, CG
&
Lean Operations
"Looking For Waste In
All the Right Places"What is Lean?
+ A systematic approach to identifying and
eliminating waste through continuous
stent eyxehyesee(e 01
ae ee Beis Corer Cy ii ame COMautey
products to be pulled through a continuous flow
NAVINI MOBI ment Ke nme Cnn TLTem
LEAD TIMEWhat is Waste?
All actions that take pl
two ways:
RET. Ci Cct|
Oeste
Seen nts oN
RO ore f pray
Sm ei taesan ne t Extra Processing
SEB On RUT
= , ae
een ere ny iting
Sues VOIOT
SR ren sere ty
Dee SCreut ic ricInventory
Excessive Inventory ties up cash and hides problems.
= Occupies valuable floor space
= Massive rework campaigns when problems surface
= Long lead time for engineering changes
= Slow response to changes in customer demands
Inventory Hides Waste
SEA OF INVENTORY our
MAINTENANCE: ‘SETUP
TES
SAD
Foorwork \ /— wousexeePn
eaLANoNe
Now enoqucTwe excessive KctiMUNEATONectationsNon-Manufacturing Waste
In the Office
* Non-Utilized Talent
* Waiting (need information from other departments)
* Information Waste
* Redundant inputs and outputs (ensure all processes and
tasks are completed once)
* Unnecessary data/ Data Dead-Ends (ensure it is needed
and going to the right place)
Ly Sh |
Wie
Ses
Nes° Extra
expects)
* TransportatiSet in Order
everything in its
place.
Tool cutoutsF ™
Sort and Set in Order
¢ A place for
everything and
everything in its
place.@pkeeceanbecnr cos 1
SE a
Pre Maes iene eee5S in Your OfficeBEFORE AFTER