CONSTRUCTION NOTES

1. BASIC REFERENCE CODE:IS 456-2000


2. CONCRETE GRADE:M20
3. STEEL:FE415
C1 PB1 C2 PB2 C3 PB3 C4 4. CONCRETE SHALL BE WEIGHT BATCHED,MACHINE MIXED
AREA STATEMENT &MECHANICALLY VIBRATE TO ASSURE FULL COMPACTION.

1) GROUND FLOOR AREA = 262.36 sq. m 5. COVER OF STEEL:FOR BEAMS-25mm


2) FIRST FLOOR AREA = 262.36 sq.m FOR COLUMN-40mm
5.58m
3) SECOND FLOOR AREA = 262.36 s FOR SLAB-20mm
PB4 PB5 PB6 PB7
6. TOP &BOTTOM OF CANTILIVERS MUST BE ANCHORED

PARAPET FOR A MINIMUM LENGTH INTO PARENT BEAM


7. QUALITY WORK AND THE SAFETY AT SITE ARE THE
C5 PB8 C6 PB9 C7 PB10 C8 RESPONSIBILITY SOLELY LIE WITH
DISCRIPTION SYMBOL
CONTRACTOR/BUILDER/OWNER WE SHALL NOT
1m

BRICK MASONRY
RESPONSIBLE FOR POOR QUALITY OF STEEL,CONCRETE
MURUM CURING,SHUTTERING ORINCORRECT CONSTRUCTION
DADO PROCEDURE.
PB14
3m

TILES PB11 PB12 PB13 RUBLE MASONARY


8. DIMENSIOND SHOULD NOT BE SCALE OUT FROM THE DRAWING

CONCRETE & SHOULD TAKEN AS SHOWN.


9. APLICATION OF OIL TO THE SHUTTERING IS NOT ALLOWED,
BRICK MASONRY
PB15 PB16 PB17 BRANDED SHUTTERING REMOVERS SHOULD BE USED.
C9 C15
C10 C11 10. DE-SHUTTERING PERIOD FOR VARIOUS STRUCTURAL
3m

MEMBERS.
A.VERTICAL FACES OF BEAM &COLUMN:AFTER 24 HR
B.SLAB SPANNING UPTO 4 M: AFTER 07 DAYS
PB18 PB19 PB20
C.SLAB SPANNING OVER 4M:AFTER14 DAYS
3m

D. BEAM SPANNING UPTO 4M:AFTER 14 DAYS


E. BEAM SPANNING OVER 4M:AFTER 21 DAYS

0.15m
STRENGTH GAIN OF CONCRETE TILL THE TIME OF
PB25 DE-SHUTTERING SHOULD BE ASSURED. DE-SHUTTERING
1.5m

CANTILEVER STRUCTURAL MEMBERS TO BE CARRIED OUT


PCC
MURUM

PB21 PB22 C14 PB23 C15 PB24 AFTER WRITTEN PERMISSION OF DESIGNER.
RUBLE
C16
C13 11. BEFORE CASTING SLAB OR BEAM,THE DUCTING FOR THE

ELEVATION PB26 PB27 ELECTRICAL WIRING SHALL BE PROVIDED AT APPROPRIATE


SECTION x-x
LOCATION.
12. STEEL SHOULD BE TESTED BEFORE USE AND TESTING
C17 C18 REPORT SHOULD BE SUBMITTED.
PB28
13. R.C.C FRAMED STRUCTURE WITH INTERNAL WALL 200mm
PLINTH LEVEL STRUCTURAL PLAN AND EXTERNAL WALL 300mm.
14. GYPSUM FINISH INTERNAL PLASTER AND SAND FINISH PLASTER
EXTERNALLY.
15. DESIGNER CONCEPT WALL TILE AND 600*600*50 mm FLOOR TILES.
16. SAFETY GRILLS FOR WINDOWS.

SCHEDULE OF OPENING
SR.NO. NAME NUMBERS SIZE (M) DESCRIPTION

12.55m
1 D 2x2.1 TWO PANNELED
W2 V V W2 W2 V V W2 1 DOOR
C1 B1 C2 B2 C3 B3 C4
D1 4 1x2.1 TWO PANNELED
WC 2
WC BATH. DOOR
BATH.
1.5X2 2X2 1.5X2
2X2 BEDROOM BEDROOM
BEDROOM BEDROOM 0.7x2 PVC DOOR
W1 4X5 m. D2 D2 4X5 m. W1 3 D2 4
4X5 m. D2 D2 4X5 m. W1

5.3m
W1
B4 B5 B6 B7
S1 S2 S3 2x2.1 ALUMINIUM
4 W 4
SLIDING DOOR
D1 D1 D1
D1
C5 B8 C6 B9 C7 B10 C8 5 2x1.2 ALUMINIUM
5 W1
FIXED DOOR
D1 D1 D1
D1
4 0.6x0.5 LOUVRED
6 V
VENTILATION
W1 W1 W1 W1

5.3m
KITCHEN BEDROOM KITCHEN BEDROOM B11 B12 B13 B14
DINING ROOM 4X5 DINING ROOM
4X5 4X5 m. 4X5 m.
S4 S5 S6

20.55m
B15 B16 B17
C9 C15
WC C10 C11
D1 WC D1
V 1.5X2 V
1.5X2 D2
D2

D2 D2
BATH. HALL BATH. V B20
BALCONY HALL V BALCONY B18 B19
2X2 5.3X7 2X2
5.3X7

7.3m
S9
D1 S7 S8
D1

GUEST ROOM GUEST ROOM W2 B25


W2
2.9X4 2.9X4

B21 B22 C14 B23 C15 B24


D1 D1 C16
C13
B26 B27
2.8m 2.85m

S10
S11

2.8m 2.85m
C17
2.93m B28
6.9m
C18
JSPM & TSSM
FIRST FLOOR PLAN SECOND FLOOR PLAN NAME OF INSTITUTE = ICOER WAGHOLI

GROUND FLOOR PLAN NAME = SINGH YUVRAJSINGH MAHENDRA


FOUNDATION PLAN
ROLL NO. = 66 DIV. = TE (A)
TITLE = G+2 MULTISTORIED BUILDING