Apparel
Manufacturing
Technology
A Le é A
P. Ganesan
D. GopalakrishnanGarment Merchandising 425
Make contact with buyer
Obtain order
eo costing for that particular style
"Negotiation with buyer
(Order fabric and trims
Receiving bulk fibres and trims
Send samples to production
Supervising the order til shipment
FIGURE 19.3
Merchandising workflow,
‘The general merchandising workflow is shown in Figure 19.3 (Davis and
Nancy 2002)
19.5 Merchandising Process Flow
The merchandising process flow is shown in Figure 19.4.
19.6 General Merchandising Process
19.6.1 Order Enquiry
This is the first step where the buyers have an enquiry with the merchan-
diser about a new order.426 Apparel Manufacturing Technology
Analyze fabric
consumption
from CAD
Analyze cost
oftrims and
fabric
‘Obtain general
sewing data fom
TED
Develop sample
asperthetech
Prepare cost sheet from Develop p
‘sample
[Cost sheet and sample set to bayer for approv
Conformation of Cox sheet
reworking
(Obtain PCD and
details from
production unit
Obisin GSD
from IED
Book washing
and embroidery
eapacity freq
fabric orn
‘concerned dept.
Execution of order by entering details in ERP
Prepare samples a per buyer requirements
Forward the samples to buyer for approval
Hold preproduction
‘Comments rcsived fom
‘meeting with the buyer should be
Production unit Incorporaed and it senple
reworking
Submit
Breet, { Follow up with Offer ~) (Follow up
lik onder} Production iJ required Ll garments for on she
éspariments and] documentsto[)] "ea {| psmens
update the buyer) \locumentation | inspection || Reoeds
éepartment
FIGURE 19.4
Merchandising process owGarment Merchandising 427
19.6.2 Forwarding Tech Pack
After the order enquiry has been completed, the buyer will send a ‘specifi-
cation sheet or tech pack’ to the merchant. It covers all the details of a par-
ticular product style such as product style design, measurement details of
garment, type of fabric and construction, style code of a product, surface
ornamentation details if any ete.
19.6.3 Product Development
After the receipt of specification sheet (tech pack), the merchandisers have to
organise the information provided in the specification sheet in a single format
by categorising different product styles and their details. Consequently, the
merchandiser should provide proper instructions to the junior merchandiser
about the product style and hence he or she could assist the sample coordi-
nators to prepare the development samples from the sampling department.
19.6.4 Approval of Development Samples
When the development samples are prepared, two or three samples have to
be sent to the buyer for its approval. The main objective of a development
sample is to realise how the particular style of garment looks with the specific
details. These samples are prepared with the available fabric in the industry
similar to the exact requirement. In the development sample, surface embel-
lishments and fit analysis are followed as per the specification shect.
19.6.5 Costing
‘Once the development sample is approved by the buyer, then the costing has
to be done taking into account various costs incurred to produce a garment.
It contains various factors such as
* Fabric cost
* Trims and accessories cost
* CMT (cut-make-trim)
+ Finishing or washing cost
+ Bank charges
* Buffer value
* Miscellaneous costs such as rejection cost, wastage ete.
19.6.6 Order Placement
After the determination of a garment cost which is also approved by the
buyer, then the buyer will place the order with the necessary quantity of
order and other main details to the merchant.428 Apparel Manufacturing Technology
19.6.7 Order of Fabric and Trims
‘After the conformation of the order by the buyer, the merchandiser can
place the order for requisite fabric by considering various parameters such
as colour, GSM, weave structure ete, which is necessary for the specific gar-
ment style. The requirements are forwarded by the merchandiser to the pur-
chase department and they will place the orders.
19.6.8 Lab Dip
The lab dips for a particular garment style, containing many shades of the
fabric colour which the buyer is asked have to be sent to the buyer for the
approval before going for further production.
19.6.9 Fit Sample
The fit garment sample is made after the development sample is approved
by the buyer. The fit sample is generally produced in a medium size and
with original fabric to check the fit. All the measurements should be veri-
fied as per the specification sheet. After checking the fit sample, the buyer
returns the fit approvals sheet which comprises all the actual measure-
ments and deviation in the garment has occurred for the purpose of cor-
rection. The order is confirmed only after the approval of the fit sample by
the buyer.
19.6.10 Preproduction Samples
After the approval of fit samples, the preproduction (PP) samples (otherwise
known as red seal samples) have to be produced. The red seal sample, which
has to be produced as per the buyer's requirement, should have all the speci-
fications of the particular style with the original or exact fabric, trims, colour,
surface ornamentation etc. Two or three garment samples in each size (S, M,
L, XL) have to be sent to the buyer for approval and the buyer can advise on
any corrections if required.
19.6.11 Size Set Samples
These size set samples are prepared for the intension of inspection of
various sizes of the same style with respect to measurements, fit, styling
etc. Further, the size set samples are produced to verify whether the
assigned unit is capable of producing the specific garment style as per
the requirements and specifications in all the sizes (Fairhurst 2008). The
work flow of sampling during the merchandising process is shown in
Figure 19.5,Garment Merchandising 429
‘Buyer's samplelinformation
[_ Bes ened y mere
Sampling department
Development sample
Fiesample
Buyer
Preproduction samples
Sie sot samples
FIGURE 19.5,
Workllow of sampling.
19.6.12 Preproduction Meeting (PPM)
After all the size set samples are approved by the buyers and all raw mate-
rials are organised in the stores, then the bulk production of the garment
style can be started. A preproduction meeting should be organised by the
merchandiser prior to bulk production with the production manager and
other department heads to plan the production process to evade any delays
in target time.
19.6.13 Hand-Over the Production File to
Production Planning and Control
‘The production file comprising all the information of a particular garment
style has to be prepared by the merchandiser. It is then forwarded to CPC
along with the approved preproduction samples which are further for-
warded to PPC after examination of the file by the CPC. Some of the details
in the production file include the following items:
+ Measurements for the specific garment style
+ Export order sheet
* Colour details of the fabric and trims430 Apparel Manufacturing Technology
* Brief description of style
+ Type of packing required
+ Instructions related to print/embroidery
+ Material requirement sheet
+ Job details for CAD and fabric order
* Marker plan
+ TNA order sheet
+ 2D style diagram and trims
+ Packing information
19.6.14 Ensuring the Availability of Fabrics and Trims
After the receipt of the production file, the PPC have to study and check
every detail in the file related to the particular garment style and simultane-
ously have to check the availability of the particular fabric and trims in the
store.
19.6.15 Inspecting the Surface Ornamentation of the Particular Style
Surface embellishment may consist of embroidery, printing or appliqué and
these are made as per the requirements of the buyer; hence, the PPC depart-
ment should check the ornamentation details and plans accordingly to com-
plete the same.
19.6.16 Checking the Status of Stitching Materials In-House
Sewing accessories are materials that are used for sewing such as sewing
threads and accessories that assist production. Hence, simultaneously the
merchandiser has to make arrangements for the stitching materials in-house.
19.6.17 Checking the Patterns with Master
‘The production file includes all the information about the patterns and the
merchandiser has to forward the original patterns alongside with the pro-
duction file to the production planning and control department. Once they
receive the patterns, they will forward the patterns to the pattern master in
the department and he or she will check the pattern and confirm the same.
19.6.18 Grading and Final Cross Check of Patterns
After inspection of all the patterns of different product styles by the pattern
master, itis forwarded to the automatic grading section or manual grad-
ing section in the industry. Grading is a process of proportionately increas-
ing or decreasing the sizes from the basic one. Finally, the graded patternGarment Merchandising 431
should be inspected and confirmed by the pattern master before going for
further process.
19.6.19 Spreading and Cutting
Itis the process of arranging fabrics on the spreading table as per length and
Width of the marker in stack form which has to be carried out carefully with-
out any wrinkles or tension in the fabric. After spreading is completed, the
patterns are placed over the top layer of the spread as per the marker plan
and the plies are cut using a straight knife and band knife cutting machines.
After cutting is completed, the cut components of the garment are sorted and,
bundled.
19.6.20 Garment Wash
In some specific cases, the cut components will go for washing as per the
specification sheet or buyer requirement.
19,
"1 Fabric Printing/Embroidery
After the completion of garment washing, the bundles could be sent for
printing/embroidery if required for the specific style. Surface ornamenta-
tions should be carried out on cut garment panels as it minimises the risk of
destroying the entire garment if some defects occur during printing
19.6.2 Loading the Order in the Production Line
After the surface embellishment is completed on cut components, the bun
dles are moved on to the sewing department as per the production plan. In
the sewing section, the bundles are allotted to each worker as per his or her
‘work and the sewing process moves from one end to the other end where the
complete garment is assembled in a line.
19.6.23 Finishing
After the complete garment is assembled and inspected at the end of the
cach line, itis forwarded to the finishing section where the following opera
tions will be carried out:
* Inspection: For any defects and stains
* Trimming: Protruding threads are removed to provide a neat
appearance to the garment
* Ironing: To remove or introduce crease marks in the garment
* Packing: The finished garments are folded and packed in the poly-
thene covers432 Apparel Manufacturing Technology
19.6.24
ispatch
Dispatch is the final process in which the garments aze generally packed in
wooden cartons with the dimensions specified by the buyer and shipped to
the buyer.
19.7 Documents to be Maintained by the Merchandiser
19.7.1 Production Order (PO)
A production order comprises all the information needed by the PPC depart-
ment to generate a line loading plan and it should be available for each style
of every buyer. The production order consists of the description of style and
style number, sizes, order quantity, quantity for each size, fabric consump-
tion, specifications of interlining and trims, packing instructions, label speci
fications, ete
19.7.2 Bill of Materials (BOM)
From the PO, the requisite quantity of fabric and trims could be determined
for a single product which is then multiplied by the number of shirts being
produced. The required quantities are given as a bill of materials for various
trims such as sewing threads, buttons, zippers and cuff links. The BOM is
issued to the store to get the required amount of trims.
19.7.3 Specification Sheet/Tech Pack
This form is vital for the execution of any order. It consists of all the tech-
nical information regarding the specific garment style such as fabric, toler-
ances, interlining details etc. for the style processing (Jarnow and Dickerson
1996). It provides necessary information required for various departments.
For example, for the cutting department documents such as marker plan-
ning, marker consumption etc. and for the sewing department, details such
as construction details, measurements etc. are provided by the tech pack.
‘The specification sheet along with the PO form is issued to all the sections
in the industry while the style is moving from one department to another.
19.7.4 Order Status Report
In this order status report, all the styles and their diverse activities are
updated in an Excel work sheet and is retained by the senior merchandisers.
Therefore, he or she could easily track the current progress of a particular
style,