Professional Documents
Culture Documents
00-System-Terminology - Rev G
00-System-Terminology - Rev G
GRID
GSE
SAM
1.1) Summary
GSE
L1-00-System Terminology - Rev G - P 2
Summary
1) Generalities Page 4
GSE
L1-00-System Terminology - Rev G - P 3
1.1) Electric Terminology
SITE
SUBSTATION
VOLTAGE
LEVEL
BAY
MODULE
GSE
L1-00-System Terminology - Rev G - P 4
1.2) SCE Pre-view
SITE
SUBSTATION SUBSTATION
CB 1 SW 1 TR 1 SW 2
Position Position TPI
Control Control Control
GSE
L1-00-System Terminology - Rev G - P 5
1.3) Levels of Substation Control philosophy
SUBSTATION Level
Bay Level
Process Level
Primary Equipment
GSE
L1-00-System Terminology - Rev G - P 6
1.4) Electric definitions
Substation
Site Partition => Local/Remote substation
Substation Control Uniqueness
(nb=1) The Business DB (except Cascade)
Voltage Level
Association of Bus Bars for Auto Volt. Regul.
Often only one BB (nb 4-5-x)
Bay
ANSI => 1 CB with associate circuits & protections
Association of switchgears/transformers & functions
Local/Remote Bay, SBMC, Bay Control Uniqueness
Special (coupler, section, feeder, transformer)
Often Generic (more easy)
Bay belongs to only one C264
Module
Primary Electric Device, ANSI functions, Group of DP
Special (CB, disconnector, transformer, AR, Sync)
Often Generic (DPS/DPC association possible)
Data Point
Real Time information (95% electric)
At any level GSE
L1-00-System Terminology - Rev G - P 7
Summary
1) Generalities Page 4
1) Generalities
GSE
L1-00-System Terminology - Rev G - P 8
2) Datapoint Terminology
REAL TIME DATA = DATAPOINTS
IEC61850
Several KIND of DP
BINARY SPS_ST , SPC_ST
SPS Single Point Status
DPS_ST, DPC_ST
DPS Double Point Status INPUTS
INS_ST
MPS Multiple Point Status
SCT, DCT
Common Invalid Unknown (IED), Self-Check Fault (Hard)
+DPS invalid Jammed (00) Undefined (11)
+MV, xCT invalid Open Circuit, Undefined, OverRange
FSS Force (auto/Manu) an Invalid DP
Suppress (Make DP invalid)
Substitute (Force the Status/Value of DP)
Threshold For Alarm,
L,LL,LLL, H, HH, HHH with hysteresis
GSE
L1-00-System Terminology - Rev G - P 10
2.2) Control Datapoint
SPC, DPC, SP
Kind
Direct Execute Select Before Operate
One Shot Selection / Wait(cancel) / Execute
Medium/Low Volt. HV + Control Uniqueness => order run Bay
1) SBUS/C264 DE SBO
Select Open/Close
Execute Open/Close
3) Hardware/IED DE SBO
GSE
L1-00-System Terminology - Rev G - P 11
2.3) Controls
Station
Operator Right / Gateway channel in control
Remote/Local Station
Device operating mode (operational, not stand-by…)
Control Uniqueness Station (GOOSE)
Topological ILK
Bay
Control Uniqueness Bay (order running)
Remote/Local Bay
GRID
GSE
SAM