Document No BTM.P3.04-1
CHANGE CONTROL Release No 20
MANAGEMENT ‘Amendment No 1
PROCEDURE Date 18 January 2019
JKR MALAYSIA Page a
‘A.___PERMOHONAN PEMBANGUNAN APLIKASI BARU / PENAMBAHBAIKAN
Permohonan oleh Tarik
Nama Pemiohon NURFATIHAH BINTIABDULLAH | Jawatan ‘JURUUKUR BAHAN (J44) 2isre022
es CAWANGAN DASAR & Bahagian/Unit_ UNIT PEMBANGUNAN SKIM DAN No. Rujukan Permohonan
‘awangan PENGURUSAN KORPORAT ‘agian’ KEJURUTERAAN 01/2022
Emel fatinah@ikr gov.my
Telefon 03-26198654
Kategori (Toads (7) piokSersenvaon
Tainan (aie ator
Penambah
/ rae Pembetulan Interface Pengguna Data
SistemiModul
Sistem Portal JKR
Modules ‘Sub-Menu Perkhidmatan
Tindakan (Tone (7) a pak basen
Keutamaan 1 | Tinggi Sederhana Rendah
Perihal Perubahan/ Permohonan Baru: juria mations! enter sia marian seco /root/dumen
Description of| 1. Tambah sub-menu Khidmat Pakar > Pensijlan 7
| | requested system
change
SHACPTA RR MALAYSIADocument No BTM.P3,04-1
CHANGE CONTROL Release No 20
MANAGEMENT ‘Amendment No 1
PROCEDURE Date 18 January 2019
JKR MALAYSIA Page 2/2
Reason for the change | 4
request 2
List all technical
changes to hardware
coding, database,
networks, servers,
reporting, etc, required
in order to implement
request
‘Terdapat penambahbaikan sub menu di bawah khidmat pakar iaitu pensijian untuk dipaparkan di web JKR.
‘Sub menu ini akan memaparkan pegawai JKR yang telah Iulus dan dianugerahkan pensijilan tahap 4
Roles: user impacts by
type of user, changes to
user roles
Risks to be considered
in the change, including
a review of reporting
secur, user training,
‘@HARGPTAIRR WALATSIAJKR MALAYSIA
CHANGE CONTROL,
MANAGEMENT
PROCEDURE
Document No
Release No
‘Amendment No
Date
Page
BTM P3.04-1
20
1
18 January 2019
3/2
System inerTaces,
backups and conversion
\Mitigation/Rol Back
Options
Estimate of costs and
Fesources required to
implement the change
User training or ether
‘communications
required
Testing: Specify testing
required prior to
placement into
production
(seraraan ja ada apa)
‘Tandatangan Pemohon, Diluluskan olet
Nama Fath Abdalle, Nama
Tarikh ¥8/r922 Tarikh
|B. TINDAKAN (oleh UNIT SISTEM APLIKAS! (USA))
Keputusan (Tanda /) peak bersesuion)
Change Approved | | Change Not Approved
Hold (Future
Enhancement)
[Orne
‘ieaedah Pelaksanaan
Dalaman
=
(Tanda (7) peta bersesunian)
G@HAKGPTA KR MALAYSIADocument No BTM.P3.04-1
CHANGE CONTROL Release No 20
MANAGEMENT ‘Amendment No 1
PROCEDURE Date 18 January 2019
JKR MALAYSIA Page 412
Keterangan Tindakan
Developer Diluluskan oleh:
Nama Nama
Tarik Tarikh
‘Jangkamasa Siap ;
Penjadualan : refer attachment
sk: Kelua Penolong Pengarah Kanan (STM)
SHARC TARR MALAYSIA