gr. A36

50
170x12x300 Gr. A36 PLATE

50 50 50
4 x M16 A325ST/N IN 1 COLS.
W12x26 Gr. A36

6.00MM FULL WELD TO COLUMN, E70XX


6
70.0000

COMPLETE JOINT
PENETRATION GROOVE WELD, E70XX
6.00MM FULL WELD TO COLUMN, E70XX
6
TOP CHORD JOINT DETAIL

BOTTOM CHORD JOINT DETAIL


6.00MM FULL WELD, E70XX
6

W4x13 Gr. A36


W12x45 Gr. A36
6.00MM FULL WELD, E70XX
32 53 6
COMPLETE JOINT COMPLETE JOINT
40
PENETRATION GROOVE PENETRATION GROOVE
WELD, E70XX WELD, E70XX 95x12x320 Gr. A36 PLATE
95x12x305 Gr. A36 PLATE
150x12x250 Gr. A36 PLATE 4 x M16 A325PT/N IN 2 COLS.
W12x26 Gr. A36 AT 85.5 GAUGE
COMPLETE JOINT
50x12x290 Gr. A36 PLATE W12x45 Gr. A36 PENETRATION GROOVE
6 6.00MM FULL WELD, E70XX WELD, E70XX
6.00MM FULL WELD, E70XX
6

COMPLETE JOINT
186 PENETRATION GROOVE W12x45 Gr. A36
WELD, E70XX

VERTICAL WEB CONNECTION DETAIL

CONNECTION DETAILS
SCALE: 1: 5 MTS.
TOP CHORD JOINT DETAIL

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
CONNECTION DETAILS ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 23
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 10 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
110 50 50 10.0MM FULL
6 10 93x12x227 Gr. A36 PLATE
. A3 25 WELD, E70XX
50 Gr 250x12x310 Gr. A36 PLATE 10
10.0MM FULL
50 x8 WELD, E70XX
75 3 X M16 A325ST/N
80 25
5x
L7 100x12x170 Gr. A36 PLATE
2-
6 X M12 A325ST/N
2-L75x75x8 Gr. A36
3 X M16 A325ST/N
3 X M16 A325ST/N

25
2-L75x75x8 Gr. A36

50
25
50 2- 2-C6x13 Gr. A36

25
50
L7
277x12x290 Gr. A36 PLATE 5x
50 75
2 X M16 A325ST/N x8
Gr
10.0MM FULL .A
10 36 25 25
WELD, E70XX
25 25 20 50 50
177 50

160 50 50
25 25
2-
L7 36 97x12x277 Gr. A36 PLATE
5x .A
75
x8 Gr 10.0MM FULL
x8 10 WELD, E70XX
Gr
.A x75
3 X M16 A325ST/N 36 L75
2-

25
10.0MM FULL 3 X M16 A325ST/N

50
10 2-C6x13 Gr. A36
WELD, E70XX 210x12x420 Gr. A36 PLATE

25
2-L75x75x8 6 X M16 A325ST/N
50 2-
L7
25.
000
0

50 5x 100x12x170 Gr. A36 PLATE


25 50 50 75
50 25
50 50 x8 3 X M16 A325ST/N
11
Gr
0 0 .A
11 36

DETAIL OF BRACING-B
SCALE: 1: 10 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
DETAIL OF BRACING-B ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 24
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 11 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
0
18
3 X M16 A325ST/N

W4x13 Gr. A36


50
350x12x180 Gr. A36 PLATE 50 25 80x20x282 Gr. A36 PLATE
10.0MM FULL 25
10.0MM FULL
10 10
WELD, E70XX WELD, E70XX
100x20x340 Gr. A36 PLATE
9 X M16 A325ST/N
2-

25
L7
5x7

50 50
5x

50
8G 6

50

25
r. A3
A3 r.

25
6 5G
x4
3 X M16 A325ST/N 10 A3
6
W r.

210
5G
x4
50 10
10.0MM FULL W
50 25.
000
0

10
WELD, E70XX
16 5
0 22 100x12x260 Gr. A36 PLATE
6 X M16 A325ST/N
5
12

25
6

50
2-C6x13 Gr. A36 . A3

25
5 Gr
x4
10
W
25 25
50 50

DETAIL OF BRACING-C
SCALE: 1: 10 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
DETAIL OF BRACING-C ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 25
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 12 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
C D E F G

SEE CLEAT SEE CLEAT


1 DETAIL 2 DETAIL
2-L75x75x8 2-L75x75x8 2-L75x75x8 2-L75x75x8 2-L75x75x8 2-L75x75x8 2-L75x75x8 2-L75x75x8 2-L75x75x8 2-L75x75x8 2-L75x75x8 2-L75x75x8

x8 2-L7 x8 x8 x8
5x75 5x75 5x75 5x75 5x75
2-L7 x8 2-L7 2-L7 2-L7
SEE CLEAT
3 DETAIL

DETAIL OF STRUT
SCALE: 1: 125 MTS.

50 50x12x130 20 50
25 25 Gr. A36 PLATE 25 25 50x12x120 Gr. A36 PLATE
2 X M16 A325ST/N 6
2 X M16 A325ST/N r. A3 3 X M16 A325ST/N
90x12x210 x75 x8 G
5
Gr. A36 PLATE 2-L7

25
35

25
25

25
2-L75x75x8 Gr. A36 2-L75x75x8 Gr. A36

45
25
115

25
6 50
r. A3
x8 G
5x75 30
2-L7 25
10.0MM FULL WELD,
50 10.0MM FULL 10.0MM FULL 10
6 6 E70XX
WELD, E70XX WELD, E70XX
CLEAT 1 DETAIL CLEAT 3 DETAIL CLEAT 2 DETAIL

DETAIL OF STRUT-B
SCALE: 1: 10 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
DETAIL OF STRUT-B ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 26
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 13 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
W4 X 13
AS
FA
BR
IC
AT
ED
AS
W1 PL
45 2X
AN
2X

W12 X 45

W12 X 45
W1 ACT
45
UAL

W12 X 26
W12 X 45

W12 X 45
DETAIL OF TRUSS 1
SCALE: 1:100 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
DETAIL OF TRUSS 1 ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 27
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 14 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
W4 X 13
W12 X 26

5 W1
2 X4 2X

W12 X 45

W12 X 45
W1 45
W12 X 45

W12 X 45
EXISTING EXISTING

DETAIL OF TRUSS 2
SCALE: 1:100 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
DETAIL OF TRUSS 2 ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 28
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 15 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
W1
2X

W12 X 45
45
D2

D1

EXISTING DETAIL OF CONCRETE GUTTER


SCALE: 1:100 MTS.

12mmØ VERT. & HOR. RE-BARS


SPACED @200mm O.C.B.W

100mm Concrete

FABRICATED STONE SPOUT

D2
D1
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
DETAIL OF CONCRETE GUTTER ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 29
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 16 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
340
170 170 340
170 170

W12x45 Gr. A36


W12x45 Gr. A36

240x12x340 Gr. A36 PLATE


240x12x340 Gr. A36 PLATE
25MM Ø HIGH TENSILE NUT
25MM Ø HIGH TENSILE NUT
W/ LOCK WASHER
W/ LOCK WASHER
(COURSE THREAD)
25mmØ HIGH TENSILE NUT W/ (COURSE THREAD)
W/ LOCK WASHERS
16MM Ø FABRICATED 16MM Ø FABRICATED
(COURSE THREAD)
HIGH TENSILE BOLT HIGH TENSILE BOLT
(COURSE THREAD) (COURSE THREAD)
EXISTING WOOD TIMBER BASE EXISTING WOOD TIMBER BASE
16mmØ FABRICATED HIGH
TENSILE BOLT
(COURSE THREAD)

340
170 170 6.0MM FULL WELD, 340
170 170 6.0MM FULL WELD,
6 E70XX
6 E70XX

4000
120

120
80

80
240

240
80

17.5
120

80
42.5

120
W12x45 Gr. A36
W12x45 Gr. A36
240x12x340 Gr. A36 PLATE
240x12x340 Gr. A36 PLATE
90 90 4 X M16x400 A325ST/N
90 90 4 X M16x400 A325ST/N

200

BASE PLATE 2 DETAIL


BASE PLATE 1 DETAIL HIGH TENSILE BOLT & NUT ON EXISTING WOOD TIMBER BASE
ON EXISTING WOOD TIMBER BASE ON EXISTING WOOD TIMBER BASE SCALE: 1:10 MTS.
SCALE: 1:10 MTS. SCALE: 1:5 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
BASE PLATE 1 DETAIL ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE HIGH TENSILE BOLT & NUT DATE:
REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH BASE PLATE 2 DETAIL
PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 30
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 17 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.
340 340
170 170 6.0MM FULL WELD, 170 170 6.0MM FULL WELD,
6 6
E70XX E70XX

120

120
80

80
240

240
80

80
18 43

120

120
W12x45 Gr. A36 W12x45 Gr. A36
240x12x340 Gr. A36 PLATE 240x12x340 Gr. A36 PLATE
90 90 4 X M16x400 A325ST/N 90 90 4 X M16x400 A325ST/N

BASE PLATE 3 DETAIL BASE PLATE 4 DETAIL

W12x45 Gr. A36 W12x45 Gr. A36

240x12x340 Gr. A36 PLATE 240x12x340 Gr. A36 PLATE


25MM Ø HIGH TENSILE NUT 25MM Ø HIGH TENSILE NUT
W/ LOCK WASHER W/ LOCK WASHER

16MM Ø FABRICATED 16MM Ø FABRICATED


HIGH TENSILE ANCHOR BOLT HIGH TENSILE ANCHOR BOLT

600 600
BASE PLATE DETAIL
ON CONCRETE PEDESTAL
SCALE: 1:10 MTS.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENT: REVIEWED : SUBMITTED: RECOMMENDED: APPROVED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MICHAEL R. RANARA
BASE PLATE DETAIL ENGINEER I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF MULTI PURPOSE DATE:

REGION V BUILDING (ST. JOHN THE BAPTIST CHURCH


PREPARED: EPEFANIA M. RECATO ANNELLE P. ANTIVOLA GUILBERT P. ROMERO RAINERO A. ZERDA FR. JONNATHAN L. CALLEJA S 31
ALBAY 1ST DISTRICT ENG'G. OFFICE CULTURAL HERITAGE SITE)
ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ROMAN CATHOLIC BISHOP OF
AIRPORT SITE, LEGAZPI CITY, ALBAY TABACO CITY, ALBAY VICENTE A MIRABALLES DATE: DATE: DATE: LEGAZPI, INC. 18 18 31
CONSULTANT ENGINEER DATE: DATE:
DATE:

NOTE: PLANS BASED ON THE PARTIAL VALIDATION, EVALUATION AND AS-BUILT PLAN PREPARED
BY THE ROMAN CATHOLIC BISHOP OF LEGAZPI, INC. AND THIS OFFICE.