Any changes in mechanical GA shall be taken care by

STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC.
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

FOUNDATION ON GRID C2021-D2021


PARTICULARS SYMBOL FORMULA UNIT LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD
101 102 103 104 105 106 107 108
INPUT DATA (GENERAL) Load case (1) Normal (2) wind/seismic 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
2
SAEF BEARING CAPACITY (NET SBC) SBC t/m 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000
FOUNDING DEPTH FROM GRADED LEVEL H m 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000
PEDESTAL HEIGHT ABOVE GRADED LEVEL Ht m 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300
GRADE OF CONCRETE fck N/sqmm 20 20 20 20 20 20 20 20
GRADE OF STEEL fy N/sqmm 500 500 500 500 500 500 500 500

Y-DIRECTION PARAMETERS
CENTER TO CENTER DISTANCE OF PEDESTALS LY m 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400
FRONT CANTILEVER DISTANCE FROM CENTER LINE OF
PED LF m 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600
BACK CANTILEVER DISTANCE FROM CENTER LINE OF
PED LB m 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600

X-DIRECTION PARAMETERS
CENTER TO CENTER DISTANCE OF PEDESTALS LX m 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400
RIGHT CANTILEVER DISTANCE FROM CENTER LINE OF
PED LR m 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500

LEFT CANTILEVER DISTANCE FROM CENTER LINE OF PED LL m 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500

INPUT LOAD DATA (RIGHT TOP PEDESTAL) AT BASE


PLATE LEVEL
VERTICAL LOAD prt tonne 5.507 11.642 -0.787 -1.278 12.671 6.513 6.857 15.266
HORIZONTAL SHEAR IN X -DIRECTION X1 tonne 0.133 1.946 1.723 0.390 0.700 0.114 0.039 0.448
HORIZONTAL SHEAR IN Y-DIRECTION Y1 tonne 0.724 0.843 0.604 1.568 3.112 0.767 1.115 2.320
MOMENT ABOUT Y-Y DUE TO HOR SHEAR IN X-DIR MyRt t-m 0.438 6.421 5.684 1.288 2.311 0.376 0.128 1.478
MOMENT ABOUT X-X DUE TO HOR SHEAR IN Y-DIR MxRt t-m 2.410 2.805 2.010 5.715 10.879 2.556 3.780 7.732

INPUT LOAD DATA (RIGHT BOT PEDESTAL) AT BASE


PLATE LEVEL
VERTICAL LOAD prb tonne 13.709 14.761 12.634 20.851 6.137 13.977 14.991 44.766
HORIZONTAL SHEAR IN X -DIRECTION X2 tonne 0.888 1.344 0.420 1.439 0.291 0.806 0.779 2.353
HORIZONTAL SHEAR IN Y-DIRECTION Y2 tonne 0.548 0.765 0.323 2.475 1.456 0.512 0.244 1.646
MOMENT ABOUT Y-Y DUE TO HOR SHEAR IN X-DIR MyRb t-m 2.979 4.461 1.464 4.813 0.996 2.732 2.637 8.006
MOMENT ABOUT X-X DUE TO HOR SHEAR IN Y-DIR MxRb t-m 1.807 2.524 1.066 8.168 4.805 1.691 0.804 5.430

INPUT LOAD DATA (LEFT TOP PEDESTAL) AT BASE


PLATE LEVEL
VERTICAL LOAD pLt tonne 3.479 -3.261 10.420 -6.925 14.789 4.677 5.465 6.025
HORIZONTAL SHEAR IN X -DIRECTION x3 tonne 0.409 1.443 2.302 0.006 0.852 0.666 0.573 0.782
SH 1 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD
109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126
2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000
3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000
0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500

3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400

0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600

0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600

3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400

0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500

0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500

4.157 10.010 -2.418 -2.910 11.039 4.881 5.225 2.870 2.526 10.248 -2.181 -2.672 11.277 5.119 5.463 3.108 2.763 9.622
0.304 1.909 1.760 0.428 0.663 0.151 0.076 0.342 0.267 1.901 1.768 0.435 0.655 0.159 0.084 0.334 0.259 1.899
0.333 0.582 0.343 1.829 2.851 0.506 0.854 0.421 0.072 0.615 0.376 1.796 2.884 0.539 0.887 0.454 0.105 0.536
1.003 6.298 5.807 1.411 2.188 0.499 0.251 1.128 0.880 6.273 5.833 1.436 2.162 0.524 0.277 1.102 0.855 6.267
1.157 1.936 1.141 6.584 10.011 1.687 2.911 1.395 0.304 2.044 1.249 6.476 10.119 1.796 3.019 1.504 0.413 1.782

12.427 9.604 7.477 15.694 0.980 8.820 9.834 8.284 7.270 10.324 8.197 16.414 1.700 9.540 10.554 9.004 7.990 8.749
0.996 1.080 0.156 1.175 0.026 0.541 0.515 0.705 0.731 1.135 0.211 1.230 0.082 0.597 0.570 0.760 0.787 1.017
0.851 0.578 0.136 2.288 1.643 0.326 0.057 0.396 0.665 0.608 0.166 2.318 1.613 0.355 0.087 0.426 0.694 0.542
3.320 3.566 0.562 3.911 0.093 1.830 1.735 2.328 2.418 3.747 0.746 4.095 0.278 2.014 1.919 2.509 2.602 3.363
2.809 1.908 0.449 7.551 5.422 1.074 0.188 1.306 2.193 2.007 0.548 7.650 5.323 1.173 0.286 1.405 2.292 1.789

1.493 -3.799 9.882 -7.463 14.251 4.139 4.927 1.743 0.955 -3.625 10.056 -7.289 14.426 4.313 5.101 1.917 1.129 -4.093
0.245 1.526 2.219 0.090 0.769 0.582 0.489 0.068 0.161 1.496 2.249 0.059 0.799 0.612 0.519 0.098 0.191 1.559
SH 2 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD
127 128 129 130 131 132 133 134 135 136 137 138 139 140 141
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000 12.000
3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000
0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
500 500 500 500 500 500 500 500 500 500 500 500 500 500 500

3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400

0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600

0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600 0.600

3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400

0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500

0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500

-2.806 -3.297 10.651 4.493 4.838 2.483 2.138 10.136 0.193 -0.200 10.959 6.033 6.308 4.424 4.149
1.769 0.437 0.653 0.161 0.086 0.332 0.257 1.574 1.361 0.295 0.578 0.074 0.014 0.321 0.261
0.297 1.875 2.805 0.460 0.808 0.374 0.026 0.773 0.582 1.155 2.589 0.713 0.991 0.645 0.366
5.838 1.442 2.156 0.530 0.282 1.097 0.849 5.195 4.490 0.973 1.906 0.243 0.045 1.059 0.860
0.987 6.738 9.856 1.533 2.757 1.241 0.153 2.574 1.938 4.242 9.033 2.375 3.354 2.141 1.251

6.622 14.839 0.125 7.964 8.979 7.429 6.414 13.663 11.961 18.535 6.764 13.036 13.847 12.607 11.796
0.093 1.112 0.036 0.479 0.452 0.642 0.669 1.211 0.472 1.287 0.369 0.780 0.759 0.911 0.932
0.100 2.252 1.679 0.290 0.021 0.360 0.628 0.690 0.337 2.058 1.087 0.488 0.273 0.544 0.759
0.354 3.704 0.123 1.622 1.527 2.124 2.211 4.021 1.623 4.303 1.249 2.638 2.562 3.033 3.109
0.330 7.432 5.541 0.955 0.069 1.187 2.074 2.277 1.110 6.792 3.587 1.610 0.901 1.796 2.505

9.588 -7.757 13.957 3.845 4.633 1.449 0.661 -1.986 8.959 -4.917 12.455 4.364 4.995 2.448 1.818
2.186 0.122 0.736 0.550 0.457 0.036 0.129 1.083 1.913 0.066 0.753 0.604 0.529 0.192 0.267
SH 3 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

HORIZONTAL SHEAR IN Y-DIRECTION y3 tonne 0.423 0.233 0.622 1.877 2.884 0.486 0.845 0.618
MOMENT ABOUT Y-Y DUE TO HOR SHEAR IN X-DIR MyLt t-m 1.348 4.761 7.597 0.020 2.812 2.196 1.890 2.580
MOMENT ABOUT X-X DUE TO HOR SHEAR IN Y-DIR MxLt t-m 1.401 0.796 2.071 6.624 9.962 1.610 2.853 2.068

INPUT LOAD DATA (LEFT BOT PEDESTAL) AT BASE


PLATE LEVEL
VERTICAL LOAD pLb tonne 9.097 7.513 10.702 19.360 -2.037 9.385 10.934 17.482
HORIZONTAL SHEAR IN X -DIRECTION x4 tonne 0.897 0.400 1.398 1.466 0.283 0.976 1.011 2.441
HORIZONTAL SHEAR IN Y-DIRECTION y4 tonne 0.479 0.178 0.785 2.580 1.770 0.420 0.113 0.968
MOMENT ABOUT Y-Y DUE TO HOR SHEAR IN X-DIR MyLb t-m 2.977 1.323 4.659 4.847 0.961 3.263 3.372 8.206
MOMENT ABOUT X-X DUE TO HOR SHEAR IN Y-DIR MxLb t-m 1.579 0.588 2.590 8.514 5.841 1.386 0.373 3.196

INPUT WATER TABLE HEIGHT FROM FGL Hw m 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000

CAL CULATIONS:
LENGTH OF MAT L Lx+LL+LR m 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400
WIDTH OF MAT B Ly+LF+LB m 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600
2
AREA OF MAT A L*B m 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240
THICKNESS OF THE RAFT T m 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
TOTAL VERTICAL LOAD Wapp prt+prb+pLt+pLb t 31.791 30.655 32.969 32.009 31.560 34.551 38.246 83.539
SELFWEIGHT OF RAFT WR A*T*2.5 t 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300
PEDESTAL WIDTH (top right) pw1 m 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
PEDESTAL DEPTH (top right) pd1 m 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
PEDESTAL WIDTH (bot right) pw2 m 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
PEDESTAL DEPTH (bot right) pd2 m 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
PEDESTAL WIDTH (top left) pw3 m 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
PEDESTAL DEPTH (top left) pd3 m 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
PEDESTAL WIDTH (bot left) pw4 m 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
PEDESTAL DEPTH (bot left) pd4 m 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
SELFWEIGHT OF PEDESTALS WP (sum area ped)(H-T+Ht)*2.5 t 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310
3
UNIT WEIGHT OF SOIL s t/m 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800
SOIL WEIGHT WS (A-(4xPWxPD))x(H-T)xs t 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095
TOTAL WEIGHT WT Wapp+WR+WP+WS t 151.496 150.360 152.674 151.714 151.265 154.256 157.951 203.244

CG OF APPLIED LOAD
TOTAL APPILED MOMENT ABOUT Y-Y Mapp-y MyRt+MyRb+MyLt+MyLb t-m 7.742 16.966 19.404 10.968 7.079 8.568 8.027 20.269
TOTAL APPILED MOMENT ABOUT X-X Mapp-x MxRt+MxRb+MXLt+MXLb t-m 7.197 6.713 7.736 29.021 31.488 7.242 7.810 18.426

Weight of top right pedestal Wp1 pw1xpd1*(H-T+Ht)*2.5 t 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328
Weight of bottom right pedestal Wp2 pw2xpd2*(H-T+Ht)*2.5 t 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328
Weight of top left pedestal Wp3 pw3xpd3*(H-T+Ht)*2.5 t 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328
Weight of bottom left pedestal Wp4 pw4xpd4*(H-T+Ht)*2.5 t 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328

SH 4 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

0.001 0.171 0.560 1.939 2.822 0.424 0.784 0.299 0.061 0.205 0.594 1.905 2.856 0.458 0.818 0.333 0.027 0.135
0.807 5.036 7.321 0.295 2.536 1.921 1.614 0.225 0.532 4.936 7.421 0.196 2.636 2.021 1.714 0.324 0.631 5.143
0.076 0.588 1.871 6.824 9.763 1.409 2.653 0.996 0.269 0.701 1.983 6.712 9.875 1.521 2.765 1.109 0.157 0.468

7.260 5.619 8.808 17.467 -3.930 7.491 9.040 6.915 5.366 6.315 9.504 18.162 -3.234 8.187 9.736 7.611 6.062 4.899
0.782 0.123 1.121 1.189 0.006 0.700 0.735 0.540 0.505 0.179 1.177 1.245 0.063 0.756 0.791 0.596 0.561 0.061
0.844 0.080 0.686 2.481 1.869 0.321 0.014 0.438 0.746 0.108 0.715 2.510 1.840 0.350 0.043 0.467 0.774 0.042
2.583 0.429 3.727 3.931 0.030 2.332 2.440 1.806 1.684 0.614 3.912 4.117 0.214 2.516 2.624 1.992 1.870 0.224
2.786 0.262 2.264 8.189 6.166 1.061 0.047 1.447 2.460 0.357 2.359 8.283 6.072 1.155 0.142 1.541 2.555 0.137

3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000

4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400
4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600
20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240
0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
25.337 21.434 23.748 22.788 22.340 25.330 29.026 19.812 16.117 23.262 25.576 24.616 24.168 27.158 30.854 21.640 17.945 19.177
25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300
0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310
1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800
85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095
145.042 141.139 143.453 142.493 142.045 145.035 148.731 139.517 135.822 142.967 145.281 144.321 143.873 146.863 150.559 141.345 137.650 138.882

7.713 15.329 17.418 9.549 4.847 6.582 6.041 5.487 5.514 15.571 17.912 9.844 5.289 7.076 6.535 5.927 5.957 14.997
6.829 4.694 5.726 29.148 31.362 5.232 5.799 5.145 5.226 5.108 6.139 29.121 31.388 5.645 6.213 5.560 5.416 4.176

2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328
2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328
2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328
2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328

SH 5 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

0.524 1.975 2.786 0.388 0.747 0.263 0.097 0.265 0.576 1.423 2.386 0.468 0.755 0.368 0.080
7.214 0.403 2.429 1.814 1.507 0.117 0.424 3.574 6.312 0.218 2.484 1.992 1.746 0.635 0.880
1.752 6.943 9.643 1.290 2.534 0.877 0.388 0.898 1.918 5.038 8.231 1.548 2.543 1.225 0.322

8.088 16.746 -4.651 6.771 8.320 6.194 4.646 7.590 10.141 17.068 -0.049 9.088 10.327 8.627 7.388
1.059 1.127 0.056 0.638 0.673 0.478 0.443 0.455 1.253 1.308 0.362 0.916 0.944 0.789 0.761
0.648 2.443 1.907 0.283 0.024 0.400 0.708 0.224 0.710 2.146 1.334 0.418 0.172 0.511 0.757
3.523 3.727 0.192 2.127 2.236 1.602 1.479 1.505 4.173 4.324 1.215 3.057 3.143 2.607 2.512
2.139 8.063 6.292 0.935 0.078 1.321 2.335 0.740 2.341 7.081 4.403 1.379 0.568 1.688 2.498

3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000

4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400
4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600
20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240 20.240
0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
21.491 20.531 20.083 23.073 26.768 17.555 13.859 29.404 31.255 30.487 30.128 32.520 35.477 28.106 25.149
25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300 25.300
0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475
9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310 9.310
1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800
85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095 85.095
141.196 140.236 139.788 142.778 146.473 137.260 133.564 149.109 150.960 150.192 149.833 152.225 155.182 147.811 144.854

16.929 9.275 4.900 6.094 5.553 4.940 4.963 14.294 16.598 9.818 6.854 7.930 7.497 7.333 7.361
5.208 29.177 31.332 4.714 5.438 4.627 4.949 6.489 7.307 23.154 25.254 6.912 7.366 6.850 6.576

2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328
2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328
2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328
2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328 2.328

SH 6 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

Weight of soil at top right pedestal Ws1 pw1xpd1*(H-T)*s t 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496
Weight of soil at bottom right pedestal Ws2 pw2xpd2*(H-T)*s t 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496
Weight of soil at top left pedestal Ws3 pw3xpd3*(H-T)*s t 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496
Weight of soil at bottom left pedestal Ws4 pw4xpd4*(H-T)*s t 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496
LxBx(H-T)sxL/2-
Ws1xLx+LL-Ws2xLx+LL-
Ws3xLL-Ws4xLL
Moment of soil weight about Y-Y Msx tm 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209
LxBx(H-T)sxB/2-
Ws1xLf+Ly-Ws2xLf-
Moment of soil weight about X-X Msy Ws3xLf+Ly-Ws4xLf tm 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719

TAKING MOMENT ABT LOWER LEFT CORNER-CG..


((prt*Lx+LL)+(prb*LX+LL)+(
pLt*LL)+(pLb*LL)+
(WR)*L/2)+(Wp1*Lx+LL)+
(Wp2*Lx*LL)+(Wp3*LL)+
(Wp4*LL)+Msx/WT
X-BAR X-bar m 2.275 2.450 2.097 2.280 2.268 2.271 2.259 2.506
((prt*Ly+LF)+(pLT*Ly+LF)
+(pLB*LF)+(pRb*LF)+(WR)
*B/2+(Wp1*Lf+Ly)+(Wp2
*Lf)+(Wp3*Lf+Ly)+(Wp4*
Ly)+Msy)/WT
Y-BAR Y-bar m 2.145 2.143 2.147 1.758 2.563 2.166 2.154 1.957
Ex Ex L/2-X-bar m -0.075 -0.250 0.103 -0.080 -0.068 -0.071 -0.059 -0.306
Ey Ey B/2-Y-bar m 0.155 0.157 0.153 0.542 -0.263 0.134 0.146 0.343
MOMENT DUE TO Ex (about Y-Y) Mey Ex*WT t-m -11.288 -37.655 15.766 -12.134 -10.293 -10.926 -9.264 -62.091
MOMENT DUE TO Ey (about X-X) Mex Ey*WT t-m 23.493 23.62 23.294 82.303 -39.711 20.693 23.124 69.627
TOTAL Moment about X-X Mx Mapp-x+Mex t-m 30.690 30.33 31.030 111.324 -8.223 27.935 30.934 88.053
TOTAL Moment about Y-Y My Mapp-y+Mey t-m -3.546 -20.689 35.17 -1.165 -3.214 -2.359 -1.238 -41.822
3
Zxx Zxx 1/6(B*B*L) m 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517
Zyy Zyy 1/6(L*L*B) m3 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843
2
Mx/Zx Mx/Zx Mx/Zx t/m 1.978 1.955 2.000 7.174 -0.530 1.800 1.994 5.674
2
My/Zy My/Zy My/Zy t/m -0.239 -1.394 2.369 -0.079 -0.217 -0.159 -0.083 -2.818
2
P/A P/A WT/A t/m 7.485 7.429 7.543 7.496 7.474 7.621 7.804 10.042
2
pressure at bottom left - 1 P1 P/A+ Mx/Zx+My/Zy t/m 9.224 7.990 11.912 14.591 6.727 9.263 9.714 12.899
2
Pressure at top right - 3 P2 P/A- Mx/Zx-My/Zy t/m 5.746 6.868 3.174 0.400 8.220 5.980 5.894 7.185
2
pressure at top left -2 P3 P/A- Mx/Zx+My/Zy t/m 5.268 4.080 7.913 0.243 7.787 5.662 5.727 1.550
2
pressure at right bottom -4 P4 P/A+ Mx/Zx-My/Zy t/m 9.702 10.777 7.173 14.748 7.160 9.580 9.881 18.534

NO NO NO NO NO NO NO NO
CHECK FOR BEARING TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION

SH 7 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496
1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496
1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496
1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496

187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209

195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719

2.292 2.414 2.038 2.233 2.220 2.224 2.212 2.230 2.243 2.413 2.042 2.234 2.221 2.225 2.213 2.231 2.244 2.415

2.135 2.191 2.195 1.781 2.638 2.215 2.200 2.171 2.185 2.181 2.185 1.775 2.622 2.204 2.190 2.161 2.175 2.201
-0.092 -0.214 0.162 -0.033 -0.020 -0.024 -0.012 -0.030 -0.043 -0.213 0.158 -0.034 -0.021 -0.025 -0.013 -0.031 -0.044 -0.215
0.165 0.109 0.105 0.519 -0.338 0.085 0.100 0.129 0.115 0.119 0.115 0.525 -0.322 0.096 0.110 0.139 0.125 0.099
-13.312 -30.248 23.173 -4.726 -2.886 -3.519 -1.857 -4.243 -5.905 -30.398 23.023 -4.876 -3.036 -3.669 -2.007 -4.393 -6.055 -29.860
23.862 15.320 14.997 74.005 -48.009 12.395 14.826 17.995 15.563 17.028 16.704 75.713 -46.301 14.102 16.534 19.702 17.270 13.801
30.690 20.014 20.722 103.153 -16.647 17.627 20.626 23.139 20.790 22.136 22.842 104.834 -14.913 19.748 22.746 25.262 22.687 17.976
-5.599 -14.919 40.591 4.822 1.961 3.062 4.183 1.243 -0.391 -14.827 40.935 4.968 2.254 3.406 4.528 1.534 -0.098 -14.863
15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517
14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843
1.978 1.290 1.335 6.648 -1.073 1.136 1.329 1.491 1.340 1.427 1.472 6.756 -0.961 1.273 1.466 1.628 1.462 1.158
-0.377 -1.005 2.735 0.325 0.132 0.206 0.282 0.084 -0.026 -0.999 2.758 0.335 0.152 0.230 0.305 0.103 -0.007 -1.001
7.166 6.973 7.088 7.040 7.018 7.166 7.348 6.893 6.711 7.064 7.178 7.130 7.108 7.256 7.439 6.983 6.801 6.862
8.767 7.258 11.158 14.013 6.077 8.508 8.959 8.468 8.024 7.491 11.408 14.221 6.299 8.758 9.210 8.715 8.256 7.019
5.566 6.689 3.017 0.068 7.959 5.824 5.737 5.318 5.397 6.636 2.948 0.040 7.918 5.754 5.668 5.252 5.345 6.705
4.811 4.678 8.487 0.717 8.223 6.236 6.301 5.486 5.344 4.638 8.464 0.709 8.221 6.213 6.278 5.459 5.332 4.702
9.521 9.268 5.688 13.363 5.813 8.095 8.396 8.301 8.077 9.489 5.892 13.552 5.995 8.299 8.599 8.508 8.269 9.022

NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO
TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION

SH 8 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496
1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496
1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496
1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496 1.496

187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209 187.209

195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719 195.719

2.033 2.231 2.218 2.222 2.210 2.228 2.241 2.407 2.122 2.270 2.260 2.263 2.253 2.269 2.279

2.205 1.783 2.654 2.224 2.209 2.180 2.195 2.151 2.154 1.839 2.489 2.169 2.159 2.135 2.145
0.167 -0.031 -0.018 -0.022 -0.010 -0.028 -0.041 -0.207 0.078 -0.070 -0.060 -0.063 -0.053 -0.069 -0.079
0.095 0.517 -0.354 0.076 0.091 0.120 0.105 0.149 0.146 0.461 -0.189 0.131 0.141 0.165 0.155
23.561 -4.338 -2.498 -3.131 -1.469 -3.855 -5.517 -30.930 11.807 -10.513 -9.041 -9.548 -8.218 -10.127 -11.456
13.477 72.486 -49.528 10.876 13.307 16.475 14.044 22.275 22.016 69.223 -28.388 19.935 21.880 24.414 22.469
18.685 101.663 -18.196 15.590 18.744 21.102 18.993 28.764 29.323 92.377 -3.134 26.847 29.246 31.264 29.045
40.491 4.937 2.402 2.963 4.084 1.085 -0.554 -16.636 28.404 -0.695 -2.187 -1.618 -0.721 -2.794 -4.095
15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517 15.517
14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843 14.843
1.204 6.552 -1.173 1.005 1.208 1.360 1.224 1.854 1.890 5.953 -0.202 1.730 1.885 2.015 1.872
2.728 0.333 0.162 0.200 0.275 0.073 -0.037 -1.121 1.914 -0.047 -0.147 -0.109 -0.049 -0.188 -0.276
6.976 6.929 6.907 7.054 7.237 6.782 6.599 7.367 7.458 7.421 7.403 7.521 7.667 7.303 7.157
10.908 13.813 5.896 8.259 8.720 8.215 7.786 8.100 11.262 13.327 7.054 9.142 9.503 9.129 8.753
3.044 0.044 7.917 5.850 5.754 5.349 5.412 6.634 3.655 1.514 7.752 5.900 5.831 5.476 5.561
8.500 0.710 8.241 6.249 6.304 5.495 5.338 4.393 7.482 1.421 7.457 5.682 5.734 5.100 5.009
5.452 13.148 5.572 7.859 8.170 8.068 7.860 10.342 7.434 13.421 7.348 9.360 9.600 9.506 9.305

NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO
TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION TENSION

SH 9 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

Allowable bearing SBC * (1 OR 1.25) + s*H 17.4 20.4 20.4 20.4 20.4 20.4 20.4 20.4
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

Contact area of footing with soil b'n 1&2 100 100 100 100 100 100 100 100
Contact area of footing with soil b'n 2&3 100 100 100 100 100 100 100 100
Contact area of footing with soil b'n 3&4 100 100 100 100 100 100 100 100
Contact area of footing with soil b'n 1&4 100 100 100 100 100 100 100 100
Average contact area 100 100 100 100 100 100 100 100
For wind contact area is increased by 20% 100 120 120 120 120 120 120 120
Check for 80% contact area SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

k factor for redistribution of pressure in X direction 0.90 0.66 1.14 0.89 0.91 0.90 0.92 0.58
k factor for redistribution of pressure in Y direction 1.20 1.20 1.20 1.71 0.66 1.17 1.19 1.45

Maximum base Pressure k*WT/LB 9.00 8.95 9.04 12.80 6.78 8.95 9.29 14.53
Check for allowable pressure SBC * (1 OR 1.25) + s*H 17.4 20.4 20.4 20.4 20.4 20.4 20.4 20.4
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
CHECK FOR FACTOR OF SAFETY ABT X-X

OVERTURNING MOMENT OTM Mx t-m 30.69 30.33 31.03 111.32 -8.22 27.94 30.93 88.05
RESISTING MOMENT RTM WT x (B/2+EY) t-m 371.93 369.45 374.44 431.24 308.20 375.48 386.41 537.09
FOS 12.12 12.18 12.07 3.87 -37.48 13.44 12.49 6.10
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
CHECK FOR FACTOR OF SAFETY ABT Y-Y

OVERTURNING MOMENT OTM My t-m -3.55 -20.69 35.17 -1.17 -3.21 -2.36 -1.24 -41.82
RESISTING MOMENT RTM WT x (L/2 + Ex) t-m 322.00 293.14 351.65 321.64 322.49 328.44 338.23 385.05
FOS -90.81 -14.17 10.00 -275.99 -100.32 -139.25 -273.31 -9.21
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

CHECK FOR UPLIFT PRESSURE

Total uplift pressure Pw (H-Hw)*1*A tonne 0 0 0 0 0 0 0 0


Total Reisting pressure WT tonne 151.50 150.36 152.67 151.71 151.27 154.26 157.95 203.24
FOS WT/Pw #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
CHECK FOR SLIDING X DIRECTION

Distributing force Px X1+X2+X3+X4 tonne 2.3254 5.1326 5.8423 3.3012 2.1263 2.5615 2.4019 6.0227
Restoring force including uplift Prx 0.5(Wr-Pw) tonne 75.75 75.18 76.34 75.86 75.63 77.13 78.98 101.62
FOS Prx/Px 32.57 14.65 13.07 22.98 35.57 30.11 32.88 16.87
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
CHECK FOR SLIDING Y DIRECTION

Distributing force Py Y1+Y2+Y3+Y4 tonne 2.17 2.02 2.33 8.50 9.22 2.19 2.32 5.55
Restoring force including uplift Pry 0.5(Wr-Pw) tonne 75.75 75.18 76.34 75.86 75.63 77.13 78.98 101.62
SH 10 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

20.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
120 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

0.87 0.71 1.22 0.95 0.97 0.97 0.98 0.96 0.94 0.71 1.22 0.95 0.97 0.97 0.98 0.96 0.94 0.71
1.21 1.14 1.14 1.68 0.56 1.11 1.13 1.17 1.15 1.16 1.15 1.68 0.58 1.13 1.14 1.18 1.16 1.13

8.70 7.96 8.65 11.81 6.82 7.96 8.30 8.05 7.71 8.16 8.73 12.01 6.90 8.16 8.50 8.25 7.91 7.75
20.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

30.69 20.01 20.72 103.15 -16.65 17.63 20.63 23.14 20.79 22.14 22.84 104.83 -14.91 19.75 22.75 25.26 22.69 17.98
357.46 339.94 344.94 401.74 278.69 345.98 356.91 338.88 327.95 345.85 350.85 407.65 284.61 351.89 362.82 344.80 333.86 333.23
11.65 16.99 16.65 3.89 -16.74 19.63 17.30 14.65 15.77 15.62 15.36 3.89 -19.08 17.82 15.95 13.65 14.72 18.54
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

-5.60 -14.92 40.59 4.82 1.96 3.06 4.18 1.24 -0.39 -14.83 40.94 4.97 2.25 3.41 4.53 1.53 -0.10 -14.86
305.78 280.26 338.77 308.76 309.61 315.56 325.35 302.69 292.90 284.13 342.64 312.63 313.48 319.43 329.22 306.57 296.77 275.68
-54.61 -18.79 8.35 64.03 157.87 103.04 77.77 243.43 -749.28 -19.16 8.37 62.93 139.11 93.77 72.71 199.82 -3042.90 -18.55
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145.04 141.14 143.45 142.49 142.04 145.04 148.73 139.52 135.82 142.97 145.28 144.32 143.87 146.86 150.56 141.34 137.65 138.88
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

2.3264 4.6375 5.2548 2.8806 1.4643 1.974 1.8143 1.655 1.6646 4.7109 5.4043 2.9696 1.5982 2.1234 1.9638 1.7887 1.7982 4.5362
72.52 70.57 71.73 71.25 71.02 72.52 74.37 69.76 67.91 71.48 72.64 72.16 71.94 73.43 75.28 70.67 68.82 69.44
31.17 15.22 13.65 24.73 48.50 36.74 40.99 42.15 40.80 15.17 13.44 24.30 45.01 34.58 38.33 39.51 38.27 15.31
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

2.03 1.41 1.72 8.54 9.18 1.58 1.71 1.55 1.54 1.54 1.85 8.53 9.19 1.70 1.83 1.68 1.60 1.25
72.52 70.57 71.73 71.25 71.02 72.52 74.37 69.76 67.91 71.48 72.64 72.16 71.94 73.43 75.28 70.67 68.82 69.44
SH 11 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

1.23 0.96 0.98 0.97 0.99 0.96 0.94 0.72 1.11 0.90 0.92 0.91 0.93 0.91 0.89
1.12 1.67 0.54 1.10 1.12 1.16 1.14 1.19 1.19 1.60 0.75 1.17 1.18 1.22 1.20

8.56 11.60 6.74 7.76 8.09 7.84 7.50 8.80 8.88 11.88 6.79 8.81 9.08 8.88 8.60
17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4 17.4
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

18.68 101.66 -18.20 15.59 18.74 21.10 18.99 28.76 29.32 92.38 -3.13 26.85 29.25 31.26 29.05
338.23 395.03 271.98 339.27 350.20 332.17 321.24 365.22 369.22 414.66 316.23 370.05 378.80 364.38 355.63
18.10 3.89 -14.95 21.76 18.68 15.74 16.91 12.70 12.59 4.49 -100.91 13.78 12.95 11.65 12.24
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

40.49 4.94 2.40 2.96 4.08 1.08 -0.55 -16.64 28.40 -0.70 -2.19 -1.62 -0.72 -2.79 -4.09
334.19 304.18 305.04 310.98 320.77 298.12 288.32 297.11 343.92 319.91 320.59 325.35 333.18 315.06 307.22
8.25 61.61 127.01 104.96 78.55 274.88 -520.73 -17.86 12.11 -460.02 -146.59 -201.08 -462.00 -112.77 -75.03
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
141.20 140.24 139.79 142.78 146.47 137.26 133.56 149.11 150.96 150.19 149.83 152.23 155.18 147.81 144.85
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

5.1075 2.7984 1.4809 1.8268 1.6671 1.4886 1.4983 4.3233 4.9983 2.9557 2.0605 2.3737 2.246 2.213 2.2206
70.60 70.12 69.89 71.39 73.24 68.63 66.78 74.55 75.48 75.10 74.92 76.11 77.59 73.91 72.43
13.82 25.06 47.20 39.08 43.93 46.10 44.57 17.24 15.10 25.41 36.36 32.07 34.55 33.40 32.62
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

1.57 8.55 9.18 1.42 1.60 1.40 1.46 1.95 2.20 6.78 7.40 2.09 2.19 2.07 1.96
70.60 70.12 69.89 71.39 73.24 68.63 66.78 74.55 75.48 75.10 74.92 76.11 77.59 73.91 72.43
SH 12 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

FOS Pry/Py 34.85 37.25 32.72 8.92 8.20 35.30 34.08 18.31
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

CHECK FOR PUNCHING STRESS


RTP

Allowable shear stress under limit state SS Ks x tc N/mm2 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
Beeta-c min of pw1/pd1 or pd1/pw1 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
Ks 0.5 + Beeta c 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
tc 0.25 √ fck 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
Depth required D (Prt - BP*pw1*pd1)/(2pw1+2pd1)*SS mm 8.68 30.67 -18.07 -23.53 37.82 12.66 13.59 34.65
check SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

RBP

2
Allowable shear stress under limit state SS Ks x tc N/mm 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
Beeta-c min of pw2/pd2 or pd2/pw2 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
Ks 0.5 + Beeta c 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
tc 0.25 √ fck 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
Depth required D (Prb - BP*pw2*pd2)/(2pw2+2pd2)*SS mm 39.90 42.54 33.01 60.70 12.96 41.07 44.55 146.93
check SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

LTP

Allowable shear stress under limit state SS Ks x tc N/mm2 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
Beeta-c min of pw3/pd3 or pd3/pw3 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
Ks 0.5 + Beeta c 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
tc 0.25 √ fck 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
Depth required D (Plt - BP*pw3*pd3)/(2pw3+2pd3)*SS mm 0.96 -26.05 24.58 -45.02 45.89 5.68 8.29 -0.52
check SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

LBP

2
Allowable shear stress under limit state SS Ks x tc N/mm 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
Beeta-c min of pw4/pd4 or pd4/pw4 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
Ks 0.5 + Beeta c 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
tc 0.25 √ fck 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
Depth required D (Plb - BP*pw4*pd4)/(2pw4+2pd4)*SS mm 22.35 14.96 25.66 55.02 -18.15 23.60 29.11 43.08
check SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

SH 13 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

35.73 50.04 41.59 8.35 7.73 45.99 43.51 44.90 44.02 46.54 39.26 8.46 7.83 43.13 41.03 42.09 43.01 55.39
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
3.77 26.37 -23.32 -28.81 31.61 7.81 8.55 0.21 -0.61 26.99 -22.74 -28.17 32.52 8.40 9.14 0.80 0.05 25.21
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
35.25 24.82 14.34 42.00 -6.68 22.80 26.09 20.81 17.45 27.29 16.76 44.48 -3.93 25.23 28.51 23.24 19.94 21.88
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
-6.37 -26.19 23.49 -46.14 43.84 4.99 7.41 -4.08 -6.59 -25.80 23.84 -45.74 44.50 5.33 7.76 -3.73 -6.17 -26.99
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
15.58 9.66 19.40 48.75 -25.36 17.75 23.07 15.60 10.20 12.03 21.74 51.13 -22.71 20.08 25.40 17.94 12.61 7.23
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

SH 14 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

45.02 8.21 7.62 50.26 45.78 49.12 45.79 38.17 34.24 11.07 10.13 36.48 35.40 35.74 36.92
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
-24.48 -30.03 30.11 6.65 7.38 -0.95 -1.81 25.49 -13.52 -17.74 31.90 11.12 11.86 4.81 4.01
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
11.40 39.00 -9.95 19.86 23.14 17.88 14.47 38.91 31.27 53.56 15.93 37.77 40.55 35.95 33.12
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
22.69 -47.00 42.69 4.18 6.60 -4.88 -7.43 -20.64 19.84 -35.70 37.59 4.77 6.86 -2.71 -4.86
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12
16.98 46.26 -28.13 15.32 20.63 13.18 7.74 15.80 24.35 47.98 -10.00 22.74 27.15 20.80 16.34
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE

SH 15 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

DESIGN OF FOOTING REINFORCEMENTS

Maximum base pressure under normal condition = 12.01


Maximum base pressure under wind / seismic condition = 14.53
2
MAXIMUM BASE PRESSURE (1) (under limit state) 12.01 t/m Hence condition is normal
2
Uplift due to water pressure (2) 0.00 t/m
self weight of soil and base raft (3) 5.45 t/m2

Design base pressure = (1)+(2)-(3) 6.56 t/m2

2
DESIGN BASE PRESSURE 6.56 t/m

Calculation of Bending moment and Shear Force

Moment on left cantilever Mlc BP x LL X LL / 2 t-m 0.82


Moment on Right cantilever Mrc BP x LR X LR / 2 t-m 0.82
Moment at middle of X direction Mx BP*L*L/2 - P*Lx/2 t-m -8.65
Shear force at d/2 from left face of cantilever Vlc BP*(LL-pw3/2-d/2) t 0.29
shear force at d/2 from L.col towards middle Vxl BP*(LL+pw3/2+d/2))-(P) t -8.16
Shear force at d/2 from right face of cantilever Vrc (BP*(LR-pw1/2-d/2)) t 0.29
shear force at d/2 from R.col towards middle Vxr (BP*(LR+pw1/2+d/2))-(P) t -8.16

Moment on front cantilever Mfc BP x LF X LF / 2 t-m 1.18


Moment on back cantilever Mrc BP x LB X LB / 2 t-m 1.18
Moment at middle of Y direction MY BP*B*B/2 - P*LY/2 t-m -8.29
Shear force at d/2 from front face of cantilever Vfc BP*(LF-pd4/2-d/2) t 0.95
shear force at d/2 from F.col towards middle Vyf BP*(LF+pd4/2+d/2))-(P) t -8.16
Shear force at d/2 from Back face of cantilever Vbc (BP*(LB-pd1/2-d/2)) t 0.21
shear force at d/2 from B.col towards middle Vyb (BP*(LB+pd1/2+d/2))-(P) t -7.42

1. Reinforcement details for right / left side cantilever


Provide reinforcement at BOTTOM
b= 1000 mm
M= 8.19E+06 Nmm d= 435 mm
V= 2.95E+03 N fy = 500 N/sqmm
fck = 20 N/sqmm

Condition Norm (1) Wind/Seis (2) 1

Mu 12291436.19 Nmm
Vu 4424.92 N
xu, max/d = 0.46 Ref IS 456
2
Mu lim = 502301034.07 Nmm [ Mu lim = 0.36 (xu, max/d) (1 - 0.42 xu, max/d ) b d fck ]

Singly reinforced beam possible SINCE Mu lim > Mu


SH 16 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

xu = 1041.74 and 3.94 [xu = (d ± (d 2 - (4.62Mu/fckb))/2*0.416

Choose xu = 3.94

Ast = 65.17 sqmm [Ast = 0.36 fck b xu / 0.87 fy ]


minimum Reinforcement = 0.12% of Gross area 600 sqmm
Minimum reinforcement is greater than required Ast hence provide minimum reinforcement

Consider 12 dia Spacing = 188.6 mm


Provided 12 dia Spacing = 150 mm
Hence Ast = 754.28571429 sqmm

Design of shear reinforcement

tv = Vu / bd = 0.010172223053 N/sqmm

100 Ast /bd = 0.17339901478 Hence from IS 456 tc is 0.31 N/sqmm

Hence Shear reinforcement is not required AS tc is > tv

2. Reinforcement details at midspan along X direction


Provide reinforcement at TOP
b= 1000 mm
M= 8.65E+07 Nmm d= 435 mm
V= 8.16E+04 N fy = 500 N/sqmm
fck = 20 N/sqmm

Condition Norm (1) Wind/Seis (2) 1

Mu 129797566.16 Nmm
Vu 122422.70445 N
xu, max/d = 0.456 Ref IS 456
2
Mu lim = 502301034.07 Nmm [ Mu lim = 0.36 (xu, max/d) (1 - 0.42 xu, max/d ) b d fck ]

Singly reinforced beam possible SINCE Mu lim > Mu

2
xu = 1002.465237 and 43.21 [xu = (d ± (d - (4.62Mu/fckb))/2*0.416

Choose xu = 43.207839901

Ast = 715.16424664 sqmm [Ast = 0.36 fck b xu / 0.87 fy ]


minimum Reinforcement = 0.12% of Gross area 600 sqmm
Reinforcement is provided for the calculated steel area

SH 17 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

Consider 12 dia Spacing = 158.2 mm


Provide 12 dia Spacing = 125 mm
Hence Ast = 905.14285714 sqmm

Design of shear reinforcement

tv = Vu / bd = 0.28143150448 N/sqmm

100 Ast /bd = 0.20807881773 Hence from IS 456 tc is 0.33 N/sqmm

Hence Shear reinforcement is not required AS tc is > tv

3. Reinforcement details for front / Rear side cantilever


Provide reinforcement at BOTTOM
b= 1000 mm
M= 1.18E+07 Nmm d= 435 mm
V= 9.51E+03 N fy = 500 N/sqmm
fck = 20 N/sqmm

Condition Norm (1) Wind/Seis (2) 1

Mu 17699668.113 Nmm
Vu 14258.06598 N
xu, max/d = 0.456 Ref IS 456
2
Mu lim = 502301034.07 Nmm [ Mu lim = 0.36 (xu, max/d) (1 - 0.42 xu, max/d ) b d fck ]

Singly reinforced beam possible SINCE Mu lim > Mu

2
xu = 1039.9937125 and 5.68 [xu = (d ± (d - (4.62Mu/fckb))/2*0.416

Choose xu = 5.6793644231

Ast = 94.00327321 sqmm [Ast = 0.36 fck b xu / 0.87 fy ]


minimum Reinforcement = 0.12% of Gross area 600 sqmm
Minimum reinforcement is greater than required Ast hence provide minimum reinforcement

Consider 12 dia Spacing = 188.6 mm


Provided 12 dia Spacing = 150 mm
Hence Ast = 754.28571429 sqmm

Design of shear reinforcement

tv = Vu / bd = 0.032777163172 N/sqmm

SH 18 OF 19
STAC CONSULTANTS COMPAGNIE D'ELECTRICITE DU SENEGAL PROJECT: 1X125 MW THERMAL POWER PLANT AT SENDOU
PROMAC ENGINEERING INDUSTRIES LTD PIPE RACK FOUNDATION PR4

100 Ast /bd = 0.17339901478 Hence from IS 456 tc is 0.31 N/sqmm

Hence Shear reinforcement is not required AS tc is > tv

4. Reinforcement details at midspan along Y direction


Provide reinforcement at TOP
b= 1000 mm
M= 8.29E+07 Nmm d= 435 mm
V= 8.16E+04 N fy = 500 N/sqmm
fck = 20 N/sqmm

Condition Norm (1) Wind/Seis (2) 1

Mu 124389334.24 Nmm
Vu 122422.70445 N
xu, max/d = 0.456 Ref IS 456
2
Mu lim = 502301034.07 Nmm [ Mu lim = 0.36 (xu, max/d) (1 - 0.42 xu, max/d ) b d fck ]

Singly reinforced beam possible SINCE Mu lim > Mu

2
xu = 1004.3429801 and 41.33 [xu = (d ± (d - (4.62Mu/fckb))/2*0.416

Choose xu = 41.330096783

Ast = 684.08436055 sqmm [Ast = 0.36 fck b xu / 0.87 fy ]


minimum Reinforcement = 0.12% of Gross area 600 sqmm
Reinforcement is provided for the calculated steel area

Consider 12 dia Spacing = 165.4 mm


Provide 12 dia Spacing = 125 mm
Hence Ast = 905.14285714 sqmm

Design of shear reinforcement

tv = Vu / bd = 0.28143150448 N/sqmm

100 Ast /bd = 0.20807881773 Hence from IS 456 tc is 0.33 N/sqmm

Hence Shear reinforcement is not required AS tc is > tv

SH 19 OF 19