SUNWAY CONSTRUCTION SDN BHD

PROJEK KLCC P1

HAZARD & EFFECT REGISTER (HER)

DIV/DEPT : SUNWAY CONSTRUCTION DESCRIPTION OF ACTIVITY : HOT WORK PREPARED BY : ZAHRUL HUZAIRI HUSSIN

LOCATION : KLCC HER NO : 04 REV NO : 00 REVIEWED BY : CAPT. (R) NOOR AZMI SHARIF

TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 20 / 02 / 2014 Page : 1 of 3 APPROVED BY : RAMDANI MOHD AWI
Hazard (1) Threat (6) Barrier (7) Top Event (2) Control / Recover Consequences (3) Risk Rating (4) Initial Risk Final Risk Level Remedial Action
Measure (8) P A E R Level (5) (9) Plan (10)
1. Sub-activity : - Cutting using oxy acetylene
Leaking of hose Negligence of Periodically Explosion Sign board of “Danger Fatality H M M H H M Nil
or connection worker / welder inspection. Fire / Hot Work” being
while doing hot Soapy test. place near the site,
work Toolbox to Re-brief workers and
No periodic the welder operator before start
inspection. and workers the stated works,
Fail to do soapy Ensure the movement,
test guage Check gauge, hose
indicator in a and connection
good between tank and
condition hose connection.
Ensure Change to the new
follow hot hose, gauge and tank.
work Emergency Recovery
procedure Team
SOP Special toolbox by
All work treat
forces must
wearing
PPE,

Revision No.: 02, Date : 20/02/2014 Issues No.: 01 Effective Date: 01/03/2009
Page 1 of 3
SUNWAY CONSTRUCTION SDN BHD
PROJEK KLCC P1

HAZARD & EFFECT REGISTER (HER)

DIV/DEPT : SUNWAY CONSTRUCTION DESCRIPTION OF ACTIVITY : HOT WORK PREPARED BY : ZAHRUL HUZAIRI HUSSIN

LOCATION : KLCC HER NO : 04 REV NO : 00 REVIEWED BY : CAPT. (R) NOOR AZMI SHARIF

TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 20 / 02 / 2014 Page : 2 of 3 APPROVED BY : RAMDANI MOHD AWI
Hazard (1) Threat (6) Barrier (7) Top Event (2) Control / Recover Consequences (3) Risk Rating (4) Initial Risk Final Risk Level Remedial Action
Measure (8) P A E R Level (5) (9) Plan (10)
2. Sub-activity : - Welding using gen set / electrical welder set
Damage of wire Negligence of Periodically Explosion Sign board of “Danger Fatality H M M H H M Nil
cable worker / welder inspection. Fire / Hot Work” being
while doing hot Toolbox to Electrocution place near the site,
work the welder Re-brief workers and
No periodic and workers operator before start
inspection. Ensure the the stated works,
Fail to do gen set in a movement,
replace the good Check gen set and
damage wire condition wire cable and ensure
cable Ensure all the equipment in a
follow hot good condition.
work Emergency Recovery
procedure Team
SOP Special toolbox by
All work treat
forces must
wearing
PPE,

Revision No.: 02, Date : 20/02/2014 Issues No.: 01 Effective Date: 01/03/2009
Page 2 of 3
SUNWAY CONSTRUCTION SDN BHD
PROJEK KLCC P1

HAZARD & EFFECT REGISTER (HER)

DIV/DEPT : SUNWAY CONSTRUCTION DESCRIPTION OF ACTIVITY : HOT WORK PREPARED BY : ZAHRUL HUZAIRI HUSSIN

LOCATION : KLCC HER NO : 04 REV NO : 00 REVIEWED BY : CAPT. (R) NOOR AZMI SHARIF

TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 20 / 02 / 2014 Page : 3 of 3 APPROVED BY : RAMDANI MOHD AWI
Hazard (1) Threat (6) Barrier (7) Top Event (2) Control / Recover Consequences (3) Risk Rating (4) Initial Risk Final Risk Level Remedial Action
Measure (8) P A E R Level (5) (9) Plan (10)

PREPARED BY : ……………………………………… APPROVED BY : …………………………………..(PIC) SUPERVISOR : ……………………………………..

NAME: ZAHRUL HUZAIRI HUSSIN NAME: RAMDANI MOHD AWI NAME:

Revision No.: 02, Date : 20/02/2014 Issues No.: 01 Effective Date: 01/03/2009