Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

RA No: Date of Issue:

Last Reviewed: Assessed by


Next Review: No of pagers:
RISK ASSESSESING SYSTEM OL/H&S/7/DOC/018/01
TITLE :

Risk assessment details


Plant/Equipment
Item description:
Make/Model No:
Serial No:
Work Location:
Section/
Department:
Risk owner:

Risk Assessment Metric

Unacceptable Risk control hierarchy


17-25 Stop activity and make immediate improvements
Tolerable 1. Elimination
10-16 Look to improve with in specified timescale 2. Substitution
Adequate 3. Engineering controls
5-9 Look to improve at next review
4. Management control
Acceptable 5. PPE
1-4 No further action, but ensure controls are maintained
*Risk level = Probability Level X Severity Level

Level PROBABILITY SEVERITY


1 Rare – Conceivable but only one extreme circumstances / Once a 10 yeas Insignificant- Hazard presents a minimal threat to safety, health and well-being of
exposing to the risk participants; insignificant.
2 Unlikely- Hasn’t happened yet but could / Once a year exposing to the risk Minor- May cause minor injury, illness, property damage, financial loss and/or result in
negative publicity for the organization
3 Possible – Could happen or known it to happen / / Once a month exposing Moderate- May cause moderate injury, illness, property damage, financial loss and/or
to the risk result in negative publicity for the organization
4 Likely- Could easily happen / Weekly exposing to the risk Major- May cause severe injury, major property damage, significant financial loss, and/or
result in negative publicity for the organization
5 Almost certain- Often occurs / Continually exposing to the risk Catastrophic- May result in death or multiple death and/or severe property damage
and/or damaging to company reputation very badly
Note- This risk assessment must be reviewed immediately after modify the machine or system, changing the proses or row material or power source or after accident, incident or near miss
occurred relating to the process, system, machine or equipment.

Reviewed By: Manager Health & safety Signature: Date :


Approved By: Managing Director Signature: Date :
RA No: Date of Issue:
Last Reviewed: Assessed by
Next Review: No of pagers:
RISK ASSESSESING SYSTEM OL/H&S/7/DOC/018/01
TITLE :

Reviewed By: Manager Health & safety Signature: Date :


Approved By: Managing Director Signature: Date :
RA No: Date of Issue:
Last Reviewed: Assessed by
Next Review: No of pagers:
RISK ASSESSESING SYSTEM OL/H&S/7/DOC/018/01
TITLE :

Risk assessment

Activity or process Description of Hazard Current Controls & Type of Residual Risk Additional Control Person responsible
controls and unsafe conditions Description
(What has potential to cause
(What is in place to controls the risk? List Severity (What should be done in the
Probabilit
for corrective and
injury or damage to Risk future to control the risk? What preventive action &
any control measures already implemented y
property/environment?)
or unsafe condition if available) can be done to eliminate or target date or
further reduce the risk?) timeframe

Reviewed By: Manager Health & safety Signature: Date :


Approved By: Managing Director Signature: Date :
RA No: Date of Issue:
Last Reviewed: Assessed by
Next Review: No of pagers:
RISK ASSESSESING SYSTEM OL/H&S/7/DOC/018/01
TITLE :

Reviewed By: Manager Health & safety Signature: Date :


Approved By: Managing Director Signature: Date :

You might also like