FISHING/MILLING JOB REPORT

Milling 13-3/8" casing damage


COMPANY DATA FISH INFORMATION FISHING TOOL
1 Name SMGP 7 Type Csg Damage 13
2 Location South East Sumatra 8 OD 13-3/8" 14
3 Region Offshore 9 Length 1-2 mtr 15
4 Country Indonesia 10 In Casing 12.4 16
5 Status Velopment 11 TOF 369.1 mtr 17
6 Project Oil & Gas Well 12 Condition 18
WELL DATA
25 Field Tango
26 Well Name SMP T 11
27 Type Horizontal
CASING DATA
No Csg Size Setting Depth
28 20" 446 mtr
29 13-3/8" 1299 mtr
30 10-3/4" 1853 mtr
31
FISHING/MILLING SUP. TOOLS
No Descp OD
32 Junk mill 12-1/4"
33 Junk sub 9-5/8"
34 Water Melon 12-1/4"
35
BHA Meter
No Descp Length
36 Junk mill 0.62
37 Bit Sub 0.91
38 12-1/4" wm 1.93
39 8" Shock Tools 3.88
40 8" Drill collar 9.34
41 12-1/8 UG STB 1.93
42 8" Drill collar 18.46
43 Crossover sub 1.28
44 6-1/2" Drill Collar 28.13
45 Crossover sub 0.27
46 6-1/2" Drilling Jar 7.23
47 6-1/2" Drill Collar 28.11
48 5" hwdp 651.8
49
50
51
Ttl. Length
Ttl. Weight (Klbs) 47
Max. WOM (Klbs) 5
REDRESS CONSUMABLES
No Descp Total
52 Tungsteen 0
53 Tunning R 0
54 Oxygen 0
55 Acetylene 0
56 Borax 0
FISHING/MILLING ACTIVITY REPORT
M/U & RIH BHA ,8-1/4" S 70 Overshoot dressed 3-3/4" Basket grapple c/w Basket grapple control, Tagged 5 klb 3886.86'
Attempt to latch, set down 10 klb, try to pick up, Confirm fish ingage to overshot
Jarring 15 time's, found string stretch 4,30' indication snaplatch come out from Black Cat Packer.
Cont'd Jarring found string raise up 6 ft, followed string weigh droped slowly to normal weight. Indication snaplatch free
Make sure fish still ingage with lowered. Confirm fish still ingage inside overshot
Pull out Overshot BHA to surface, Recovery Parted blash joint and 6" Snaplatch.

OTHER INFORMATION (MUD PROPERTY/CALIPER/SURVEY/DOWNHOLE VIDEO)


PORT Report No FM#01-07-21

age Report Date 9/14/2022

FISHING TOOLS MILLING TOOLS PERFORMANCE


Type 19 Type Junk Mill
S/N 20 S/N JM1200.04.03.21.SA
OD 21 Ttl Footage 1-1/2" mtr
Grapple 22 Ttl Hrs 1-1/2 hours
Lips Guide 23 Avg. ROP 1 mtr
Extension 24 Dull Grade 20% worn out
Job Performace
Starting Date 10 Augt 2022
Compl. Date 23 Augt 2022
Total Days 2
Total Hours 48

Reported By
Putra Nugraha

Company Man
Yanu purnomo
Subject REPAIR CASING DAMAGE
Report No FM#01-07-21
Report Date 14-Sep-22

COMPANY DATA WELL DATA


1 Name SMGP 25 Field Tango
2 Location North Sumatra 26 Well Name SMP T 11
3 Region Onshore 27 Type Horizontal
4 Country Indonesia
5 Status Development CASING DATA
6 Project Geothermal No Csg Size Setting Depth
28 20" 446 mtr
FISH INFORMATION 29 13-3/8" 1299 mtr
7 Type Casing Damage 30 10-3/4" 1853 mtr
8 OD 13-3/8" 31
9 Length 1 mtr
10 In Casing 13-3/8" FISHING/MILLING SUP. TOOLS
11 TOF 369.1 mtr No Descp OD
12 Condition Collapse 32 Overshot
33 Mouse Trap
FISHING TOOLS 34 Junk mill 12-1/4"
13 Type _ 35 IB 12-1/4"
14 S/N _
15 OD _ BHA Meter
16 Grapple _ No Descp Length
17 Lips Guide _ 36 Junk mill 0.62
18 Extension _ 37 Bit Sub 0.91
38 12-1/4" WM 1.93
MILLING TOOLS PERFORMANCE 39 8" Shock Tools 3.88
19 Type Junk Mill 40 8" Drill collar 9.34
20 S/N JM1200.04.03.21.SA 41 12-1/8 UG STB 1.93
21 Ttl Footage 1-1/2 mtr 42 8" Drill collar 18.46
22 Ttl Hrs 1-1/2 Hours 43 Crossover sub 1.28
23 Avg. ROP 1.00 mtr/Hr 44 6-1/2" Drill Collar 28.13
24 Dull Grade 20% Worn Out 45 Crossover sub 0.27
46 6-1/2" Drilling Jar 7.23
REDRESS CONSUMABLES 47 6-1/2" Drill Collar 28.11
No Descp Total 48 5" hwdp 651.8
52 Tungsteen _ 49
53 Tunning R _ 50
54 Oxygen _ 51
55 Acetylene _
56 Borax _
Ttl. Weight (Klbs) 47
FISHING/MILLING ACTIVITY REPORT

RIH 12-1/4” Impression Block ( bha #1 ) from surface to tagged at 369.12 mMD. w/10 Klbs, POOH and get ma
RIH 12-1/4” Flat Bottom Junk Mill ( BHA #2 ) from 40 mMD to 369.13 mMD. Tagged 10 Klbs. Milling with 12-1/4” Flat Bottom Junk Mill Assy from 36
POOH 12-1/4” Flat Bottom Junk Mill Assy from 371 mMD to Surface., Result: 12-1/4” Flat Bottom Mill Under gauge 1/2", 12-1/4'' Water melon Unde
M/U and RIH 12-1/4” TCI + Water Melon BHA Polish ( #3 ) from surface to 321 mMD. Milling and polish with 12-1/4” Flat Bottom Junk Mill Assy from
Reaming from 369.5 mMD to 371 mMD. top rotary, work pipe interval 369 mMD - 371 mMD (2X), No Obstruction

OTHER INFORMATION (MUD PROPERTY/CALIPER/SURVEY/DOWNHOLE VIDEO)

JOB PERFORMANCE
Starting Date 10 Augt 2022 Reported by Putra Nugraha
Compl. Date 23 Augt 2022 Company Man Yanu purnomo
Total Days 2
Total Hours 48
w/10 Klbs, POOH and get mark 1-4 round IB damage
/4” Flat Bottom Junk Mill Assy from 369.13 mMD to 369.51 mMD.
gauge 1/2", 12-1/4'' Water melon Under gauge 1/2"
12-1/4” Flat Bottom Junk Mill Assy from 369.13 mMD to 369.51 mMD.
mMD (2X), No Obstruction
MILL SHEET PARAMETER
Date : 10 AGUSTUS 2022 Well Name : SMP T 11

PUMP PRESSURE
NO TIME DEPTH R/W P/UP WT S/O WT ROP/ Mtr RPM SPM
ON
1 4:30 369.13 108 107 105 60-65 80 60
2 5:00 369.51 108 107 105 0.4 60-65 80 60
3 6:00 371 108 107 105 1 50-60 80 60
4
5
6
7
8
9
10
11
12
22

MILLING BHA : 12-1/4" Junk mill + bit sub + 12-1/4" water melon +8" shock tools + 12_1/8" UG STB +
1 X8" DC + X/O + 3X 6-1/2" DC + X/O + 6-1/2" DRILLING JAR + 3x 6-1/2" DC + 21 5"
HWDP

Junk mill
Bit Sub
12-1/4" WM
8" Shock Tools
8" Drill collar
12-1/8 UG STB
8" Drill collar
Crossover sub
6-1/2" Drill Collar
Crossover sub
6-1/2" Drilling Jar
6-1/2" Drill Collar
5" hwdp
ET PARAMETER
Fishing engineer : Putra Nugraha

PUMP PRESSURE TORQUE FLOW RATE/ GPM MUD WT WOB COMMENT


OFF ON OFF ON Ann IN OUT
50 7.3 4.6 300 600 8.6 8.7 2-5 Start milling
50 7.3 4.6 300 600 8.6 8.7 2-5 Sweep Hi visc 40 bbl
50 7.3 4.6 300 600 8.6 8.7 0 Reaming
Client: Location: Well no: Bha#:
KS ORKA - SMGP SORIK MARAPI SMP T-11 01
Bha, Description: Date: Operator.
12-1/4" IMPRESSION BLOCK 5 Agustus 2022 SUSTRACO
BHA CONFIGURATION
LOA CUMM. FNL FN OD OD ID
CONFIGURE CONN
M Meter Inch Inch Inch Inch

5.000

P 4-1/2" IF
B 4-1/2" IF
5.000

P 6-5/8" REG
B 6-5/8" REG

8.000

P 6-5/8" REG
B 6-5/8" REG
8.000
B 6-5/8" REG
P 6-5/8" REG

0.50 10-1/2" 7-5/8" 12.250 3"


01

ACO

No. DESCRIPTION

5 5" Drill Pipe


(RIG)

4 X/O
(RIG)

3 1 X 8" DRILL COLLAR


(RIG)

2 BIT SUB

1 12-1/4" IMPRESSION BLOCK


Client: Location: Well no: Bha#:
KS ORKA - SMGP SORIK MARAPI SMP T-11 1
Bha, Description: Date: Operator.
12-1/4" BLADED JUNK MILL 6 Agustus 2022 SUSTRACO
BHA CONFIGURATION
LOA CUMM. FNL FN OD OD ID
CONFIGURE CONN
M Meter Inch Inch Inch Inch

5.000

P 4-1/2" IF
B 4-1/2" IF
5.000

P 4-1/2" IF
B 4-1/2" IF
28.11 85.21 0.42 6 5/8" 6.500 2 15/16"

P 4-1/2" IF
B 4-1/2" IF
7.03 57.10 0.38 6.500 6.500 2.250
B 4-1/2 IF
P 4-1/2" IF
0.27 50.07 0.27 7.000 7.000 2.875
P 4-1/2" IF
B 4-1/2" IF
28.13 49.80 0.42 6 5/8" 6.500 2 15/16"

P 4-1/2" IF
B 4-1/2" IF
1.28 21.67 0.59 6.750 8 13/16" 2 13/16"
P 6-5/8" REG
B 6-5/8" REG
18.46 20.39 0.55 8.000 8.000 3.000

P 6-5/8" REG
B 6-5/8" REG
1.93 1.93 0.74 8.000 12.125 2 13/16"

P 6-5/8" REG
B 6-5/8" REG

9.34 9.34 0.55 8.000 8.000 3"


P 6-5/8" REG
B 6-5/8" REG
3.88 7.34 1 8.000 8.000 2 7/8"

P 6-5/8" REG
B 6-5/8" REG
1.93 3.46 0.74 8.000 12.125 2 13/16"

P 6-5/8" REG
B 6-5/8" REG
0.91 1.53 0.91 8 1/16" 8 1/16" 2 7/16"
B 6-5/8" REG
P 6-5/8" REG

0.62 0.62 0.25 8.000 12.250 3 1/4"


1

ACO

No. DESCRIPTION

15 5" Drill Pipe


(RIG)

13 21 X 5" HWDP
(RIG)

12 3 X 6.5" DRILL COLLAR


(RIG)

11 6-1/2" DRILLING JAR


(RIG/RHIRD PARTY)

10 X/O (RIG)

9 3 X 6.5" DRILL COLLAR


(RIG)

8 X/O (RIG)

7 2 X 8" DRILL COLLAR


(RIG)

6 12-1/8" UG STABILIZER

5 1 X 8" DRILL COLLAR


(RIG)

4 8" SHOCK TOOL


(THIRD PARTY)

3 12-1/8" UG STABILIZER

2 BITSUB (RIG)

1 12-1/4" FLAT BOTTOM JUNK MILL


Client: Location: Well no: Bha#:
KS ORKA - SMGP SORIK MARAPI SMP T-11 1
Bha, Description: Date: Operator.
12-1/4" BLADED JUNK MILL 7 Agustus 2022 SUSTRACO
BHA CONFIGURATION
LOA CUMM. FNL FN OD OD ID
CONFIGURE CONN
M Meter Inch Inch Inch Inch

5.000

P 4-1/2" IF
B 4-1/2" IF
5.000

P 4-1/2" IF
B 4-1/2" IF
28.11 85.21 0.42 6 5/8" 6.500 2 15/16"

P 4-1/2" IF
B 4-1/2" IF
7.03 57.10 0.38 6.500 6.500 2.250
B 4-1/2 IF
P 4-1/2" IF
0.27 50.07 0.27 7.000 7.000 2.875
P 4-1/2" IF
B 4-1/2" IF
28.13 49.80 0.42 6 5/8" 6.500 2 15/16"

P 4-1/2" IF
B 4-1/2" IF
1.28 21.67 0.59 6.750 8 13/16" 2 13/16"
P 6-5/8" REG
B 6-5/8" REG
18.46 20.39 0.55 8.000 8.000 3.000

P 6-5/8" REG
B 6-5/8" REG
1.93 1.93 0.74 8.000 12.125 2 13/16"

P 6-5/8" REG
B 6-5/8" REG

9.34 9.34 0.55 8.000 8.000 3"


P 6-5/8" REG
B 6-5/8" REG
3.88 7.34 1 8.000 8.000 2 7/8"

P 6-5/8" REG
B 6-5/8" REG
1.93 3.46 0.74 8.000 12.125 2 13/16"

P 6-5/8" REG
B 6-5/8" REG
0.91 1.53 0.91 8 1/16" 8 1/16" 2 7/16"
B 6-5/8" REG
P 6-5/8" REG

0.62 0.62 0.25 8.000 12.250 3 1/4"


1

ACO

No. DESCRIPTION

15 5" Drill Pipe


(RIG)

13 21 X 5" HWDP
(RIG)

12 3 X 6.5" DRILL COLLAR


(RIG)

11 6-1/2" DRILLING JAR

10 X/O (RIG)

9 3 X 6.5" DRILL COLLAR


(RIG)

8 X/O (RIG)

7 2 X 8" DRILL COLLAR


(RIG)

6 12-1/8" UG STABILIZER

5 1 X 8" DRILL COLLAR


(RIG)

4 8" SHOCK TOOL

3 12-1/4" WATER MELON SMOOTH OD

2 BITSUB (RIG)

1 12-1/4" TCI
( RIG )