Professional Documents
Culture Documents
20L00010 - Bidding Documents
20L00010 - Bidding Documents
BIDDING DOCUMENTS
FOR
Duly initialed Contractor’s List of Key Personnel for the Contract (Form DPWH-INFR-14)
Duly signed Bid Prices in the Bill of Quantities (Form DPWH-INFR-17 and 18)
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-20-2016 Page 1 of 1
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
In applying in the major and similar Categories or Work given in Annex A of DO 117,
series of 2017, the following types of infrastructure are considers similar to the basic
types of each other.
Work Description
BICWOPLC – Buildings: Construction – without Piles – Low Rise –
Concrete (Frame) (1 to 5 Storeys)
b) The Following are the Similar Categories of Works that shall be considered in
the evaluation of the work experience required for the contract to be bid:
Similar Category of
Similar Category of Work Description
Work Code
1c(2) Buildings: Construction – with Piles – High
BICWPHCCP Rise – Concrete (Frame) – Cast – in – Place
Piles
Buildings: Construction – with Piles – Low
BICWPLCCP Rise – Concrete (Frame) – Cast – in – Place
Piles
Buildings: Construction – with Piles – High
BICWPHCDP
Rise – Concrete (Frame) – Driven Piles
Buildings: Construction – with Piles – Low
BICWPLCDP
Rise – Concrete (Frame) – Driven Piles
Buildings: Construction – without Piles – High
BICWOPHC
Rise – Concrete (Frame)
BIL Buildings: Industrial Plant – Low Rise
BIH Buildings: Industrial Plant – High Rise
BIM Buildings: Industrial Plant – Medium Rise
The name of the Contract is Construction of New Bataan Municipal Police Station.
1.1
The Procurement/Contract ID is 20L00010.
The Approved Budget for the Contract is P 8,859,665.00.
9.1 The venue of the Pre-Bid Conference is at DPWH Conference Room, Regional Office
XI Compound, Davao City.
1. The experience means total years of civil works experience (of any nature in
construction and engineering consultancy services)
2. Except for Materials & Quality Control Engineer, “Same Position in Similar Works”,
covers overall work experience for the designated position in similar bridge and road
construction
3. For Materials & Quality Control Engineer, “Same Position in Similar Works”, covers
overall work experience for the designated position in any engineering work.
14.2 a(4)(c) The Minimum Major equipment requirements are the following:
The pledge equipment shall be listed in complete to include the brand, plate number,
engine, chassis and serial numbers, capacity, specific location and must be ready for
inspection during the post-qualification stage.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID : 20L00010
Contract Name : Construction of New Bataan Municipal Police Station
Location of the Contract : New Bataan, Compostela Valley Province
17.1 Bids shall be valid Until One Hundred Twenty (120) calendar days from the date set for
the Bid Opening Bids.
18.1 The Bid security shall be in the form of a Bid Securing Declaration or any of the following
forms and amounts:
1. The amount of not less than [2% of ABC], if bid security is in cash,
cashier’s/manager’s check, bank draft/guarantee or irrevocable letter of credit;
2. The amount of not less than [5% of ABC], if bid security is in Surety Bond.
18.3 Bid security shall be valid One Hundred Twenty (120) days from the date set for
the Opening of Bids.
The Bidders shall Submit one (1) original copy (preferably A4 size) of the first and the
20.4 second components of its bid and shall be typed or written in indelible ink (Font Type &
Size: Arial 9 for Financial Component) and shall be signed by the bidder or its duly
authorized representative/s.
21.3.d The specific identification of this bidding process is 20L00010, Construction of New
Bataan Municipal Police Station.
22 The address for submission of bids is: BAC Chairperson, DPWH, Region XI,
R. Magsaysay Street, Davao City.
The deadline for receipt of Bids is on January 20, 2020 until 12:00 Noon.
25 Electronic Bidding will not be adopted for the Receipt of Bids in this procurement.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID : 20L00010
Contract Name : Construction of New Bataan Municipal Police Station
Location of the Contract : New Bataan, Compostela Valley Province
27.1 The place of bid opening is DPWH Conference Room, Regional Office XI
Compound, Davao City.
The opening of bid is on January 20, 2020, after all bids are received and recorded.
Electronic Bidding will not be adopted for Bids Opening and Preliminary Examination in this
29
procurement.
34 b Within a non-extendible period of five (5) calendar days from receipt by the Bidder of the
notice from the BAC that it submitted the LCB, the Bidder shall submit the following post-
qualification documentary requirements
Failure of the Bidder declared as LCB to submit the requirements under this Clause on time
or a finding against the veracity thereof, shall disqualify the Bidder for award. In the event
that a finding against the veracity of any of the documents submitted is made, it shall
cause the forfeiture of the bid security in accordance with Section 69 of the IRR
35 Electronic Bidding will not be adopted for Post-Qualification in this procurement.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID : 20L00010
Contract Name : Construction of New Bataan Municipal Police Station
Location of the Contract : New Bataan, Compostela Valley Province
1.19 The Intended Completion Date is One Hundred Eighty (180) calendar days from the
Effective Date of the Contract.
1.24 The Procuring Entity is DPWH REGIONAL OFFICE XI, R. MAGSAYSAY ST., DAVAO CITY.
1.25 The Procuring Entity’s Representative TEOFILA U. TAN, Chief, Planning and Design
Division BAC Chairperson, DPWH Regional Office XI, R. Magsaysay Street, Davao City
1.30 The Start Date shall be the date of receipt of the Notice to Proceed.
5.1 The Procuring Entity shall give possession of all parts of the Site to the Contractor upon
issuance of Notice to Proceed.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID : 20L00010
Contract Name : Construction of New Bataan Municipal Police Station
Location of the Contract : New Bataan, Compostela Valley Province
GCC Clause
Subcontracting is allowed under Department Order No. 38, series of 2015 dated March 11,
8.1
2015.
The Contractor may sub-contract portions of the works to such an extent as may be
8.3 approved by the Procuring Entity, provided that the Contractor shall directly undertake, using
its own resources, not less than fifty percent (50%) of the contract works in terms of cost.
The Contractor shall pay liquidated damages to the Procuring Entity for each day that the
Completion Date is later than the Intended Completion Date. The applicable liquidated
damages is at least one-tenth (1/10) of a percent of the cost of the unperformed portion for
every day of delay. The Procuring Entity shall deduct liquidated damages from payments due
9.1
to the Contractor. Payment of liquidated damages shall not affect the Contractor’s liabilities.
Once the cumulative amount of liquidated damages reaches ten percent (10%) of the
amount of this Contract, the Procuring Entity may rescind or terminate this Contract, without
prejudice to other courses of action and remedies available under the circumstances.
10 None
In case the Contractor fails to comply with the preceding paragraph, the Procuring Entity
shall forfeit its performance security, subject its properties to attachment or garnishment
12.3
proceedings, and perpetually disqualify it from participating in any public bidding. All
payables of the GOP in his favor shall be offset to recover the costs
Warranty Security
GCC Clause
The amount of the advance payment is not to exceed fifteen percent (15%) of the
39.1
total Contract Price, to be made in lump sum or, at most, two installments.
Materials and equipment delivered on the site but not completely put in place shall
40.2
not be included for payments
The date by which the As-Built Drawings and/or Operating and Maintenance
50.1
Manuals are required when 95% of Contract cost completed
The amount to be withheld for failing to supply the As-Built Drawings and/or
50.2 Operating and Maintenance Manuals by the date required is (equal 10% of
Contract Price)
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID : 20L00010
a. DPWH Standards
The Procuring Entity Shall use the Standard Pay Items in the Project and
Contract Management Application (PCMA) in drawing up the Specifications.
a. Bid Form
b. Omnibus Sworn Statement (DPWH-INFR-16-2016)
c. Sample Form : Certification from the Insurance Commission
d. Bid Securing Declaration Form as prescribed by the GPPB
e. DPWH-INFR-10-2016
f. DPWH-INFR-11-2016
g. DPWH-INFR-13-2016
h. DPWH-INFR-14-2016
i. DPWH-INFR-15-2016
j. DPWH-INFR-19-2016
k. DPWH-INFR-43-2016
l. DPWH-INFR-44-2016
m. DPWH-INFR-45-2016
n. DPWH-INFR-46-2016
o. DPWH-INFR-47-2016
p. DPWH-INFR-48-2016
q. DPWH-INFR-49-2016
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID : 20L00010
Contract Name : Construction of New Bataan Municipal Police Station
Location of the Contract : New Bataan, Compostela Valley Province
BID FORM
Date: _______________
(a) We have examined and have no reservation on the Bidding Documents (BDs),
including Supplemental/Bid Bulletins, for the abovestated Contract;
(b) we offer to execute the Works for this Contract in accordance with the said BDs,
including the Bid Data Sheet, General and Special Conditions of Contract, Specifications
and Drawings therein;
(c) we present our Bid to execute the Works, consisting of our Technical Proposal
(Annex “A”) and our Financial Proposal (Annex “B”);
(d) our Technical Proposal includes the following required documents:
1. Bid Security in the required form, amount and validity period, using Form DPWH-
INFR- 09, 10, or 11, as applicable (Annex “A-1”)
2. Organizational Chart for the Contract, using Form DPWH-INFR-13 (Annex “A-3”)
3. Contractor’s Certification on Key Personnel for the Contract, with the Key
Personnel’s Affidavits of Commitment to Work on the Contract, using Form DPWH-
INFR-14 (Annex “A-4”)
4. List of Contractor’s Major Equipment Pledged for the Contract, using Form DPWH-
INFR-15 (Annex “A-5)
5. Omnibus Sworn Statement required under RA 9184-IRR Sec. 25.2b)iv), using Form
DPWH-INFR-16 (Annex “A-6”);
(f) the total price of our Bid for this Contract based on the unit prices in the said Bill of
Quantities, excluding any discounts offered in item (g) below, is: total Bid price in
words and in figures;
--------------------------------------------------------------------------------------------------------------
DPWH-INFR-09-2016 Page 1 of 2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID : 20L00010
Contract Name : Construction of New Bataan Municipal Police Station
Location of the Contract : New Bataan, Compostela Valley Province
(g) the discounts we offer and the methodology for their application for this Contract
are: ________________________;
(h) our Bid shall be valid for a period of _______________________ days from the date
fixed for the opening of bids in accordance with the Bidding Documents, and it shall
remain binding upon us and may be accepted by you at any time before the
expiration of that period;
(i) if our Bid is accepted and we receive from you a Notice of Award, we commit, within
ten (10) calendar days from our receipt of the said Notice, (1) to submit to you the
required Performance Security and other documents prescribed in the Bidding
Documents, and (2) to sign the Contract Agreement;
(j) we understand that,if the contract is awarded to us, this Bid, together with your
written acceptance thereof through your Notice of Award, shall constitute a binding
contract between us, until a formal Contract Agreement is prepared and executed;
(k) we understand that you are not bound to accept the Lowest Calculated Bid or any
other Bid that you may receive;
(l) we acknowledge that failure to sign each page of this Form of Bid and the
accomplished Bill of Quantities shall be a ground for the rejection of our Bid; and
Name:
Signed:
Date: ___________
---------------------------------------------------------------------------------------------------------------
DPWH-INFR-09-2016 Page 2 of 2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name : Construction of New Bataan Municipal Police Station
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. Part II :
Pay Item Unit Price Amount
Description Unit Quantity (Pesos) (Pesos)
No.
(1) (2) (3) (4) (5) (6)
Construction of Field
A.1.1(3) Office for the Engineer ls 1.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Project
B.5 each 1.00
Billboard/Signboard
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Occupational Safety
B.7(2) ls 1.00
and Health Program
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Mobilization/
B.9 Demobilization ls 1.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Submitted by:
Date:
Name of the Representative of the Bidder
Position
DPWH-INFR-17-2016 Page 1 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name : Construction of New Bataan Municipal Police Station
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. A :
Pay Item Unit Price Amount
No. Description Unit Quantity (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
PART A. EARTHWORK
In words: _______________________ In words: ________________________
Clearing and
800(1) m² 300.00
Grubbing
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Removal of
801(1) Structures and ls 1.00
Obstruction In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Structure Excavation
803(1)a m³ 296.90
(Common Soil)
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Embankment (From
804(1)a roadway/structure m³ 257.00
excavation)
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Embankment (From
804(1)b Borrow) m³ 96.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Submitted by:
Date:
Name of the Representative of the Bidder
Position
DPWH-INFR-17-2016 Page 2 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. A&B :
Structural Concrete
900(1)c2 (Footings and Slab m³ 56.00
on Fill)
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Structural Concrete
900(1)c4 (Columns) m³ 30.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Structural Concrete
900(1)c5 (Suspended Slab) m³ 32.87
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Structural Concrete
900(1)c6 (Beams and Girders) m³ 21.65
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Reinforcing Steel
902(1)a (Deformed), Grade kg 22,864.99
40
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
Sub-Total for this page
Submitted by:
Date:
Name of the Representative of the Bidder
Position
DPWH-INFR-17-2016 Page 3 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. B :
Reinforcing Steel
902(1)b (Deformed), kg 7,042.90
Grade 60
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Formworks and
903(1) Falseworks ls 1.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
Storm Drainage
1001(9) and Downspout ls 1.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
Sub-Total for this page
Submitted by:
Date:
Name of the Representative of the Bidder
Position
DPWH-INFR-17-2016 Page 4 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. D :
Septic Vault
1001(11) (Concrete/CHB) ls 1.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
3. PLUMBING
In words: _______________________ In words: ________________________
Ceiling – 4.5mm
1003(1)a1 Metal Frame Fiber m² 288.00
Cement Board
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Position
DPWH-INFR-17-2016 Page 5 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. D :
Aluminum Framed
1007(1)b Glass Door (Swing m² 8.75
Type)
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
Sub-Total for this page
Submitted by:
Date:
Name of the Representative of the Bidder
Position
DPWH-INFR-17-2016 Page 6 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. D :
Aluminum Glass
1008(1)d Windows (Fixed m² 1.92
Type)
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Frames (Jambs,
Sills, Head,
1010(1) Transoms and set 10.00
Mullions) In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Doors – Wood
1010(2)b Panel m² 13.02
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Folding Partition-
1044(1)a Wooden m² 15.66
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Folding Partition-
1044(1)b Steel/Aluminum m² 10.40
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
Sub-Total for this page
Submitted by:
Date:
Name of the Representative of the Bidder
Position
DPWH-INFR-17-2016 Page 7 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. D :
Waterproofing
1016(1)a (Cement-base) m² 105.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Synthetic Granite
1018(4) Tiles m² 180.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Cement Plaster
1027(1) Finish m² 1,152.17
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Painting Works
1032(1)a (Masonry/ m² 1,440.17
Concrete)
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
Sub-Total for this page
Submitted by:
Date:
Name of the Representative of the Bidder
Position
DPWH-INFR-17-2016 Page 8 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. D :
Painting Works
1032(1)b (Wood) m² 130.26
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Painting Works
1032(1)c (Steel) m² 46.97
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Reflective
1038(1) Insulation m² 168.05
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
7. MASONRY WORKS
In words: _______________________ In words: ________________________
CHB Non Load
Bearing (including
1046(2)a1 Reinforcing Steel) m² 258.60
100 mm In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
CHB Non Load
Bearing (including
1046(2)a2 Reinforcing Steel) m² 317.49
150 mm In figures: _______________________ In figures: ________________________
________________________________ _________________________________
8. METAL STRUCTURES
In words: _______________________ In words: ________________________
Fabricated Metal
Roofing Accessory
1013(2)b3 Ga 24 Valley lm 76.40
Rolls/Gutter In figures: _______________________ In figures: ________________________
________________________________ _________________________________
Sub-Total for this page
Submitted by:
Date:
Name of the Representative of the Bidder
Position
DPWH-INFR-17-2016 Page 9 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. D :
Structural Steel
1047(8) (Roof Framing) ls 1.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
PART D. ELECTRICAL
In words: _______________________ In words: ________________________
Conduits, Boxes &
Fittings (Conduit
1100(10) Works/Conduits ls 1.00
Roughing-Ins) In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Panelboard with
1102(1) Main & Branch ls 1.00
Breakers
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
Sub-Total for this page
Submitted by:
Date:
Name of the Representative of the Bidder
Position
DPWH-INFR-17-2016 Page 10 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
BILL OF QUANTITIES
Part No. D :
Lighting Fixtures
1103(1) and Lamps ls 1.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
PART E. MECHANICAL
In words: _______________________ In words: ________________________
Airconditioning –
1200(13)a Package/ Split ls 1.00
Type
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
In words: _______________________ In words: ________________________
Water Pumping
1201(1) System ls 1.00
In figures: _______________________ In figures: ________________________
________________________________ _________________________________
Sub-Total for this page
GRAND TOTAL
Submitted by:
Date:
Name of the Representative of the Bidder
Position
DPWH-INFR-17-2016 Page 11 of 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
1. Part No. – Enter the “Part No.” for each section of the Bill of Quantities (BOQ) where unit prices are
entered.
2. Part Description – Enter the “Part Description” corresponding to the “Part No.”
3. Total Amount – Enter the “Total Amount” in Pesos for all pages having the same “Part Description”
Contract ID:
Part No. Part Description Total Amount
Part II Other General Requirements P
A Earthworks P
B Plain and Reinforced Concrete Works P
C Finishings and Other Civil Works P
1. Termite Control Work P
2. Storm Drainage and Sewerage System P
3. Plumbing P
4. Carpentry and Joinery Works P
5. Hardware, Doors, Windows and Frames P
6. Finishing and Painting P
7. Masonry Works P
8. Metal Structures P
D Electrical P
E Mechanical P
Signed Date
DPWH-INFR-18-2016 Page 1 of 1
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
:
Location of the Contract : New Bataan, Compostela Valley Province
Description
Safety Helmet
Gloves
Safety Shoes
Miscellaneous Medical Items
First Aider
Part Time Safety Practitioner
1003(3) Cabinets
Contract ID : 20L00010
Contract Name Construction of New Bataan Municipal Police Station
: