FACILITY DESIGN

PROJECT 5: LAYOUT DESIGN & MATERIAL


HANDLING

Lecturer : Anastasia Lidya Maukar S.T., M.Sc., M.MT.

Semester :V

Date : 28th February 2022

Member 1. Alivia Aulia Chairunnisa 004202000063

2. Andhyka Jeannataya Cikatania 004202000037

3. Ardia Bintang Fajar Kusuma 004202000029

4. Farel Abdurrahman 004202000002

5. Rizg Safa Lintang 004202000022

INDUSTRIAL ENGINEERING

PRESIDENT UNIVERSITY

Jababeka Education Park, Jl. Ki Hajar Dewantara, Kota Jababeka, Cikarang Baru,

Bekasi 17550 – Indonesia

Phone (021) 8910 9762-6, Fax (021) 8910 9768

Email: enrollment@president.ac.id, http://www.president.ac.id


ACKNOWLEDGEMENT
TABLE OF CONTENT
CHAPTER I
INTRODUCTION
1.1.
Background

1.2.
Objectives
CHAPTER II
METHODOLOGY
2.1. Collect Data and Information Needed

2.2. Transform the ARD into ADD

2.3. Generate the Initial Layout of Office, Production Floor, and Plant
Layout Using Algorithm

2.4. Compare All of the Layout

2.5. Determine the Material Handling Equipment

2.6. Calculate the Material Handling Cost


CHAPTER III
DATA COLLECTION
3.1. Space Requirement for Office

3.2. Space Requirement for Factory

3.3. Space Requirement for Production Floor

3.4. Activity Relationship Chart and Activity Relationship Diagram for


Office

3.5. Activity Relationship Chart and Activity Relationship Diagram for


Factory

3.6. From-to-Chart of Production Floor

3.7. Material Handling Cost


CHAPTER IV
DATA ANALYSIS
4.1. Generate of Office Layout

4.2. Generate of Production Floor Layout

4.3. Generate of Plant Layout

4.4. Optimum Layout of Each Layout

4.5. Calculation of Material Handling Cost

4.6. Calculation of Material Handling Equipment

4.7. Determination of Operator


CHAPTER V
CONCLUSION
REFERENCES