AKESP

Project: AKS MASTUJ

Grand Summary of Cost


Date: 12-09-2022
PHASE-1
Total Cost
S. No. Description Unit Remarks
Rs.

Civil & Architectural Works


3 Electrical Work Rs. 24,797,500

4 Plumbing Work Rs. 13,981,232

Total Cost Rs. 38,778,732

Total Cost Phase-1 & Phase-2 Rs. #REF!

Page 1 of 32
BILL OF QUANTITIES AKS MASTUJ
ELECTRICAL & ALLIED WORKS PHASE-I

SUMMARY

SUPPLY INSTALLATION TOTAL


S.NO. SECTIONS
AMOUNT (Rs.) AMOUNT (Rs.) AMOUNT (Rs.)

SECTION - A
1 2,237,530 332,325 2,569,855
WIRING / WIRING ACCESSORIES

SECTION - B
2 1,222,000 165,500 1,387,500
CABLE CONTAINMENT

SECTION - C
3 311,610 61,675 373,285
SWITCHES & SOCKETS

SECTION - D
4 1,444,410 244,025 1,688,435
MAIN / SUB MAIN CABLES

SECTION - E (OFM ITEM)


5 790,000 65,000 855,000
DISTRIBUTION BOARDS

SECTION - F
6 1,055,900 156,900 1,212,800
LIGHTING FIXTURES (OFM ITEM)

SECTION - G
7 1,700,000 50,000 1,750,000
UPS (UNINTERRUPTIBLE POWER SUPPLY) (OFM ITEM)

SECTION - H
8 779,600 127,300 906,900
VOICE & DATA COMMUNICATION SYSTEM

SECTION - I
9 752,000 25,200 777,200
CCTV SYSTEM (IP BASED) (OFM ITEM)

SECTION - J
10 630,225 211,100 841,325
FIRE ALARM SYSTEM (OFM ITEM)

SECTION - K
11 487,500 21,700 509,200
PUBLIC ADDRESS SYSTEM (OFM ITEM)

SECTION - L
12 915,000 106,000 1,021,000
EARTHING AND GROUNDING (OFM ITEM)

SECTION - M
13 10,550,000 305,000 10,855,000
DIESEL DRIVEN GENERATOR (OFM ITEM)

SECTION - N
14 50,000 50,000
AS-BUILT DRAWINGS

Total Amount (Rs.) 24,797,500

ElekEn Associates 2 of 32 August 15th,2022


S.N
DESCRIPTION QTY
O.
SECTION - A
WIRING / WIRING ACCESSORIES
Supply, installation, testing and commissioning of following items
including all material, conduits, tools, labor & accessories required for
completion of work as per description & drawings. Complete in all
respects. As shown on drawings.
Note:
1) The cost of wiring items shall includes Imported Polycarbonate
Connectors and High Quality flexible conduit on each light point.
2) The circuit wire drop in flexible conduit
3)Insulation,resistance (Megger) Test of each circuit to be done by
contractor.
4) Wiring for Occupancy Sensor shall be included in light wiring.
5)The surface conduiting shall be done in decorative / aesthetic
manner wherever applicable.
6)Wherever the circuits are running in cable tray, it will enter / leave
tray using proper glands / Junction boxes (IP44). The cost of all such
accessories to be included in wiring cost.
7) All electrical circuits and power outlets shall be numbered (i.e. circuit
number and distribution board number) and the circuit schedule of the
distribution board must accurately reflect the installation. The load
across all phases must be balanced
8). Color Code Phase:
- 3 Phases (red, yellow, blue)
- Neutral (black)
- Earth (green/green-yellow)
- Control wiring (Orange or red)

Circuit wiring from DB to switch board including any wiring from switch
1 board to switch board with 3x1C-2.5 Sq.mm Cu/PVC wires in 25mm dia 13
PVC Conduit as shown in drawings.
Wiring for light point from switch board to first light point with 3x1C-
a 2.5 Sq.mm Cu/PVC in 25mm dia PVC Conduit as shown in drawings. 45

b Same as above item but wiring from light point to point. 194
Wiring for Intelligent Group Control Lighting fixtures from Lighting
2 Control Relay to first light point with 3x1C-2.5 Sq.mm Cu/PVC in 2
25mm dia PVC Conduit as shown in drawings.
a Same as above item but from light point to point. 20
Emergency Circuit wiring from DB to switch board including any
wiring from switch board to switch board with 3x1C-2.5 Sq.mm
3 2
Cu/PVC, wires in 25mm dia PVC Conduit as shown in drawings.

Wiring for light point from switch board to first light point with 3x1C-
a 2.5 Sq.mm Cu/PVC in 25mm dia PVC Conduit as shown in drawings. 5

b Same as above item but wiring from light point to point. 15


Wiring for 13A/15A Switch Socket units (RAW Power) from DB to
4 first outlet with following size of wires in 25mm dia PVC Conduit as
shown in drawings.
a 3C-4 Sq.mm, Cu/PVC/PVC 6
b Same as above item, but wiring from outlet to outlet. 21
5 Wiring of 20A DP switch from for Heaters with following size of wires in
25mm dia PVC conduit as shown on drawings.
a 2C-4 Sq.mm, Cu/PVC/PVC + ECC 1C-4 Sq.mm, Cu/PVC 47
Wiring of 20A, 3-Pin Industrial Socket unit from DB to Comm. Rack with
following
6 size of wires in 32mm dia size of exposed / concealed conduit
PVC/Cable tray t as shown on drawings.

a 3C-6 Sq.mm Cu/PVC/PVC 5


Wiring of 32A, 5-Pin Industrial Socket unit from DB to socket and vice
7 versa with following size of wires in 32mm dia size of exposed /
concealed PVC conduit as shown on drawings.
a 4C-10 Sq.mm Cu/PVC/PVC + ECC 1C-10 Sq.mm Cu/PVC 2
Note:
1) Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.
2) The ECC to be run with each circuit shall be loop-in and loop-out
type, joints are not allowed.
3) All the cables shall be colour coded according to phases / types of
services.

Total Amount (Rs.) Sec - A


(CARRIED FORWARD TO SUMMARY)
SECTION - B
CABLE CONTAINMENT
Supply & Installation of following sizes of PVC/UPVC Conduits
including all accessories such as bends, sockets, j-boxes, flexible
1 conduits, metal saddles e.t.c for Main / Sub Main Power, Telephone &
Data Cables, concealed / surface on wall as per design drawings.
Provide MS Pull boxes where ever required.
a 25 mm dia PVC Conduit (For Voice and Data) 100
b 32 mm dia PVC Conduit 50
c 50 mm dia PVC Conduit 100
d 100 mm dia PVC Conduit 200
Supply and installation of following M.S Pull Boxes for data / voice /
2 power / UPS circuits, recessed on wall or column as per design
drawings. Complete in all respect.
a 300mm×300mm×50mm 20
Supply & installation of following sizes of M.S Powder Coated
Perforated 16 SWG Cable tray with 18 SWG cover duly Painted
3 with anti corrosive paint after degreesing, derusting, phosphating
and antirust primer including all installation accessories such as rovel
bolts e.t.c. Complete in all respects.
a 300 mm x 100 mm (Horizontal / Vertical For Power) 50
b 150 mm x 100 mm (Horizontal / Vertical For Communication) 50
4 Supply and Installation of Linear Outlet Boxes without face plates
made of Aluminum, mounted on wall or punched in furniture as per
design drawings. The linear outlet boxes are to be provided
appropriate size knock outs. (Refer Drawing)
a Linear Outlet Box (300mm x 100mm x 50mm) 25
Note: Contractor is advised to confirm the sizes, running lengths and
termination as per site conditions before commencement of work. All
the conduits / cable tray crossings through partition walls shall be
properly sealed by fire retardant material after installation.

Total Amount (Rs.) Sec - B


(CARRIED FORWARD TO SUMMARY)
SECTION - C SWITCHES & SOCKETS

Supply & installation of following 10 Amps switches or 10/13/15/20


Amps socket outlets make including 16 SWG sheet steel back boxes
recessed / surface on wall or as per design drawings. (Selected Series
for Switch socket outlet is Clipsal Pieno for Switch, Vivace for Socket or
equivalent)
1 10A, 220V One Gang Switch Unit 12
2 10A, 220V Two Gang Switch Unit 7
3 10A, 220V Three Gang Switch Unit 19
S.N
DESCRIPTION QTY
O.
4 10A, 220V One Gang Two Way Switch Unit 2
5 13A, International Switch Socket unit (For Raw Power) 51
6 13A,Flat Duplex Switch Socket unit (For UPS Power) 15
7 15A, 3 Pin Round Switch Socket unit (For Raw Power) 5
8 20A, 3 Pin Round Switch Socket unit (For Raw Power) 17
9 20A, 3-Pin Industrial Socket 2
10 32A, 3-Pin Industrial Socket 3
11 32A, 5-Pin Industrial Socket for UPS 1
12 32A TP Isolator for Outdoor Units 2

Total Amount (Rs.) Sec - C


(CARRIED FORWARD TO SUMMARY)
SECTION - D
MAIN / SUB-MAIN CABLES
Supply, Installation, testing and commissioning of following sizes of
Main / Sub main Cables in already installed cable tray, conduit
etc. Including all accessories, lugs, glands etc. complete in all
respect as shown on drawing.
1 From Utility Meter to MDB 70
2x 4C-150 Sqmm Al/XLPE/PVC + ECC 1x 1C-70 Sqmm Cu/PVC
2 From Genset to MDB 50
1x 4C-150 Sqmm AI/XLPE/PVC
From MDB TO DB-GF-01
4C-35 Sqmm Cu/PVC/PVC + 4C-16 Sqmm Cu/PVC/PVC + ECC 1C-16
3 40
Sqmm
Cu/PVC
From DB-GF-01 TO DB-1F1
4 4C-16 Sqmm Cu/PVC/PVC + ECC 1C-16 Sqmm Cu/PVC + 4C-10 15
Sqmm Cu/PVC/PVC
5 From MDB TO UDB-01 20
4C-6 Sqmm Cu/Cu/PVC + ECC 1C-6 Sqmm Cu/PVC
Note:
1) Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.
2) Rain water drip protection is required for laying of cables from
building service shaft to respective distribution boards. All the cable
crossings through shaft shall be properly sealed by fire retardant
material after installation.

Total Amount (Rs.) Sec - D


(CARRIED FORWARD TO SUMMARY)
SECTION - E DISTRIBUTION BOARDS

Supply & installation, testing & commissioning of following Distribution


Boards as shown on drawing made with 14 SWG sheet steel
housing including all installation accessories such as Rawal bolt etc.
Complete in all respects.
Note:
Refer SLD and General Notes.
1 MDB 1
2 DB-GF-1 1
3 DB-1F-2 1
4 UDB-01 1

Total Amount (Rs.) Sec - E


(CARRIED FORWARD TO SUMMARY)
SECTION - F
LIGHTING FIXTURES (OFM ITEM)
Installation of the following lighting fixture complete with
ballast, drivers, suspension ropes, mounting accessories, specified
lamps, complete in all respects.
1 20W LED T5 Batten Lights ,Linearly connectable1200mm Color 4000k 215
pf>0.9
2 Surface Recessed LED Down Light Fixture with 15W ,4000k,90 56
lm/W or as approved by the architech
3 Recessed LED Down Light Fixture with 10W ,4000k,90 lm/W or as 20
approved by the architech
4 10" Exhaust Fan 20W 4
5 10 W Emergency light with Built in Battery for 3 Hours and Twin LED 18
Lamps Each of 5W
6 48" Dia Ceiling Fan 23
Note:
1) All light fixtures subject to approval of Architect / Consultant.
2) The Bidder shall provide the complete Technical Literature of light
fixtures.
3) All Light fixtures shall be taken from single source only.

Total Amount (Rs.) Sec - F


(CARRIED FORWARD TO SUMMARY)
SECTION - G
UPS (UNINTERRUPTIBLE POWER SUPPLY) (OFM ITEM)
SECTION - G
UPS (UNINTERRUPTIBLE POWER SUPPLY) (OFM ITEM)
Installation, testing, comissioning and co-ordination with vendor of
following UPS
at site as per following specifications.
Rating: 10 kVA
3 Phase IN & 3 Phase Out
True Online Double Conversion Pure sine wave Microcontroller based.
Input voltage : 230 Volts
Input frequency : 50 Hz Output voltage : 230 Volts Output p.f : 0.9
(Built in PFC)
Backup Time: 10 mins at full load (With Batteries) Batteries : Dry
Sealed Maintenance Free Voltage Regulated 10 years
Overload 110 % for 10 min
Capacity : 125% for 1 min Operating Temp : 0 to 40 degC
Mounting : Cabinet Mounting
User friendly LCD display for real time UPS status Cold start of load
1 during power failure Transient/Surge Suppressor EMI/RFI Filter 1
Built-in manual and static by-pass switch Remote & local emergency
power off function
RS-232 connectivity with power management software Provision for
external battery bank
UPS & Advance Automatic Battery Management system for
temperature compensated battery charging and battery testing on user
defined time.
Power Chute Network Shutdown.
RPA Kit (Parallel Operation of both the UPS is mandatory) SNMP
Management Card

.
Total Rs. Section-G
(CARRIED FORWARD TO SUMMARY)
SECTION - H
VOICE & DATA COMMUNICATION SYSTEM
Supply, installation, testing and commissioning of following items for
voice and data communication system including all material, labor,
tools, accessories etc. Complete in all respects. Quantities for cables
shown in BOQ are estimated and taken from drawings. Contractor is
advised to take measurement at site before commencement of works.
Note:
1). Different colors of voice and data cables shall be used.
2). Conduit Dia shall not exceed the limit mentioned in BOQ and
Drawings.
3). Cables lengths will be verified by Fluke Test and exact length shall
reflect the Measurement Sheet/ Bill issued by the contractor. Cables
left in Data Center for connection with Patch Panels shall not exceed
the required length.
4). Selected Series for Face plates is Clipsal Pieno or equivalent.

Simplex Face plate with 1 Gang RJ-45 I/O for Data (CAT-6) white/off
1 white finish, complete with shuttered click-ins, labels and all 30
accessories including back box.
2 CAT-6 UTP Cables for Data communication system from Com Rack 4
to each workstation in 25mm dia PVC Conduit as per drawings
including termination and tagging at both ends. Complete in all
respects.
305m/Coil
Communication Rack 15U (Floor Mounted), suitable for installation of
standard patch panels and etc. Complete with floor base, vertical cable
managers. Rack shall be equipped with power distribution units (PDUs)
4 3
with at least 5 imported power sockets & proper ventilation system
including fan etc. Complete in all respects.

Following CAT-6, Sliding Patch Panels equipped with RJ-45 Tool Less
I/Os for Voice and Data communication system with rear cable
5
organizer including all labeling and all mounting accessories. Complete
in all respects.
a 48-port CAT-6 patch panel for Voice and data 3
CAT-6 factory certified Patch Cords of specified color having RJ-45
6
connectors at both ends for Voice/Data Communication.
a 3 meter long. 20
b 1 meter long. 48
Front Cable Organizer for voice & data patch panels / wiring
7 blocks with complete labeling and dressing for incoming cable 2
management.
8 Connection from Comm Rack to communication racks via following
Fiber Optic Cable
6 Core, Single Mode Fiber Optic Cable including termination as per
standard specifications, all termination accessories up to entire
a 50
satisfaction of IT Engineer, in appropriate size of already installed
conduit / cable tray including testing.
Testing and commissioning of all above items, termination and
12 connectivity at both ends, including submission of detailed test report 1
from the Principals.
Allow for any other item or labour required for completion of system
not covered in BOQ or specifications / drawings in accordance with the
same standards and brands shown and approved by consultant. All
13 such items shall be covered in this item but complete description, item 1
rates, quantity required and brands shall be mentioned separately and
to be attached with the BOQ.

Note: Contractor is advised to confirm the cable running lengths and


termination as per site conditions before commencement of work.

Total Amount (Rs.) Sec - H


(CARRIED FORWARD TO SUMMARY)
SECTION -I
CCTV SYSTEM (IP BASED) (OFM ITEM)
Installation, Testing & Commissioning of following items for CCTV
System (IP Based) including but not limited to the description given
here under including all power and communication accessories,
housings, mounting brackets, suspension rods etc. required for
completion of the system.
Surface/Recessed Ceiling mounted Dome fixed type PoE Powered
I.P Camera with day and night feature with 2-MP (1920 x 1080)
1 with live and recording quality of minimum 15 fps, Fixed Lens, 9
along with all mounting accessories complete in all respect as per
drawing and specification.
Network Video Recorder (NVR) with 48 channel Video input. The
NVR shall be equipped with LAN / WAN facility. NVR should have
minimum 30 days storage capacity on 25 frame per second with 40 TB
HDD or higher if required to cater 100% cameras, RW CD Drive.
2 Complete with all connecting cords and accessories including SFP 1
modules.
(Model Promise Vess R2600iS 16x 2TB NL SAS HDD, 32TB or
equivalent)
Supply & wiring of Cat-6 cable for CCTV system in 25mm dia PVC
conduit from each camera to Network Switch & Network switch to
3 Server Room as per drawings including termination and tagging 2
at both ends. Complete in all respects.
305m/Coil
Allow for any other item required for completion of system not covered
in BOQ or specifications / drawings in accordance with the same
standards and brands shown and approved by consultant. All such
4 items shall be covered in this item but complete description, item 1
rates, quantity required and brands shall be mentioned separately
and to be attached with the BOQ.

Note:
1) The supplier to confirm the storage requirement as per number of
cameras, pixel resolutions, video compression and number of
recording days)
2)The Bidder shall provide the complete Technical Literature for the
system offered.
3) The Make and Model of the Data Switches shall be finalized and
selected with consent of Client's IT Team OR The switches may
completely be omitted from supply scope if needed by clients IT Team.
4)All the IT Equipements shall be verified by the Client IT. Team
before procurement

TOTAL RS. SEC - I


(CARRIED FORWARD TO SUMMARY)
SECTION - J
FIRE ALARM SYSTEM (OFM ITEM)
Installation, testing & commissioning of following items for Addressable
Fire Alarm System comprising of following equipments including all
accessories required for the completion of the system in all respects.

Addressable Fire Alarm Control Panel of 2-Loop, Expandable upto 4-


Loops having maximum of 127 devices per loop. The FACP shall be self
1 powered with built in 12V batteries for 24 Hrs backup with charging 1
unit. It can be programmed using Windows based software for
peripheral devices like display unit, printers etc.
Addressable Smoke Detectors incorporating an LED indication
located in labyrinth with in the housing of the detector. Sensing of the
2 detector shall be adjustable via software between 0-90 seconds. The 18
detector shall have built in short circuit isolators on both inputs.

Addressable Heat Detectors incorporating an LED indication located in


labyrinth with in the housing of the detector. Sensing of the detector
3 shall be adjustable via software between 0-90 seconds. The detector 2
shall have built in short circuit isolators on both inputs.

Addressable Multi Detectors incorporating an LED indication located in


labyrinth with in the housing of the detector. Sensing of the detector
4 shall be adjustable via software between 0-90 seconds. The detector 2
shall have built in short circuit isolators on both inputs.

Addressable Break Glass Type Manual Call Point having a built in


short circuit isolator and built in microprocessor to ensure a response
time of max 1 second. It also incorporates an indication LED,
5 2
flashed after pressing the button to acknowledge the activation and
a key operation facility for testing purposes.

Addressable Type Indoor Loop Powered electronic sounder with


flasher and minimum sound out put 100 dB at 1 meter with
6 frequencies for variety of sounds as required. Souder shall be loop 2
wired and loop signaled, built in short circuit isolator, configured via
software.
Supply & wiring for whole Fire Alarm System using 2C, 1.5 Sq.mm
Fire Resistant Shielded Cable (Fire Rating for 2 hours) in 25mm dia
PVC conduit from fire alarm control panel to all sensors & devices
7 including all installation accessories. Complete in all respects. 250
Cable should comply below standard:
Fire retardant, Low Smoke, Zero Halogen cable BS 6387

Supply & wiring for power of FACP using 2C, 2.5 Sq.mm PVC cable
8 20
with 25mm dia GI Conduit.
Note:
1) The Bidder shall provide the complete Technical Literature for
the system offered.
2) Approved brands for fire rated cables are Prysmian, Cavicel and
Lapp.
3) Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.
4) Fire Alarm System shall be integrated/looped with the Building
Fire Alarm System.Make and Model shall be the same as that of
existing FA System

Total Amount (Rs.) Sec - J


(CARRIED FORWARD TO SUMMARY)
SECTION - K
PUBLIC ADDRESS SYSTEM (OFM ITEM)
Installation, testing & commissioning of following items for Public
Address System as described below including all accessories. Complete
with mounting brackets, wiring, adapters etc.
250 W Integrated Power Amplifier operating at 220V, AC suitable 1
for rack mounting incorporates two audio line level inputs: a Music
1
input and a priority call input. A built-in relay switches the amplifier
from the music input of priority call input.
2 6W Recessed type Speakers intended for high quality speech and 10
music reproduction with sealed enclosure protective against moisture
and dust. The speaker shall have output power adjustments for full,
half and quarter power outputs, including back boxes if required.

3 Volume Controller 1
4 Micro Phone Outlet including face plates and all other accessories. 1
Supply and Installation of of Wiring for Public Address / Back
Ground Music System using 2C, 1.5 Sq.mm flexible Speaker Cable as
5 20
per zoning layout shown in drawings in 25 mm dia PVC conduit.
Complete in all respects.
Supply and Installation of Wiring for Microphone outlet using
imported microphone Cable in 25mm dia PVC conduit under floor /
6 10
concealed in wall as shown in drawings. Complete in all respects.

Allow for any other item required for completion of system not covered
in BOQ or specifications / drawings in accordance with the same
standards and brands shown and approved by consultant. All such
7 items shall be covered in this item but complete description, item 1
rates, quantity required and brands shall be mentioned separately
and to be attached with the BOQ.

Note:
1) Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.
2) The Bidder shall provide the complete Technical Literature for
the system offered.
Total Amount (Rs.) Sec - K
(CARRIED FORWARD TO SUMMARY)
SECTION - L
EARTHING / GROUNDING SYSTEM
Supply, installation, testing and commissioning of following items for
Earthing / Grounding System including all material, boring, labor,
tools, transportation, all accessories etc. Complete in all respects as
per drawing and specification with detailed test reports.

Chemical Enhanced Earth using 20 mm dia imported copper bond


rod with imported soil conditioning material e.g low res including 6"
dia, 3m deep boring and back filled chemical to enhance conductivity.
1 6
Complete with termination clamps, 13" dia heavy duty cast iron
round cover as per details given in drawings.

Earth Connecting Point (ECP) or Equipotential bar made with 200mm


wide, 50mm high and 8mm thick tin plated Copper, as shown in
drawings. Bar shall be provided with holes suitable for installation
2 4
of 6 No. 70 sqmm bare copper conductor. ECP shall be enclosed in
appropriate size of powder coated metal enclosure with front accessible
cover.
Stranded bare copper conductors of following sizes in already
installed cable trays from Earth Station to ECP to as shown in
3
drawings.
Complete in all respects including termination at ECP.
a 70 Sq.mm Bare Copper Conductor 40
Supply, installation, testing and commissioning of following size of
Single core PVC Cables from ECP to several equipments in
already installed PVC Conduit/cable trays as per details given in
4
drawings, including all material, labor, tools, transportation,
accessories etc. Complete in all respects with detailed test reports.

a 1C, 70 Sq.mm PVC (Green) 50


5 Providing and making of Copper , Thermo Weld connection of
mfollowing conductors. as per detail Drawing & Specification. Complete
in all respects
a 1 x 70 Sq.mm Bare Cu. Conductor to 20 mm Dia copper Rod 4
Note: Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.

Total Amount (Rs.) Sec - L


(CARRIED FORWARD TO SUMMARY)
SECTION - M
Diesel Driven Generator
Installation, testing commissioning and transportation upto the
respective location at Ground Floor for following Diesel Generators
415V, 3-phase, water cooled with control panel, Jacket Water Heater,
AMF (without ATS), exhaust silencer, elbow etc.
The work also includes but not limited to
- Transportation upto respective location
- 1/2" thick neuprene Sheet or vibration isolator and
- placement on foundation pads
All generators shall be supplied with electronic governor.
The gensets shall be with set mounted radiator including Block Heater
and all accessories,batteries stand,batterries auto charger complete in
all respect.
Transportation of gensets on site including all accessories complete in
all respect. 4000 Operational Hours warranty from the date of
commissioning is required.
Note: Please find attached drawing of take-off panel for your perusal,
specify size & spaces you require to install synchronizing modules and
for control cabling into panel. (Refer Specifications)

150 kVA Diesel Generator (Prime) (with Canopy) (with Set Mounted
1 1
Radiator)
Supply & installation of following Weather proof acoustic canopy
having noise level not more than 72 db(A) at 1 m from
generator, Supplier shall submit material specifications and
2 construction details along with the quotation. Canopy shall be 1
painted with epoxy paint of approved color. The bottom of the canopy
must be completely closed. (Refer technical specifications)
Supply, installation, testing, commissioning & handling of control
cables for AMF operation of generator in accordance with the
3 1
specifications of generator suppliers. Complete in all respects.

4 Potential Equalization of all body parts including control panels, 1


exhaust gas pipe, generating sets base , water pipes , tanks etc.
Complete in all respects in accordance with the standard
specifications.
Supply of all first filling of consumables like Lube Oil ,
5 Coolant , Battery Electrolytes etc. as per requirements for all 1
generators. Complete in all respects.
Supply of spares for engine / generator and control panel 1
required for 500 operating hours as per manufacturers
6
recommendation and specifications. Supplier shall provide a list of all
spares with unit prices , make, models and origin.
100% On load testing of Gensets sets with material required for
7 its operation inclusive of fuel, engine oil etc for standard number 1
of hours as per good practices.
Fabrication and insatallation of 200 Litre Diesel Day tank ,Vertical
Cylinde shape, made with 4mm thick MS Sheet including all safety
8 valves, filling, Stand, level indicators etc. Tank shall be painted with 1
red oxide primer and Bitumen Coating for anti corrosion. Complete in
all respects.
Fabrication and Installation of 3000 Liters Underground Diesel Storage
Day Tank, Horizontal Cylindrical shape, made with 6mm thick MS Sheet
9 including all safety valves, filling, Stand, level indicators etc. Tank shall 1
be painted with red oxide primer and Bitumen Coating for anti
corrosion. Complete in all respects.
Supply, installation and testing of complete fuel transportation system
from 1 Nos. Underground Diesel Storage Tank to 1 Nos. Day Tanks
and Day Tanks to Generator.
Work included all the relevant piping, pumps and their weather proof
enclosures but not limited to following for completion of system:
Fuel Monitoring Meter to measure the quantity of purchased fuel. 1 No.
1-HP Diesel Transfer Electric Pump (1 Stand-By)
10 Suction pipe 25 mm Supply pipe 25 mm 1
Over flow pipe from tank to main Header 25 mm Over flow pipe upto
Underground Tanks 25 mm Non Return Valves, gate valves, strainer
etc.
Level Controller in both tanks
Weather proof Motor starter and control panels
Control Wiring for all pneumatic valve and level controller.

Dirty Lube Oil Drainage Systems along with M.S collection box
approximate size 2' x 2' x 6'' from all 4 No. Diesel Generators to Drain
11 1
Tank using appropriate size of MS piping including, valves, bends,
supports. Complete in all respects.
Allow for any other item required for completion of system not covered
in BOQ or specifications / drawings in accordance with the same
standards and brands shown and approved by consultant. All such
items shall be covered in this item but complete description, item
rates, quantity required and brands shall be mentioned separately
and to be attached with the BOQ.

Total Amount (Rs.) Sec - M


(CARRIED FORWARD TO SUMMARY)
SECTION - N
AS-BUILT DRAWINGS
Preparation of as-built drawings of all electrical and allied works
after final approval from the consultant/client.
Note: Submission of as-built drawings 2 sets after work completion of
1 1
each floor and 3 sets & soft copy of complete electrical works after final
commissioning of project. Approval of final bills are subject to
completion of as built drawings.
TOTAL RS. SECTION - N
(CARRIED FORWARD TO SUMMARY)
TOTAL AMOUNT
UNIT RATE
(Rs.)

No. 11,345 147,485

No. 6,820 306,900

No. 2,165 420,010

No. 11,345 22,690

No. 3,410 68,200

No. 11,345 22,690

No. 6,820 34,100

No. 3,325 49,875

No. 20,160 120,960


No. 10,080 211,680

No. 18,790 883,130

No. 28,665 143,325

No. 69,405 138,810

2,569,855

Rm. 205 20,500


Rm. 285 14,250
Rm. 685 68,500
Rm. 1,245 249,000

No. 6,950 139,000

Rm. 8,550 427,500


Rm. 6,250 312,500

No. 6,250 156,250


1,387,500

No. 1,715 20,580


No. 2,330 16,310
No. 3,175 60,325
TOTAL AMOUNT
UNIT RATE
(Rs.)
No. 1,725 3,450
No. 1,905 97,155
No. 2,380 35,700
No. 2,050 10,250
No. 2,925 49,725
No. 6,815 13,630
No. 8,815 26,445
No. 13,005 13,005
No. 13,355 26,710

373,285

Rm. 12,255 857,850

Rm. 4,675 233,750

Rm. 11,635 465,400

Rm. 8,425 126,375


Rm. 253 5,060

1,688,435

No. 300,000 300,000


No. 270,000 265,000
No. 155,000 150,000
No. 140,000 140,000

855,000

No. 2,340 503,100

No. 3,250 182,000

No. 2,100 42,000

Rm. 6,300 25,200


No. 16,000 288,000

No. 7,500 172,500

1,212,800
No. 1,750,000 1,750,000

1,750,000

No. 2,200 66,000


Coil. 77,400 309,600

No. 55,000 165,000

No. 61,500 184,500

No. 1,400 28,000


No. 1,100 52,800

No. 6,500 13,000

Rm. 760 38,000

Job. 50,000 50,000

Job. 0 0

906,900
No. 18,600 167,400

No. 455,000 455,000

Coil. 77,400 154,800

Job 0 0

777,200

No. 420,000 435,935


No. 10,600 20,280

No. 10,600 10,680

No. 12,600 11,205

No. 10,100 9,415

No. 15,600 13,310

Mtr. 1,150 287,500

Rm. 2,650 53,000

841,325
No. 360,000 360,000

No. 10,100 101,000

No. 20,600 20,600


No. 9,100 9,100

Rm. 600 12,000

Rm. 650 6,500

Job. 0 0

509,200

No. 77,000 462,000

No. 32,000 128,000


Rm, 3,400 136,000

Rm, 3,900 195,000

No. 25,000 100,000

1,021,000

No 7,600,000 7,600,000

No 800,000 800,000
No 155,000 155,000

No 60,000 60,000

No 110,000 110,000

No 160,000 160,000

No 210,000 210,000

No 170,000 170,000

No 1,250,000 1,250,000

No 275,000 275,000

No 65,000 65,000
10,855,000

Job 50,000 50,000

50,000
Executive Summary
Plumbing & Sanitary Services

A.K.S Mastuj Rev.01


Phase-I, Chitral Date: 12-09-2022

S. No. Description Material Amount Labour Amount Total Amount

1 SECTION - 01
SUPPLY & INSTALLATION OF PLUMBING FIXTURES 6,543,102 706000 7,249,102
2 SECTION-02 -
WATER SUPPLY SYSTEM. 3,629,750 341,400 3,971,150
3 SECTION-03 -

SOIL, WASTE VENT AND RAIN WATER DRAINAGE SYSTEM 991,380 107,800 1,099,180
4 SECTION-04 -
EXTERNAL SEWER & MANHOLES 931,200 70,600 1,001,800
5 SECTION-05 -
SUNDRIES 410,000 250,000 660,000
Total Cost of Plumbing & Sanitary Services Rs. 12,505,432 1,475,800 13,981,232

SEM Engineers Page 27 of 32


Bill of Quantities
Plumbing & Sanitary Services
A.K.S Mastuj Rev.01
Phase-I, Chitral Date: 12-09-2022
Material Labour Total
S.No. Description Unit Qty
Rate Amount Rate Amount Amount
SECTION - 01, SUPPLY & INSTALLATION OF PLUMBING
FIXTURES.
Supply and Installation of plumbing fixtures & faucets
complete in all respects including all accessories, support,
hangers, etc. ready to use as per specifications, drawings and
instructions of Consultant.
1.1 European style coupled floor mounted water closet with seat
cover, flush tank C.P. (chrome plated) connector, thimble, etc.

i. Type - EWC Nos. 4 71,500 286,000 7,500 30,000 316,000


1.2 Asian style water closet Orissa type with flush tank C.P.
(chrome plated) connector, uPVC Class "E" flush pipe,
thimble, P-Trap, etc. 45,200 - - -
i. Type - AWC Nos. 2 43,440 86,880 7,500 15,000 101,880
1.3 Toilet Hand Spray with flexible chain & telephone type shower
Including tee stop cock etc. complete in all respect. - - - -
i. Type - TS Nos. 6 14,145 84,870 1,500 9,000 93,870
1.4 Wash basin (WB) including bottle trap, waste, stop cocks, etc.
- - - -
i. Type - WB Nos. 2 41,200 82,400 7,500 15,000 97,400
ii. Type - WB (Vanity) Nos. 6 35,400 212,400 7,500 45,000 257,400
1.5 Wash basin hot and cold water mixer, etc. - - - -
i. Type - WB Nos. 2 25,400 50,800 4,500 9,000 59,800
ii. Type - WB (Vanity) Nos. 6 25,400 152,400 4,500 27,000 179,400
1.6 Stainless steel kitchen sink including stop cocks, P-trap /
Bottle trap, waste pipe etc complete in all respects. - - - -
i. SK - 1, 34" x 20" single bowl and single drainer. Nos. 2 42,100 84,200 7,500 15,000 99,200
1.7 Sink hot and cold water mixer, etc. - - - -
i. SK - 1 Nos. 2 29,040 58,080 4,500 9,000 67,080
1.8 Concrete type undr ground Grease trap for kitchen sinks.
Complete in all respects. - - - -
Size. 6'-0" x 5'-0" x 4'-0" No. 1 72,000 72,000 15,000 15,000 87,000
1.9 S.S Lab sink including stop cocks, P-trap / Bottle trap, waste
pipe etc complete in all respects. - - - -
i. LS - 24" x 18" single bowl and double drainer. Nos. 30 51,000 1,530,000 7,500 225,000 1,755,000
1.10 Mixer for hot and warm water etc. - - - -
i. For LS Nos. 60 54,600 3,276,000 3,000 180,000 3,456,000
1.11 S.S Lab sink including stop cocks, P-trap / Bottle trap, waste
pipe etc complete in all respects. - - -
i. LS - 24" x 18" single bowl and single drainer. Nos. 6 - - 7,500 45,000 45,000
1.12 Mixer for hot and warm water etc. - - - -
i. For LS Nos. 6 54,600 327,600 3,000 18,000 345,600

1.13 Toilet accessories complete set. - - - -


i. Soap Dispenser Nos. 6 9,240 55,440 1,500 9,000 64,440
ii. Towel Rail Nos. 4 7,800 31,200 1,500 6,000 37,200
iii. Paper Holder Nos. 4 6,120 24,480 1,500 6,000 30,480
iv. Coat Hooks Nos. 8 2,544 20,352 1,000 8,000 28,352
v. Hand Dryer Nos. 4 27,000 108,000 5,000 20,000 128,000
Sub Total Rs. 6,543,102 706,000 7,249,102

SEM Engineers Page 28 of 32


Bill of Quantities
Plumbing & Sanitary Services
A.K.S Mastuj Rev.01
Phase-I, Chitral Date: 12-09-2022
Material Labour Total
S.No. Description Unit Qty
Rate Amount Rate Amount Amount
SECTION-02 WATER SUPPLY SYSTEM. - - -
Supply, installation, testing and commissioning of complete
pipe work for cold and hot water system including all
accessories required to complete systems ready to operate as
per specification, drawings & instruction of Consultant.
- - -
2.1 Polypropylene Random PP-R pipes PN 20 and fittings with
fusion jointing along with all types of unions, tees, bends,
sockets, clamps, hangers, supports, sleeves, masking plates,
chiseling, making holes making good, excavation, bedding
backfilling as required complete in all respect.
- - -
i. Dia. OD 25 mm Rft. 850 245 208,250 50 42,500 250,750
ii. Dia. OD 32 mm Rft. 30 410 12,300 50 1,500 13,800
iii. Dia.OD 40 mm Rft. 130 655 85,150 80 10,400 95,550
iv. Dia. OD 50 mm Rft. 250 1,250 312,500 80 20,000 332,500
v. Dia. OD 63 mm Rft. 110 1,815 199,650 100 11,000 210,650
vi. Dia. OD 75 mm Rft. 50 2,780 139,000 100 5,000 144,000
2.2 Brass body gate valves / ball valves with unions. - - -
i. Size 3/4" Nos. 16 7,215 115,440 1,500 24,000 139,440
ii. Size 1" Nos. 2 10,020 20,040 1,500 3,000 23,040
iii. Size 1-1/4" Nos. 6 16,550 99,300 2,000 12,000 111,300
iv. Size 1-1/2" Nos. 4 23,500 94,000 2,000 8,000 102,000
v. Size 2" Nos. 2 34,590 69,180 2,000 4,000 73,180
2.3 Brass body check valve. - - -
i. Size 2" Nos. 2 34,900 69,800 2,000 4,000 73,800
2.4 Brass body Three way valve. - - -
i. Size 3/4" Nos. 2 11,020 22,040 1,500 3,000 25,040
ii. Size 1" Nos. 2 15,900 31,800 1,500 3,000 34,800
iii. Size 1-1/4" Nos. 3 44,800 134,400 2,000 6,000 140,400
2.5 Brass body foot valve. - - -
i. Size 2" Nos. 2 34,500 69,000 2,000 4,000 73,000
2.6 Brass body float valve. - - -
i. Size 1" No. 1 15,900 15,900 2,000 2,000 17,900
2.7 C.I. Cover with frame for under ground tank & over head tank.
- - -
i. Round Dia. 21" (for U/G tank weight 40 kg.) Nos. 2 52,000 104,000 1,500 3,000 107,000
2.8 Goose neck for O/H tank. - - -
i. Size 3" No. 1 12,500 12,500 2,500 2,500 15,000
2.9 Bib cock brass body for washing area. - - -
i. Size 3/4" Nos. 4 3,500 14,000 1,000 4,000 18,000
2.10 Hot water storage heater (Electric) suitable for 30 psi working
pressure including thermostat, inlet/outlet connection.
Pressure relief valve. - - -
i. HWE-30 (30 Litres Storage Capacity) Nos. 2 65,000 130,000 12,000 24,000 154,000
ii. HWE-50 (50 Litres Storage Capacity) Nos. 2 72,500 145,000 12,000 24,000 169,000
iii. HWE-100 (100 Litres Storage Capacity) Nos. 3 95,000 285,000 13,500 40,500 325,500
2.11 Insulated Fiber glass storage tank with C.C foundation, inlet /
outlet connection suitable for portable water. - - -
i. Capacity. 1500 US Gallon. No. 1 485,000 485,000 35,000 35,000 520,000
2.12 Water transfer pump set with electric motor complete in all
respects including C.C foundation, inlet/outlet connections,
unions, flexible rubber connector, electrical connection with all
fixing accessories, water proof electrical panel with automatic
control system for tank low and high level, auto stop with
overflow, complete in all respects.
- - -
i. WTP-1 50 gpm @ 35 feet haed (1 duty & 1 standby) Set. 1 676,500 676,500 30,000 30,000 706,500
2.13 Motor control electrical panel with IP-56 protection including
incoming outgoing MCCBs, automatic for above mentioned
pumps, control system for auto filling of water to fill the O/H
tank, auto stop with overflow, dry run protection, Control wiring
from panel to U/G & O/H tank in G.I conduits complete in all
respects as per instruction of consultant.
Job. 1 80,000 80,000 15,000 15,000 95,000
SEM Engineers Page 29 of 32
Bill of Quantities
Plumbing & Sanitary Services
A.K.S Mastuj Rev.01
Phase-I, Chitral Date: 12-09-2022
Material Labour Total
S.No. Description Unit Qty
Rate Amount Rate Amount Amount
Sub Total Rs. 3,629,750 341,400 3,971,150

SEM Engineers Page 30 of 32


Bill of Quantities
Plumbing & Sanitary Services
A.K.S Mastuj Rev.01
Phase-I, Chitral Date: 12-09-2022
Material Labour Total
S.No. Description Unit Qty
Rate Amount Rate Amount Amount
SECTION-03 SOIL, WASTE VENT AND RAIN WATER
DRAINAGE SYSTEM - - -
Supply, fixing, testing and commissioning of equipment, pipe
work required to complete the soil, waste, vent and rain water
systems in all respects with accessories ready to operate as
per specifications, drawings and instructions of Consultant.
- - -
3.1 uPVC pipes of approved make along with specials, fittings,
bends, wye, tees, sockets, flexible connectors, sleeves,
masking plates, chiseling, making hole, excavation, backfilling
making good where as required jointing with rubber ring seal.
- - -
i. Dia. 1-1/2" Rft. 40 505 20,200 100 4,000 24,200
ii. Dia. 2" Rft. 250 570 142,500 100 25,000 167,500
iii. Dia. 4" Rft. 430 1,410 606,300 150 64,500 670,800
3.2 Floor trap including S.S grating floor trap, inlet outlet
connection complete in all respects. - - -
i. FT- with 4" P - trap Nos. 20 8,500 170,000 500 10,000 180,000
3.3 Cleanout for soil, waste pipes of approved make. - - -
i. For 4" dia. Pipe with SS floor cover plate (FCO) Nos. 7 6,740 47,180 500 3,500 50,680
3.4 uPVC cowl for vent pipe of the following dia. including all
accessories complete. - - -
i. Size. 2" Nos. 2 1,200 2,400 200 400 2,800
ii. Size. 4" Nos. 2 1,400 2,800 200 400 3,200
Sub Total Rs. 991,380 107,800 1,099,180
SECTION-04 EXTERNAL SEWER & MANHOLES
- - -
Supply, fixing, testing and commissioning of equipment, pipe
work required to complete the sewerage disposal services in
all respects with accessories ready to operate as per
specifications, drawings and instructions of Consultant.
- - -
4.1 uPVC pipes class 'D' for Sewer drainage with push fit rubber
joints including excavation in any type of soil, dewatering if
required bedding, back filling with selected material, removing
of extra materials. - - -
i. Dia. 6" size Rft. 180 4,200 756,000 200 36,000 792,000
ii. Dia. 8" size Rft. 20 6,510 130,200 230 4,600 134,800
4.2 Construction of Gully Trap with material including, excavation,
4" size uPVC P-trap CC base CI cover with frame, CC
benching water proof internal plaster inlet/out connections etc.
- - -
i. Type GT, Size 10"x10" Job. 3 15,000 45,000 10,000 30,000 75,000
4.3
Construction of manholes with material including, excavation,
base top RCC slab CI cover with frame, GI steps, CC
benching water proof internal plaster inlet/out connections etc.
- - -
i. Size. 24" X 24" Nos. 7 - - -
4.4 Construction of RCC Septic tank with material including,
excavation, base top slab bedding, GI steps, CI double
covers, internal CC water proof plasters, uPVC tees, CC
benching, inlet/outlet connection etc, complete in all respects.
(Except civil works) - - -
i. Size 7'-0" x 12'-0" x 6'-0" water depth Job. 1 - - -
4.5 Construction of soak away pit with material including,
excavation, masonry block walls RCC top cover slab, 21" dia
CI single cover 40 kg, stone filling inlet connections vent, etc
complete in all respect. (Except civil works) - - -
i. Size.7 feet dia 20 feet depth. Job. 1 - - -
Sub Total Rs. 931,200 70,600 1,001,800
SECTION-05 SUNDRIES - - -

SEM Engineers Page 31 of 32


Bill of Quantities
Plumbing & Sanitary Services
A.K.S Mastuj Rev.01
Phase-I, Chitral Date: 12-09-2022
Material Labour Total
S.No. Description Unit Qty
Rate Amount Rate Amount Amount
Contractor will priced the sundries items for all Plumbing &
Sanitary (P&S) services as per specifications, drawings and
instruction of consultant.
- - -
5.1 Submittals, samples, shop drawings, inspections, As-Built
drawings, operation and maintenance manuals and the like as
required by specification.
Job. 1 350,000 350,000 20,000 20,000 370,000
5.2 Painting, identification and tagging to the P&S installations
and equipments.
Job. 1 35,000 35,000 30,000 30,000 65,000
5.3 Testing, and commissioning entire P&S installation as per
Engineer's approval. Job. 1 25,000 25,000 200,000 200,000 225,000
Sub Total Rs. 410,000 250,000 660,000

TOTAL OF ALL SECTIONS RS. 12,505,432 - 1,475,800 13,981,232

SEM Engineers Page 32 of 32