Professional Documents
Culture Documents
802870-D Optistar LE PM Checklist
802870-D Optistar LE PM Checklist
802870-D Optistar LE PM Checklist
Liebel-Flarsheim
Optistar LE
TM
Preventive Maintenance
Checklist
This preventive maintenance checklist is a guide for maintenance personnel. The service functions listed
in this document can be found in chapters of Service Manual 802701 and Installation Manual 802702.
WARNING!
Preventive Maintenance on Injector must be performed by a Qualified Technician who is completely
familiar with its use and operation; trained by the manufacturer in the area of performing preventive
maintenance on the Injector; and familiar with the content of the Operator’s and the Installation and
Service manual.
CUSTOMER NAME:
ADDRESS:
CONTACT PERSON:
ROOM NUMBER:
PRINT NAME:
SIGNATURE:
DATE:
NOTE: Software Versions are displayed during power-up and are on the Set-up Screen.
Pressure Gauge
Gauss Meter
8. Flow Rate/Volume Check procedure. 12. Visually check Powerhead covers, con-
(Refer to Section 4.2.8) nectors, support arm, and syringe adap-
tor for damage (Refer to Section 4.2.2).
Total Time: A + B
(1:06 - 1:14) _____:_____ min:sec
4.3.1 CONSOLE OPERATIONS
Front Wiper Location A
(4ml - 6ml) 1. Check system ON/OFF button.
___________ ml
2. Verify correct date and time settings.
Front Wiper Location B
(4ml - 6ml) 3. Check touchscreen is functioning
___________ ml properly.
4. Inspect Remote Start Switch button op-
eration. (Refer to Section 4.3.2)
❑ N/A (not available at customer site)
5. Visually Check Console assembly for
damage.
6. Console cable connection are secured
using ty-wrap.
_______________________________________
CABLE CONNECTIONS
_______________________________________
1. Cable connections are secured at each
injector Component.
_______________________________________