-------------evaluates the Owner’s program, --------------assists the Owner from the early
schedule, budget, project site and proposes stage of establishing a list of prospective
methods of project deliveries, prepares the initial Contractors to awarding of the construction
line drawings representing design studies contract.
leading to a recommended solution, including a
general description of the project for approval by --------------makes decisions on all claims of the
the Owner, submits to the Owner a Statement of Owner and Contractors on all matters relating to
the Probable Project Construction Cost the execution and progress of work or the
(SPPCC) based on current cost parameters interpretation of the Contract Documents
-----------The Architect’s Fee based on the PPC -------------If the Architect renders additional
shall be detailed in the Architect’s Guidelines professional services due to changes ordered by
the Owner after approval of the Architect’s
-----------This method of compensation is based outputs, the Owner shall pay the Architect for
on technical hours spent and does not account extra time, resources/ drafting, or other office
for creative work since the value of creative expenses.
design cannot be measured by the length of
time the designer has spent on his work. ------------If the work of the Architect is
abandoned or suspended in whole or in part, the
-------------This method of compensation is Owner shall pay the Architect for the services
frequently used where there is continuing rendered corresponding to the amount due at
relationship involving a series of Projects. the stage of suspension or abandonment of the
work.
------------It establishes a fixed sum over and
above the reimbursement for the --------------If portions of the building/s are
Architect’s technical time and overhead. An erected at different periods of time, thus
agreement on the general scope of the work is increasing the construction period and
necessary in order to set an equitable fee. Architect’s burden of services, charges
pertaining to services rendered during the
-----------This method may be applied to Construction Phase shall be adjusted
government projects since they entail more proportionately. When the suspension of
paper work and time-consuming efforts. construction exceeds a period of six (6) months,
the fee for the remaining works shall be
OTHER CONDITIONS ON SERVICES doubled.
1-18
---------------When the Owner therefore fails to
implement the plans and documents for
construction as prepared by the Architect, the
----------Other services that may be needed in Architect is entitled to receive as compensation
order to complete the project such as services of the sum corresponding to ninety percent (90%)
acoustic and illumination engineers / specialists, of the Architect’s fee.
mural painters, sculptors, and other service
providers are to be recommended by the -------------If the Owner requires the services of
Architect for the Owner’s approval specialist consultants, they shall be engaged
with the consent of the Architect. The cost of
---------- The Architect’s Fee is based on the their services shall be paid for separately by the
Project Construction Cost. Where the Architect Owner and shall not be deducted from the
has to render additional services, additional Architect’s fee.
compensation shall be required.
--------------Any SPPCC or any Cost Estimate
-----------Should a scale model, 3D models submitted by the Architect can attain only a
and/or walk-thru presentation of the architect’s certain degree of
design be
accuracy. As the Architect has no control over that shall be placed at the project site during the
the cost of labor and materials, or the many progress of construction shall be approved by
factors that go into competitive bidding, he does the Architect as to size, design and contents.
not assume any professional responsibility for After the completion of the project, the Owner or
such cost estimates, unless glaring errors or his building lessee shall consult the Architect for
discrepancies are clearly evident. the design, size of all signboards, letterings,
directories and display boards that will be placed
----------Should the Owner require the Architect on the exterior or public areas attached to the
to design movable or fixed pieces of cabinets building project in order to safeguard the
and other architectural interior (AI) elements, Owner’s interest. Nothing should be installed
site development plan (SDP) components, inside or outside of the building that would
urban design elements, and other items of compromise its safety and aesthetics.
similar nature, the Owner shall pay the Architect
in addition to the Architect’s fee. --------------means the cost of the completed
building to the Owner, including the structure,
-----------Upon recommendation of the Architect plumbing/sanitary and electrical fixtures,
and with the approval of the Owner, full-time mechanical equipment, elevators, escalators,
construction supervisors as will be deemed air-conditioning system, fire protection system,
necessary shall be engaged and paid by the alarm and clock system, communications and
Owner. If no Project / Construction Manager is electronic system, elements attached to the
present, the full-time construction supervisor building and all items indicated in the plans,
shall be under the technical control and designs, drawings and specifications prepared
supervision of the Architect and shall make by the Architect and his consultants.
periodic reports to the Owner and to the
Architect regarding the progress and quality of ---------------The PCC does not include any of the
the work done. fees for the Architect, the Engineer, the
Specialist Consultants or the salaries of the
----------------The Architect’s Fee is a net amount. construction inspectors.
Any tax (exclusive of income tax) that the
national and/or local government/s may impose ----------------include cost of the construction as
on the Architect as a consequence of the well as all professional fees,
services performed for the project shall be paid permits, clearances and utilities and cost of
by the Owner. acquiring the project site / lot, cost of money,
etc.
--------------During the progress of work, the
Owner shall furnish the Architect a copy of the SPP Document 203
records of expenses being incurred on the
construction. Upon completion of the project, the ------------involves the detailed planning and
Owner shall furnish the Architect a copy of the design of the indoor / enclosed areas of any
summary of all cost of labor, services, materials, proposed building / structure, including retrofit,
equipment, fixtures and all items used at and for renovation, rehabilitation or expansion work
the completion of the construction. which shall cover all architectural and utility
aspects, including the architectural lay-outing of
--------------All designs, drawings, models, all building engineering systems found therein.
specifications and other contract documents and
copies thereof, prepared, duly signed, stamped -------------prescribes space plans, stacking
and sealed and furnished as instruments of diagrams / sections and computations of areas
service, are the intellectual property and for the different activities and spaces to be
documents of the Architect, whether the work for integrated in a building Project.
which they were made is executed or not, and
are not to be reproduced or used on other work ------------lays out and prescribes furniture / built-
except with a written agreement with the ins / equipment for the project and prepares
Architect specifications of AI components including all
floor / wall / ceiling finishes, doors and
-----------All signboards of the General partition systems, hardware, modular or ready-
Contractor, sub-contractors, jobbers and dealers assembled furniture pieces/ systems,
equipment, furnishings, built-ins, fixtures, ----------prepares the drawings and specifications
signages and graphic devices, etc. for lighting design, illumination, fixture
placement, efficiency, energy considerations,
------------assists the Client in conducting bids or etc.
negotiations with General Contractors,
subcontractors and suppliers of building ----------- assists the Owner/ Client in bidding out
materials, furniture, equipment, fixtures, etc. the work or in negotiating with a specialty
subcontractor
------------checks and approves samples of
materials and shop drawings of AI components, ------------checks and approve samples of
reviews and approves billings of AI components, materials and fixtures, assists Owner/ Client to
conducts final inspection and approves installed evaluate the amount due the sub-contractor
AI components and related items
------------means the total cost of all fixtures and
------------involves the detailed planning and accessories, which were either
design to control sound designed, specified or procured by the Specialist
transmission for compatibility with the Architect and/or his Specialist Consultants
architectural design concept. (SCs) for the Owner/ Client, and that were used
or installed in the project.
----------The Architect is the prime professional
commissioned by the Owner/Client to plan and --------------The space planning, architectural lay-
design the building/structure and all its utilities outing and utilization of spaces within and
and to coordinate the works of all allied design surrounding a specific building / structure in
professionals involved in the project including all relation with the existing natural and/or built
inter-disciplinary and specialized works. He environments have to be a well-coordinated
shall make certain that these inputs comply with effort so that both the building / structure and the
the requirements of the project and are host environment shall act as one.
compatible with the architectural design concept.
--------------the Architect is not merely
------------the Architect works on a development concerned with the building / structure he
concept. To realize this, the Architect develops creates but with the grounds and surrounding
the design by determining the size and space as well. He studies the existing
interrelationship of interior spaces, laying out the environment in relation to the building / structure
furniture, movables, equipment, built-ins and and consequently lays out the areas / grounds
fixtures to support the required activities, thus immediately surrounding the building / structure.
making both the exterior and interior spaces
contribute to the total concept. --------------conceptualizes the entire site
development plan (SDP) including the generic
----------prepares the drawings and specifications scope of civil works and the general scope of
for acoustic design and treatment, sound softscape and hardscape requirements.
control and reinforcement, sound absorption,
reflectance, insulation, etc. -------------conceptualizes the specifications for
the needed civil works and utility lines, assists
----------assists the Owner/ Client in bidding out the Owner/Client in bidding out the work or
the work or in negotiating with a specialty negotiating with landscape,
subcontractor, checks and approves samples of waterscape, rock formation contractors, etc., but
materials and equipment mainly when no SC is available.
----------assists Owner/ Client in evaluating the ------------refers to the orderly arrangement within
amount due the sub-contractor a piece of land or property on which
vertical structures such as buildings, monuments
----------involves the detailed planning and and the like, as well as horizontal
design of light transmission, timing and control developments such as rights-of-way (ROWs),
for compatibility with the architectural design open spaces and activity spaces are to be
concept. proposed.
----------The Architect undertakes the site ascertaining the value of structures or facilities
planning of a project that requires a composite which must be fully secured, kept safe,
arrangement of several buildings/ structures and protected, assured, guaranteed and provided
their requisite amenities, facilities, services and sufficient safeguards for the conduct of any work
utilities within a natural or built setting. or activity.
-----------are based on the concept of expanded ------------The Architect in this area of practice
physical planning services to include other engages in methods of producing building
activities necessary for the proper handling of components in a highly engineered, efficient and
the numerous components considered in the cost-effective manner, particularly for residential
formulation, implementation and realization of a and commercial applications
Master Development Plan (MDP).
-------------The Consulting Architect in this area of
------------covers the range of all services from practice provides the Owner/Client with means
primary data gathering through the formulation and measures to ensure the proper function and
of the MDP and the parallel preparation of the maintenance of the building / structure and site
environmental impact assessment / statement after final inspection.
(EIA/S).
--------------The Architect in this area of practice
-------------land use and the changes which occur recommends the systematic process of ensuring
within the physical environment (within the that a building / structure’s array of systems is
space where such activities take place), planned, designed, installed and tested to
represented mainly by the MDP. perform according to the design intent and the
building’s operational needs. If the building
------------the nation’s assets and its materials, equipment and systems are not
management. installed properly or are not operating as
intended, the effectiveness, efficiency,
------------the people, their living conditions and productivity and other benefits of high
the seeking of ways to ameliorate it. performance plans/designs will not be achieved.