SUNWAY CONSTRUCTION SDN BHD

PROJEK KLCC P1

HAZARD & EFFECT MANAGEMENT PROCESS (HEMP)


DESCRIPTION OF JOB : PILE CONSTRUCTION WITH PREPARED BY : NOR MUHD AFIQ B. NOR ZAMBRI
DIV/DEPT : SUNWAY CONSTRUCTION
PLUNGE IN COLUMN
REVIEWED BY : ZAHRUL HUZAIRI
LOCATION : KLCC HER NO : 09 REV NO : 00
APPROVED BY :
TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 05 / 03 / 2014 PAGE :
Hazard (1) Threat (6) Barrier (7) Top Event Control / Recover Consequence Risk Rating (4) Initial Risk Final Risk Level Remedial Action
(2) Measure (8) s (3) P A E R Level (5) (9) Plan (10)
1) Sub-activity:- Preparation of Plunge in Column
Worker involve Not experience Engage experience Health Emergency Minor Injuries M - M M M L Nil
in using of worker, no worker when handling Problem, Recovery Team,
Hazardous awareness from with highly hazardous Skin Re-Brief to the
Chemical as worker, no chemical, Toolbox, Problem worker, provide
protective supervision Induction, Supervisor wash pipe if contact
coating and from supervisor, explain to workers directly with
primer paint. handling regarding requirement chemical
chemical of the chemical (Refer
without follow CSDS), All chemical
the procedure need to labeled.
(CSDS)
Welding using Raining, Poor Apply PTW hotwork, Electrocution Emergency Fatality H - - M H M Nil
high voltage condition of Competent welder, Recovery Team, Re
current welding cable, using proper PPE, Brief To welders,
Welding cable Stop activity during
lay on ground rainy day, hang
welding cable using
wire cable stand
Fumes from Not wearing Toolbox, Induction, Health Emergency Major Injuries H - - M H M Nil
welding activity proper PPE Provide proper mask Problem, Recovery Team,
and radiation and welding shield eye problem Using Local exhaust
from welding ventilator (LEV)
flux
Welding near to Welding activity Toobox, Induction, Fire occur Emergency Fatality H H H H H M Nil
combustible to near with the Welding must away at Recovery Team,
material material, less least 5m from Rebrief to welders,
awareness from combustible material provide fire blanket
welders

Revision No.: 01 Issues No.: 01 Effective Date: 01/03/2009


Page 1 of 4
SUNWAY CONSTRUCTION SDN BHD
PROJEK KLCC P1

HAZARD & EFFECT MANAGEMENT PROCESS (HEMP)


DESCRIPTION OF JOB : PILE CONSTRUCTION WITH PREPARED BY : NOR MUHD AFIQ B. NOR ZAMBRI
DIV/DEPT : SUNWAY CONSTRUCTION
PLUNGE IN COLUMN
REVIEWED BY : ZAHRUL HUZAIRI
LOCATION : KLCC HER NO : 09 REV NO : 00
APPROVED BY :
TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 05 / 03 / 2014 PAGE :
Hazard (1) Threat (6) Barrier (7) Top Event Control / Recover Consequence Risk Rating (4) Initial Risk Final Risk Level Remedial Action
(2) Measure (8) s (3) P A E R Level (5) (9) Plan (10)
2) Sub-activity:- Bore pile drilling

REFER HEMP
BORE PILE
NO:7

3) Sub-activity:- Installation of reinforcement and plunge in column


Load exceed Incompetent of Operator to check of Crane Emergency Fatality H - - H H M Nil
the Safe Work signalman, load of the material topple, recovery team,
Limit of the Negligence of before lifting, full Cause wire Special Toolbox,
crane (SWL) operator and supervision by rope snap Re-Brief to the
and SWL of the signalman supervisor, Induction, operator and
wire rope toolbox and etc signalman

Material left Negligence of Induction, Toolbox, Wire rope Emergency Fatality H H - H H M Nil
hanging operator Briefing on operator snap, main recovery team,
duties and full block fall Special Toolbox,
supervision by down Re-Brief to the
supervisor operator and
signalman/ dismiss
the operator crane
Third party inspection,
Wear and tear No daily Daily check by Wire rope Emergency Fatality H H - H H M Nil
of wire rope/ inspection from operator, Induction, snap or recovery team,
loosen or crack operator, colour coding of lifting boom breaks Special Toolbox
of the machine machine too old rope, engage
competent operator
and valid PMA of
lifting machine

Revision No.: 01 Issues No.: 01 Effective Date: 01/03/2009


Page 2 of 4
SUNWAY CONSTRUCTION SDN BHD
PROJEK KLCC P1

HAZARD & EFFECT MANAGEMENT PROCESS (HEMP)


DESCRIPTION OF JOB : PILE CONSTRUCTION WITH PREPARED BY : NOR MUHD AFIQ B. NOR ZAMBRI
DIV/DEPT : SUNWAY CONSTRUCTION
PLUNGE IN COLUMN
REVIEWED BY : ZAHRUL HUZAIRI
LOCATION : KLCC HER NO : 09 REV NO : 00
APPROVED BY :
TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 05 / 03 / 2014 PAGE :
Hazard (1) Threat (6) Barrier (7) Top Event Control / Recover Consequence Risk Rating (4) Initial Risk Final Risk Level Remedial Action
(2) Measure (8) s (3) P A E R Level (5) (9) Plan (10)
Workers pass No awareness Induction, Toolbox, Worker been Emergency Fatality H - - H H M Nil
by lifting area of workers Signalman, tagline hit by recovery team,
material
during lifting Special Toolbox

Worker work No proper Toolbox, induction, Falling into Emergency Fatality H - - H H M Nil
near to deep platform when Provide proper bore pile Recovery Team,
hole working near to platform for workers hole Rebrief to the
bore pile hole, working on guide worker, provide
Top of the frame, supervisor to special barricade
casing left too ensure top of the and worker wearing
short casing left at least 1m harness when
from the ground level, working near to
full supervision by deep hole
supervisor
4) Sub-activity:- Pouring of concrete
Lorry concrete No person Full supervision by Worker been Emergency Fatality H - - H H M Nil
reverse and not control the lorry
supervisor, provide hit by recovery team,
alert of the concrete when whistle to worker concrete Special Toolbox,
workers behind reverse control lorry concrete, lorry when provide stopper for
provide sufficient reverse to lorry concrete while
lighting when working the bore hole reverse
at night
5) Sub-activity:- Spoil removal using excavator and lorry
Stock pile of soil Raining, Not Stock pile soil need to Erosion of Emergency Minor cases - M H M H M Nil
left unattended provide specific cover with canvas, soil Recovery Team,
on ground bin for removal Put in a specific bin toolbox, induction
of soil
Machine moving Negligence of Barricade the area, Worker hit Emergency Fatality H H - H H M Nil
left or right operator provide signage, by excavator Recovery Team
induction, toolbox Rebrief workers
Reverse Lorry Worker pass by Barricade the area, Worker Hit Emergency Fatality H - - H H M Nil
to collect soil the area, Lack toolbox, induction by Excavator Recovery Team
of vision from Rebrief workers,
Revision No.: 01 Issues No.: 01 Effective Date: 01/03/2009
Page 3 of 4
SUNWAY CONSTRUCTION SDN BHD
PROJEK KLCC P1

HAZARD & EFFECT MANAGEMENT PROCESS (HEMP)


DESCRIPTION OF JOB : PILE CONSTRUCTION WITH PREPARED BY : NOR MUHD AFIQ B. NOR ZAMBRI
DIV/DEPT : SUNWAY CONSTRUCTION
PLUNGE IN COLUMN
REVIEWED BY : ZAHRUL HUZAIRI
LOCATION : KLCC HER NO : 09 REV NO : 00
APPROVED BY :
TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 05 / 03 / 2014 PAGE :
Hazard (1) Threat (6) Barrier (7) Top Event Control / Recover Consequence Risk Rating (4) Initial Risk Final Risk Level Remedial Action
(2) Measure (8) s (3) P A E R Level (5) (9) Plan (10)
lorry driver engage one worker
with whistle to
control lorry
movement

PREPARED BY : …………………………………… APPROVED BY : …………………………………..(PIC) SUPERVISOR : ……………………………………..

NAME: NOR MUHD AFIQ B. NOR ZAMBRI NAME: RAMDANI MOHD AWI NAME:______________________________

Revision No.: 01 Issues No.: 01 Effective Date: 01/03/2009


Page 4 of 4