RA-70 Risk Assessment For Internal Road Works-R1
RA-70 Risk Assessment For Internal Road Works-R1
Task/Activity Description: Risk Assessment for Internal Road Works Reference Number: EPC10-RA-70-R1
Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 06.01.2015
Page 1 of 6
Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsible
No (Pre Controls) (Post Controls) Personal
Risk Rating
Risk Rating
Probability
Probability
Categories
Categories
Severity
Severity
No
work permit shall be obtained from company / local authorities prior to
commencement of work
Work shall be carried out as per approved method statement.
Task/Activity Description: Risk Assessment for Internal Road Works Reference Number: EPC10-RA-70-R1
Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 06.01.2015
Page 2 of 6
Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsible
No (Pre Controls) (Post Controls) Personal
Risk Rating
Risk Rating
Probability
Probability
Categories
Categories
Severity
Severity
signage posted to restrict nearby workers.
Road diversion must be arranged as per drawing prior to commencement of
work.
Trained banksman shall be deployed full time during the construction
equipment operation.
Road diversions approval must be obtained from company/local authorities
services , All construction equipment shall have working reverse alarm and beacon light.
Uncontrolled
Physical Access to be controlled by hard barrication and appropriate signage.
workers Engineer
injuries
movement. The swing area of the equipment shall be cordon off and stand by person shall
monitor worker movement around the equipment.
Access for emergency vehicle shall be provided.
Alternate pedestrian access to be provided to prevent man and machine
interface.
Operatives shall maintain safe distance from the operating construction
equipment
Close supervision must be provided for the activity.
Equipment operators shall operate vehicles/equipments at speed not
exceeding 20 km/hr.
Equipment operator shall take additional care while operating near existing
Equipment Hit structures and scaffoldings Construction
Property
by /hit to existing 4 C P H Trained banksman shall be deployed full time to guide the operators 2 A P Low Manager, Site
4 damage
structure Engineer
Minimum clearance from structure and facilities shall be maintained.
The swing area of the equipment shall be cordon off and stand by person shall
monitor worker movement around the equipment.
All vehicles to be equipped with reverse alarm and revolving warning light
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS
Task/Activity Description: Risk Assessment for Internal Road Works Reference Number: EPC10-RA-70-R1
Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 06.01.2015
Page 3 of 6
Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsible
No (Pre Controls) (Post Controls) Personal
Risk Rating
Risk Rating
Probability
Probability
Categories
Categories
Severity
Severity
Provide adequate sloping, shoring /benching to prevent collapse of
Risks of Construction
entrapment / excavation.
Cave-in of 4 C P H 2 A P Low Manager,
5 buried under Lateral movement due to traffic movement shall be considered when sloping
excavation Site Engineer
soil and benching excavation.
Construction equipment shall be kept at safe distance from excavation edge
8 Man and machine 3 C p M Man and machine interface shall be eliminated, minimised as reasonably as 1 B P Low Construction
interface Physical practicable. Manager, Site
Engineer
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS
Task/Activity Description: Risk Assessment for Internal Road Works Reference Number: EPC10-RA-70-R1
Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 06.01.2015
Page 4 of 6
Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsible
No (Pre Controls) (Post Controls) Personal
Risk Rating
Risk Rating
Probability
Probability
Categories
Categories
Severity
Severity
Roller compactor shall not be used on the edges of excavations.
injury Operator shall ensure on/off lever on the handle in proper working condition.
Area shall be cordoned off.
Work area shall be kept cleared of unwanted material. Construction
Improper material Physical 3 C p M 2 A P Low Manager, Site
9 Slip, trip risks to be minimised by proper housekeeping.
management injury Engineer
Work area shall be cleaned and unwanted materials to be removed.
Implement heat stress management program at site.
Heat Ensure that water supply is maintained at all time. Construction
Inadequate Heat
exhaustion 4 C P H Monitor to ensure that workers are carrying water igloo with them at all 2 A P Low Manager, Site
10 Stress
heat stroke, time. Engineer
management
fatality Follow the flag system, implement work/ rest rotation.
Rest shelter shall be provided and maintained as per the requirement.
Waste shall not be allowed to contaminate the ground. Construction
Improper waste Environment 3 C E M 1 B E Low Manager, Site
11 All waste generated during construction shall be disposed off as per
management pollution Engineer
project requirement.
No work shall be carried out due to poor illumination, rain or sand storm
Adverse weather Proper illumination shall be provided for working at night. Construction
Physical 4 C P H 1 B P Low Manager, Site
12 conditions, Reflective visibility vest shall be worn by all employee engaged in road works.
injury Engineer
illumination Flashing rod shall be used during poor visibility and night works.
Area to be lit adequately. Flash light to be provided at prominent location.
Work Instructions:
1. All hazard control measures prescribed in this Risk Assessment is issued as a work instruction to be implemented by site supervision.
2. All persons and vehicles must comply with Site HSE Rules and PPE Requirements.
3. Under no circumstance shall any person will work under suspended load / bucket while manually handling/ loading / offloading from equipment.
4. Hand brake to be applied when workers are working near equipment for lifting/ transferring load to and from the equipment
5. Do a tool box talk with all site supervision, operators and operatives. Explain these control measures to all relevant operatives.
6. Housekeeping to be done and workplace to be made safe prior to leaving the workplace.
7. All persons shall sign their understanding and confirmation in the Tool Box Talk attendance sheet.
8. All construction waste will be removed daily from the work area.
9. All Near Misses and Accidents will be reported immediately to the on-duty Medic and site safety officers
10. Copy of this RA will be discussed in pre- start TBT. Copy will be available on site.
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS
Task/Activity Description: Risk Assessment for Internal Road Works Reference Number: EPC10-RA-70-R1
Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 06.01.2015
Page 5 of 6
Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsible
No (Pre Controls) (Post Controls) Personal
Risk Rating
Risk Rating
Probability
Probability
Categories
Categories
Severity
Severity
In Case of emergency, contact ASCON 24 Hour Emergency Numbers - 0566848083 or 0566848220
Prepared by Name Date and Signature Approved by Name Date and Signature
Project Engineer HSE Manager Raju D.V.R
Sr EHS Officer Dieudonne Chrameh Issued by Name Date and Signature
Construction Joseph. P
Manager
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS
Task/Activity Description: Risk Assessment for Internal Road Works Reference Number: EPC10-RA-70-R1
Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 06.01.2015
Page 6 of 6
Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsible
No (Pre Controls) (Post Controls) Personal
Risk Rating
Risk Rating
Probability
Probability
Categories
Categories
Severity
Severity